Laserfiche WebLink
-4- <br /> PA-2000129 (SU) <br /> Longitude of all treatment devices shall be obtained by use of a global positioning <br /> system and reported to the County. Property owner shall execute an agreement and <br /> record a deed restriction, in a form acceptable to the County, regarding maintenance <br /> and perpetuation of the installed systems. Property owner shall be responsible for the <br /> ongoing operation and maintenance of any system installed unless the system is <br /> accepted for maintenance by a government agency. <br /> e) Owner shall be responsible for providing the County with an annual report of operation <br /> and maintenance of any system. The property owner shall also be responsible for the <br /> payment to the County of an annual system inspection fee established by Resolution of <br /> the Board of Supervisors. <br /> f) A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County will be required for the owner/operator of stormwater controls <br /> prior to the release of the building permit. <br /> g) Standard Best Management Practices for the type of development proposed shall be <br /> incorporated into the site storm drainage design. <br /> h) Applicant shall file a Notice of Intent (NOI) with the State Water Resources Control <br /> Board (SWRCB) and comply with the State"General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification Number <br /> (WDID), issued by SWRCB, shall be submitted to Public Works for file. Contact the <br /> SWRCB at(916) 341-5537 for further information. <br /> 16. Access rights shall be dedicated and restricted for Lots 4 through 9 along the frontage of <br /> Ashley Lane, except for the portion of Lot 9 to be used as a secondary fire access <br /> easement, and for Lots 1, 2, 3, 4, and 17 along properties owned by East Bay MUD and <br /> Central California Traction Company on the Final Map. (Development Title Section 9- <br /> 1150.5) <br /> 17. The secondary fire access easement connection to Ashley Lane shall be gated as <br /> approved by the fire district. <br /> Informational Notes: <br /> (i.) Any construction activity that results in the disturbance of at least one (1) acre of soil shall <br /> require a State NPDES construction permit. Dischargers whose projects disturb 1 or <br /> more acres of soil or whose projects disturb less than 1 acre of soil and is not part of a <br /> larger plan of development, are required to obtain coverage under the current General <br /> Permit for Discharges of Storm Water Associated with Construction Activity <br /> (www.swrcb.ca.gov/stormwtr/gen_const,html#const_permit). Construction activity subject <br /> to this permit includes clearing, grading and disturbances to the ground such as <br /> stockpiling, or excavation, but does not include regular maintenance activities performed <br /> to restore the original line, grade, or capacity of the facility. <br /> (ii.) This property is subject to the requirements of San Joaquin County Mosquito &Vector <br /> Control District(209-982-4675) and the California Health and Safety Code for the <br /> prevention of mosquitoes. Best Management Practices(BMP) guidelines for stormwater <br />