Laserfiche WebLink
!Pi;lp% <br /> PLAN KEYNOTES <br /> O SMOKE DETECTOR IN THE SUPPLY AIR PLENUM <br /> TO SHUT DOWN PACKAGED ROOFTOP UNIT <br /> UPON SMOKE DETECTION. COORDINATE WITH <br /> FIRE ALARM CONTRACTOR. COORDINATE FIRE <br /> ALARM OPERATION AND TESTING WITH FIRE DEPT. ROBISON <br /> VERIFY LOCATION PER LOCAL CODES. <br /> O2 22x18 SUPPLY AIR DUCT FROM RTU-1 ON ENGINEERING, INC <br /> ROOF. <br /> 19401 40TH AVE W.,SUITE 302 <br /> LYNNWOOD,WA 98036 <br /> O3 22x18 RETURN AIR DUCT FROM RTU-1 206-364.3343 TEL <br /> ON ROOF. <br /> CONTACT:MARK MANGLICMOT <br /> ® 22x18 SUPPLY AIR DUCT FROM RTU-2 ON <br /> ROOF. <br /> NOTE: O5 22x18 RETURN AIR DUCT FROM RTU-2 DESK ONq� <br /> HOOD MAKEUP AIR VIA HVAC SYSTEM. ON ROOF. O s" <br /> PER SHEET MO.1 MIN. VENTILATION RATE Z G% <br /> OF 650 CFM OF OUTSIDE AIR SHALL BE © TYPE 2 U.L. LISTED HOOD. Z <br /> BROUGHT INTO THE SPACE w o. M-28712 m <br /> TYPE-2 HOOD VELOCITY CALC <br /> CONTINUOUSLY 24/7. O7 14"0 EXHAUST DUCT UP TO KEF-1 ON ROOF. � <br /> 650 CFM / 14"0 (1.069 SQ FT)=608 FPM. ® PROGRAMMABLE MASTER THERMOSTAT, 48" AFF. CH \C, <br /> Og THERMOSTAT REMOTE SENSOR, 48" AFF. Seal OF C \F <br /> 03-22-18 <br /> g 1 p MANUAL VOLUME DAMPER. I- <br /> 14 1 1 10"0 EXHAUST RISER AIR DUCT UP TO ROOF JACK <br /> 14"0 & CAP W/BIRDSCREEN � <br /> 1 7 14"0 r) 12"0 SD-2 16"0 12 12"0 EXHAUST AIR DUCT UP TO EF-2 ON ®® ® a <br /> ® A— <br /> ® = = <br /> 250CFM ROOF. = <br /> 3 1 II 5 13 CABLE DAMPER-ADJUST THRU FACE OF DIFFUSER, ®_ <br /> 250CF OOCF�M II16"oI ANEMOSTAT VD-C OR EQUAL (TYPICAL IN SOLID CEILING <br /> Ti I - I I I 4 AREAS AND RIGID DUCT TO DIFFUSER CONNECTIONS) <br /> SD-2 �610 LI 1 Ii I I ' g g II 14 MAINTAIN CLEARANCES TO COMBUSTIBLE <br /> 70CFM �O I I CONSTRUCTION PER CMC 506.7 & 507.2. <br /> TG-1 TG-1 8„� AP VENT 1 <br /> 20"0 Ii I S 1 I II 1 3'R CLEARANCE' OINERAL COMBUSOTIOBLESAINTAIN _ <br /> iv 70CFM70CFM - 14 <br /> » <br /> oil <br /> I Ii I - 15 AIR CURTAIN, SEE MOA FOR SPEC. <br /> , <br /> OO <br /> G 1 _ <br /> (2)3"0 PVC UP TO = - - 891 <br /> /1 ' 1600CFM SlY=2 <br /> ROOF WITH i _ 250CFM I I I 16 THERMOSTAT TO ENERGIZE EF-2, SET FAN TO <br /> '10TERMINATION KIT � � � II ENERGIZE AT 77°F. <br /> WH O <br /> (WHERE GAS SERVICE / T I I <br /> 250CJ G-1 <br /> 2500 O <br /> FM I I <br /> IS AVAILABLE) I I II <br /> RG-1 <br /> 300CFMr / 16 <br /> 14x 14 / L20»0 Q <br /> VD /-� —18"0i I 10 I I <br /> 13 II cn <br /> TA I 1 10 G � I � I � O I OSD-3 � � II o <br /> 350CFM I I 5001 FM II w o <br /> 2 4X1 n <br /> 6i0CFM R <br /> IIII � <br /> O - O 12"0 DN <br /> C»o � 20F I W/VD <br /> VD14x14 <br /> 24X12 12"0 12"0 zo <br /> M <br /> 650CFM --8110 I 12"0 <br /> II I I SD-3 SD-3 I I II <br /> Q <br /> 400CFM 500CFM I II F- <br /> 0 <br /> 0 <br /> I I � I � I I I I �° <br /> LU <br /> �-4 I <br /> I I O O I �l , 0 O I I <br /> II o <br /> CD <br /> I I I II CD <br /> I <br /> SD-1 <br /> SD-1 1 15CFM 1 200 <br /> 0 <br /> 100CFM O � � ,20 � aaaaaaaa <br /> O <br /> --- ----r- <br /> 1 SD-3 SD-3 <br /> 10"o 0" 12"0 I 400CFM 500CFM I 13 0 <br /> � ACN II <br /> 13 � II ,I � ,I II I SD-3 /0-) I I <br /> 1 "` U O O LJ O 500CFM <br /> CF SD OO =__ <br /> 10 M I SD-3 15 I 12"0 D Q <br /> "0 8'0 350CFMI O O I W/VD I I 0 <br /> � 0 I 1 13 0 <br /> II 0 � <br /> ® 0 ___ ___ o z <br /> EF EF I --------------- I II W W co <br /> ElDD OQ � <br /> —� \ <br /> p Q <br /> Q � a U <br /> m Q <br /> NOTE: <br /> NOTE: ALL DUCT OPENINGS AND AIR W (n U <br /> DISTRIBUTION COMPONENTS SHALL 0 W W W <br /> CONTRACTOR SHALL PROVIDE PERFORMANCE TEST CERTIFICATE TO OWNER BE PROTECTED DURING CONSTRUCTION \ r^ f <br /> BEFORE FINAL APPROVAL. TEST SHALL VERIFY PROPER OPERATION, RATE OF PER CGBC 5.504.3 AND LOCAL v VJ z <br /> EXHAUST FAN, MAKEUP AIR, CAPTURE AND CONTAINMENT PERFORMANCE OF THE JURISDICTIONAL REQUIREMENTS. LL U Q <br /> EXHAUST HOOD SYSTEM AT NORMAL OPERATING CONDITIONS. MECHANICAL O Q <br /> CONTRACTOR SHALL PERFORM AND COMPLETE TEST. z <br /> U < <br /> U) <br /> 01 FLOOR PLAN - HVAC <br /> SCALE: 1/4"=l'-O" <br /> Project Number <br /> SPA16002.0 <br /> Sheet Name <br /> MECHANICAL <br /> FLOOR PLAN <br /> Sheet Number <br /> M2ml <br /> MARKM .\-PEDRO+MCCRACKEN\-BP ARCO C-STORES &GAS STATIONS\424-969 BP ARCO MANTECA, CA\DWG\3000 M2.1.DWG 03-01-2018 10:24 <br />