|
ip
<br /> ROBISON
<br /> ENGINEERING, INC
<br /> 19401 40TH AVE W.,SUITE 302
<br /> LYNNWOOD,WA 98036
<br /> 2063643343 TEL
<br /> CONTACT:TYLER BEAM
<br /> QROFESS/pN
<br /> ER B�l
<br /> � z
<br /> Z3 No. E-21545 m
<br /> xi•
<br /> F OF CA�IF�
<br /> Seal
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> MINIMUM SOLAR ZONE AREA WORKSHEET MINIMUM SOLAR ZONE AREA WORKSHEET MINIMUM SOLAR ZONE AREA WORKSHEET bp
<br /> CEG-NRC1C-SRA-02-E(Revised 04116) CALIFORNIA ENERGY COMMISSION GEC-NRCC-SRA-02-E (Revised 04116) CALIFORNIA ENERGY COMMISSION CEC-NRCC-SRA-02-E(Revised 04116) CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE N RC C-S RA-02-E CERTIFICATE OF COMPLIANCE NRCC-SRA-02-E CERTIFICATE OF COMPLIANCE NRCC-SRA-02-E
<br /> Minimum Solar Zone Area Worksheet Page 1 of 3 Minimum Solar Zone Area Worksheet Page 2 of 3 Minimum Solar Zone Area Worksheet Page 3 of 3
<br /> Projeet Name: ARCO Manteca, CA Date Prepared: 3/8/18 Project Name: ARCO Manteca,CA Date Prepared: 3/8/18
<br /> Project Name: ARCO Manteca, CA Date Prepared: 3#8/18
<br /> Solar Zane Area(requirements in§110.10(b)113) Step 2: Allocated Solar Zone Subareas DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br /> This worksheet applies to hotel/motel occupancies and high-rise multifamily buildings with ten stories or fewer,and all other nonresidential buildings with three If Steep Plane Subarea is 1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
<br /> stories or fewer that comply with the solar zone requirement through Compliance Path A: Allocated Solar Zane in the NRCC-SRA-01-F Certificate of Compliance Solar Subarea Doc umentatlon Author Name: Doc umentatlon Author Signature:
<br /> Read Areas. Slope, roof or Subarea containing located the Smallest J. Tyler Beam
<br /> Ready Building Shope of meet
<br /> The worksheet applies to all additions that increase the roof area b more than 2,000 H. Subarea Overhang complies the solar appropriate dimension Subarea Area company: signature Date:
<br /> pp y Plan Roof or minim4,€rrl Robison Engineering Inc. 3/8/18
<br /> Ili oriented with Part 9 zone is free distance is greater CZualifiesE {ft'}
<br /> Reference Overhang area Address; CEA/HERS Certification identification(if applicable):
<br /> between 110° of Title 24A of from than 5 feet 1940140th Ave W. Suite#302
<br /> A. General Information � $ c requirement°
<br /> and 270 ObstructlOnS obstructions C1tyf5tate/Zip: L nnwood WA 98036 Phone: 206 ���-3343
<br /> Project Address: y r
<br /> H I J K L M N a P 4 R
<br /> Total Roof Area: Less than or equal to 10,000 ft' Phase of Construction: °❑ New Constructlon RESPONSIBLE PERSON'S DECLARATION STATEMENT
<br /> F7Greate r than 10,000 ft' F1Addition that increases roof area by more than 2,000 ft' Canopy E.0.9.1 LOW NA Yes Yes Yes Yes 'Yes Yes 2,460 I certify the following under penalty of perjury, under the laws of the State of California:
<br /> Add Raw Remove Last 1. The informat!on provided on this Certificate of Compliance is true and correct.
<br /> 2. 1 am eligible under Division 3 of the Business and Professions Cade to accept responsibility for the building design or system design Q
<br /> Step 1: Determine Minimum Solar Zone AreaProposed Solar Zone Area (ftZ) (sum of all qualifying subareas)[S] 2,460 identified on this Certificate of Compliance (responsible designer).
<br /> Calculate the minimum solar zone area using one of the two options provided below. Use option 2 if your roofs and overhangs are shaded. A. The solar Zone shall comply with access, pathway, smoke ventilation, and spacing requirements as specified In Title 24, Part 3 or other 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system m
<br /> Method 1:Minimum Solar Zone Area Based on Total Roof Area(requirements in 110,10fb)16J Parts of Title 24 or in any requirements adopted by a local jurisdiction. design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of U)New Construction:Total roof area (ftp) B. No obstructions, including but not limited to, vents, chimneys, architectural features, and roof mounted equipment, shall be locoted in Regulations. z U)
<br /> A 16,085 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information p a-
<br /> Addit[on s:Total roof area added to building(ftp) the solar zone. —„ w
<br /> z C. Solar zone must be located no closer than twice the distance, measured in the horizontal plane, of the height difference between the provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement w o
<br /> New Construction:Area of roof covered with skylights(ft ) agency for approval with this building permit application. CD
<br /> Additions:Area of new roof area covered with skylights(ft') B highest obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the z
<br /> D. If the building roof area r 10,004 ftz there minimum area is SO ft2. if building roof area> 10,000 ft2 then minimum area is 160 ft2. buildln and made available to the enforcement agency far all a livable inspections. I understand that a corn leted signed ca of this �
<br /> Minimum solar zone area C=0.15 x (A—8) 2,412.75 ,� „ . �, �, gr g Y pp p P copy E. Check yes if answers to questions in columns K through P are yes . Certificate of Compl lance is required to be included with the documentation the builder provides to the building owner at occupancy. m
<br /> Note:For additions,if A-2,000 ftz then addition does not need to comply with solar zone requirements
<br /> Responsl6le Designer Name: Responsl6le Designer Signature: J
<br /> J. Tyler Beam Q
<br /> Method 2:Minimum Solar Zone Area Based on Potential Solar Zone(requirements in Exception 3to110.10(b)18J Building complies with Minimum Solar Zone Area requirement is Proposed Solar Zone Area [S] is equal �
<br /> COMPLIES Company: Date Signed: —
<br /> The enforcement agency may require additional documentation that describes how the reduced solar zone area was determined. t0 or greater than the Minimum Solar Zone Area [G] Robison Engineering Inc. 3/8f 18 z
<br /> Address: License:
<br /> Method/Tool(s) used to quantify annual solar access:(for example, "Software X", 1940140th Ave W. Suite#302 E-21545 w
<br /> "G40 Tool Y") I I C4
<br /> City/state/Zip: Phone:
<br /> Lynnwood INA 98036 (206} 364-3343 0 C-4W Area of low-sloped roof(ratio of rise to run of 2:12 or less)where the annual solar 0 o
<br /> access is 70%or greater.* (ftp)
<br /> <
<br /> Area of steep-sloped roof(ratio of rise to run is greater than 2:12)that is oriented Q a a a a a a a
<br /> vbetween 110° and 270°and annual solar access is 70%or greater.*(ftp) E
<br /> a Minimum solar zone area F=0.5 x(0+ E) 0
<br /> 00 * For new construction consider total roof area;for additions consider newly added roof area
<br /> 00 Minimum solar zone area{either C or F)(ftp) G 2,412.75
<br /> O
<br /> M Q
<br /> 3 Q W
<br /> O �
<br /> ir N Z /^
<br /> N ® W Cy)
<br /> LLJ I
<br /> ® O Q o
<br /> N ® 0)
<br /> Q
<br /> F Q Q 00 0
<br /> 0
<br /> W J
<br /> OL1 F-- >� Q
<br /> w
<br /> M 0 L: WU' w
<br /> 3 LU
<br /> Z
<br /> U
<br /> U
<br /> Q O0
<br /> Z
<br /> Q
<br /> O Wrn
<br /> U - VJ
<br /> a CA Building Energy Efficiency Standards- 2016 Nonresidential Compliance April 2016 CA Building Energy Efficiency Standards- 2016 Nonresidential Compliance April 2:016 CA Building Energy Efficiency Standards- 2016 Nonresidential Corn pllance April 2016
<br /> a
<br /> M
<br /> rn
<br /> co
<br /> rn
<br /> 4
<br /> (n
<br /> Z
<br /> O
<br /> Project Number
<br /> rn
<br /> N SPA16002.0
<br /> a
<br /> to
<br /> c�
<br /> W Sheet Name
<br /> ir
<br /> TITLE 24 FORMS
<br /> (n
<br /> U
<br /> o SOLAR FORMS
<br /> U
<br /> Q
<br /> a-
<br /> Z
<br /> W
<br /> Y
<br /> U
<br /> a
<br /> U
<br /> Sheet Number
<br /> U
<br /> O
<br /> W
<br /> EOm9
<br /> L�
<br />
|