My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013559
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ASHLEY
>
6040
>
2600 - Land Use Program
>
PA-2000129
>
SU0013559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 2:27:06 PM
Creation date
8/10/2020 12:14:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013559
PE
2611
FACILITY_NAME
PA-2000129
STREET_NUMBER
6040
Direction
E
STREET_NAME
ASHLEY
STREET_TYPE
LN
City
STOCKTON
Zip
95212-
APN
08648014
ENTERED_DATE
8/4/2020 12:00:00 AM
SITE_LOCATION
6040 E ASHLEY LN
RECEIVED_DATE
7/31/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Requirements." (Grading that disturbs more than one acre will require a National Pollutant <br /> Discharge Elimination System permit.) <br /> h. A stop bar and stop sign shall be placed on Chandler Lane at the intersection of Ashley Lane. All <br /> traffic signs and markings shall conform to the latest edition of the Manual on Uniform Traffic Control <br /> Devices(MUTCD), and/or San Joaquin County Standards and shall be shown on the improvement <br /> plans. (Development Title Section 9-1150.2) <br /> i. All utilities shall be underground except power transmission facilities of a 35 KV or greater. Public <br /> utility easements shall be provided along the road frontage of the subdivision and as required by <br /> the public utility companies. (Development Title Section 9-1155.2) <br /> j. Dedication to result in a 25-foot wide right-of-way from the centerline of Ashley Lane to the property <br /> line shall be required on the Final Map along APN 086-480-14. (Development Title Section 9- <br /> 1150.5(b)) <br /> k. Ashley Lane shall be improved on the subdivided side to County Standards for one half of a 50- <br /> foot right-of-way Rural Road. (Development Title Section 9-1150.2(d)(3)) <br /> I. The developer shall provide separate drainage facilities for each lot in accordance with the San <br /> Joaquin County Development Standards. Roadside drainage shall be kept separate from parcel <br /> drainage. Retention basins shall be fenced with 6-foot-high chain link fence or equal when the <br /> maximum design depth is 18 inches or more. Required retention basin capacity shall be calculated <br /> and submitted along with a drainage plan for review and approval, prior to release of building permit. <br /> (Development Title Section 9-1135) <br /> m. Street lighting shall be provided for the subdivision at the intersection of Ashley Lane and Chandler <br /> Lane. (Development Title Section 9-1150.11)The property shall pay for the processing costs and <br /> transfer into Zone L-1 within CSA 49 prior to approval of the Final Map. In addition, the applicant <br /> shall pay for the maintenance and operation of the system until the transferred area is placed on <br /> the assessment role of the District. (Development Title Section 9-1100.5) <br /> n. All easements of record shall be shown on the Final Map. (Development Title Section 9-910.20) <br /> o. This project falls within the definition of a Priority Project as defined in either the County "Storm <br /> Water Quality Control Criteria Plan"(SWQCCP)or the County Phase I National Pollutant Discharge <br /> Elimination System (NPDES) permit and shall comply with the following conditions: <br /> 1. A registered professional engineer shall design a system or combination of systems to treat, <br /> filter, or infiltrate the 85th percentile storm as defined in the County's 2009 SWQCCP. The <br /> system design shall follow standards as outlined in the 2009 SWQCCP or in the "California <br /> Association of Stormwater Quality Agencies" (CASQA) publications and comply with the <br /> conditions of the County Phase I NPDES permit. CASQA documents are available at <br /> http://www.casga.orq <br /> 2. Applicant shall submit a"Storm Water Pollution Prevention Plan" (SWPPP)to Public Works for <br /> review. A SWPPP preparation guide is available at the Department of Public Works. A copy of <br /> the approved SWPPP and all required records, updates, test results and inspection reports <br /> shall be maintained on the construction site and be available for review upon request.The post <br /> construction chapter of the SWPPP must identify expected pollutants and how they will be <br /> prevented from entering the storm system. The chapter shall also contain a maintenance plan, <br /> a spill plan, and a training plan for all employees on proper use, handling and disposal of <br /> potential pollutants.The example plans are available in the SWQCCP and CASQA handbooks. <br /> 3. All Priority New Development and Significant Redevelopment Projects must meet the volume <br /> reduction requirement outline in the County's SWQCP 2009 available at <br /> PA-2000129 —Conditions of Approval 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.