Laserfiche WebLink
to anchor points, and the two strap halves are connected to each other <br />atthe top of the tank. See Figure 1.5. <br />1.3.7.2.11. MOH anchor straps are to be installed in the following way: <br />• lift the strap with the hook end down and the hook facing away from the tank <br />• lower the hook end of the strap between the tank and the anchor <br />point, and hook the strap to the anchor point <br />• put a washerand a blind nut(acorn nut) on one end of the threaded rod. <br />• Feed the rod through the hole in the strap -end connector <br />• put a washer and a nut on the other end of the threaded rod <br />• centerthe wear plate on the top center line of the marked ribs <br />• lowerthe threaded rod, washer and nut into the channel section <br />on the strap -end connector, taking care to place the washer and <br />nut on the outside of the connector <br />• hand -tighten the nuts <br />1.3.7.2.12. Repeat the bulleted items in 1.3.7.2.12 for the second <br />rod of the assembly. <br />1.3.7.2.13. Afterthe two threaded rods are placed, tighten the threaded <br />rods, using a torque wrench to tighten to 25.30 foot-pounds, or until snug. <br />1.3.7.2.14. Repeat the bulleted items in 1.3.7.2.12 for each of the load <br />binder assemblies. <br />1.3.7.3. HARDWARE AND ANCHOR POINTS <br />1.3.7.3.1. When our anchoring hardware is not being used, the installing <br />contractor is responsible for providing hardware and anchor points <br />of sufficient size and strength for the tank being installed. <br />1.3.7.3.2. The particular configuration of hardware will be determined <br />by the contractor, the owner or the owner's representative, but is to adhere <br />to the following: <br />• Anchoring hardware must be manufactured to industry standards <br />and dimensions, and sized according to Table 1.3. <br />• All exposed metal on the anchoring system must be coated <br />or galvanized to protect against corrosion. <br />• If the hardware used is not provided by us, contact the hardware <br />manufacturer or supplier for specific information on hardware and its use. <br />Minimum Turnbuckle <br />Tank Diameter(byType) Minimum Wire <br />Diameter e Rope Diameter <br />Hook Jaw EY <br />4 -foot 3/a" i 1/2" '/z" , 3/e" <br />6 -foot 3/4" <br />1h" <br />/z" <br />3/e" <br />8 -foot <br />11/411 <br />3/a" <br />3/4" <br />100" [254 cm] <br />'h" <br />10 -foot <br />11/411 <br />3/a" <br />3/a" <br />43" [111 cm] <br />1h" <br />12 -foot <br />11/4 <br />3/a" <br />3/a" <br />8 -foot (Green Tank) <br />1h" <br />1.3.7.3.3. When D-ring/D-ring straps are shipped and turnbuckles <br />are ordered from us, we may ship extra hardware that may or may not <br />be necessary with alternate deadmen placement. <br />1.3.7.3.4. Locate the anchor points as shown in Figure 1-6 and <br />Table 1-4. Referto dimensions in Table 1.4. Align (within a tolerance <br />of ±1 inch) all anchor points. <br />Nominal Tank Diameter <br />A: Strap Eye <br />To Anchor Point <br />g: Alternate Dimension <br />C: Strap Length <br />D: Center of Tank <br />to Center of Deadmen <br />4 -foot <br />10" [25 cm] <br />not reccommended <br />100" [254 cm] <br />31" [79 cm] <br />6 -foot <br />23" [58 cm] <br />not reccommended <br />145" [368 cm] <br />43" [111 cm] <br />8 -foot (Red Tank) <br />29" [74 cm] <br />17" [43 cm] <br />181" [460 cm] <br />53" [135 cm] <br />8 -foot (Green Tank) <br />30" [76 cm] <br />18" [46 cm] <br />195" [495 cm] <br />57" [145 cm] <br />10 -foot (Red Tank) <br />38" [97 cm] <br />26" [66 cm] <br />236" [600 cm] <br />70" [178 cm] <br />10 -foot (Green Tank) <br />39" [100 cm] <br />27" [69 cm] <br />236" [600 cm] <br />71" [180 cm] <br />12 -foot <br />46" [117 cm] <br />34" [86 cm] <br />271" [688 cm] <br />88" [224 cm] <br />10 <br />