Laserfiche WebLink
<MCordua@sfwater.org>; Sebastiani, Enio <esebastiani@sfwater.org>; Forner, Ed <br /><eforner@sfwater.org>; Carlevaris, Joseph <JCarlevaris@sfwater.org>; Jung, Jowin <br /><JJung@sfwater.org>; Baker, Lydia <lbaker@sjgov.org> <br />Subject: RE: Tesla Treatment Facility update April 2018 <br /> <br />Hi Brendan, Garrett, <br /> <br />Below is a summary on the on-going situation at the Tesla Treatment Facility (TTF). <br /> <br />The Tesla plant has been back on operation mode since March 11. A lamp break occurred on 3/20. <br />The incident report is attached. The emergency bypass system routed all water outside to the baker <br />tanks where it remains. <br /> <br />We have extended the rental period 6 months for the pump, baker tank, etc. which comprise the <br />emergency bypass system. This system is still in place, and functioned as expected during the most <br />recent lamp breaks. Discussions about permitting for on-site water disposal, permanent mitigation <br />design and root cause are ongoing. <br /> <br />Thanks, <br /> <br />Evan Jensen <br /> <br />Evan Jensen, Hydrologist <br />Water Supply and Treatment Division - Water Enterprise <br />San Francisco Public Utilities Commission <br />1000 El Camino Real <br />Millbrae, CA 94030 <br />Office: (650) 871-1010 <br />Mobile: (520) 304-4814 <br />ejensen@sfwater.org <br /> <br /> <br /> <br />