|
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Electrical Power Distribution Electrical Power Distribution f Electrical Power Distribution
<br /> CEC-NRCC-ELC-01-E(Revised 01!16) CALIFORNIA ENERGY COMMISSION CEC NRCC ELC Q1 E(Revised 01118) CALIFORNIA ENERGY COMMISSION E CEG-NRCC-ELC-01-E(Revised 01116) CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
<br /> Electrical Power Distribution Page 1 of 5 Electrical Power Distribution Page 2 of 5 Electrical Power Distribution Page 3 of 5
<br /> Pmject Name: Date Prepared' Pmject Name: Date Prepared' Pmject Name: Date Prepared'
<br /> ARCO Manteca, CA 2/�S/18 ARCO Manteca,CA 2/28/18 ARCO Manteca,CA 2/28/18
<br /> General Information B. Separation of Electrical Circuits for Electrical Energy Monitoring ROBISON
<br /> Project Address: Climate zone: Conditioned Floor Area: Panels A,B,C,G,CW 283 ❑✓ ❑✓ Q✓ ❑ ❑ Check all boxes below if the electrical power distribution system is in compliance with section 130.5(6). ENGINEERING, INC
<br /> 3,180 The electrical power distribution system meets the separation of electrical circuits for electrical energy monitoring requirement of Section 19401 40TH AVE W.,SUITE 302
<br /> Sec of West Lathrop Rd.&Crestwood,Ave. 12 Unconditioned Floor Area : LYNNWOOD,WA 98036
<br /> Panel L 16.2 0 0 0 0 ❑ ❑ ❑ 130.5(b).The electrical power distribution systems is designed so that measurement devices can monitor the electrical energy usage of load types 206-364-3343 TEL
<br /> according to TABLE 130.5-B.
<br /> Building Type: 0 Nonresidential F] High-RiseResidential F] Hotel/MDtei CONTACT:TYLER BEAM
<br /> ❑ Describe the electrical power distribution system instal led and the compliance method chosen in meeting the requirement of Section 130.5(b).Use
<br /> ❑ Schools ❑ Reiocatable Public Schools ❑ Conditioned Spaces ❑ Unconditioned Spaces RTU-1 19.9 ❑✓ ❑ ❑✓ ❑ ❑ the space belowto include the information.Examples of compliance methods are detailed in Nonresidential Compliance Manual Chapter 8.
<br /> Phase of Construction: Fill out Column 1 thru 3 with the compliance information.
<br /> ❑ New Construction ❑ Addition ❑ Alteration QROFESS/QN
<br /> RTU-2 19.9 ❑ ❑✓ 0 ❑ ❑ ❑ General Information Electrical Power Distribution System information Electrical Service Enforcement �O ` LER B�l
<br /> and Method of compliance Rating Agency
<br /> In the table below identify all applicable construction documents that specify the requirements for the scope of responsibility reported D1 D2 Q3 04
<br /> by this certificate. Use additional pages as needed to list all construction documents related to compliance of Section 130.5. Add Row Remove Last w N0. E-21545 m
<br /> Electrical Service Describe the electrical power distribution system kVA Check that the
<br /> Document Title/Descriptions Indicate which subsection of Designation/Location/Description installed and the compliance method used systern complies
<br /> {include description information for Document Sheet or Section 130.5 is related to the MSB EXTERIOR 1200A METERED UTILITY METER 339 �, Q
<br /> Document Number SWITCHBOARD T F�ECTR\OP ��
<br /> Table or Schedule if it contains Page# document{e.g. 130.5(a)for 9p FL
<br /> compliance information} service electrical metering} F S'ZZ'l$
<br /> PANELS A,B, C,G,CW BRANCH MONITORING PANELS Seal OF CAL\F�
<br /> 1 One-Line Diagram 0.3.1 130.5(a) PANEL L,RTU-1, RTU-2 CT METERING WITH DISPLAY,HISTORY LOGGING
<br /> 2 Panel Schedules E0.3.2 130.5(a)&(b) bp
<br /> 3 Voltage Drop,Arc Flash&Fault Current E5.2 130.5(c)
<br /> Schedules
<br /> 4 Controlled Receptacles E2.0 Handbook-8.5
<br /> Add Row Remove Last
<br /> A.Service Electrical Metering
<br /> Check one of the three,boxes below if the electrical power distribution system is in compliance with Section 130.5(a).
<br /> For newly installed electrical service in newly Constructed buildings,Service Electrical Metering is required according to Section 130.5(a).Mlout
<br /> Column I through 6 of table below.
<br /> ❑ For new or replacement electrical service equipment in existing buildings,Service Electrical Metering Is required according to Section 141.0(b)2Pi.
<br /> Fill out Column 1 through 6 of table below.
<br /> ❑ EXCEPTION to Electrical Service Metering:Service or feeder for which the utility company provides a metering system that indicates instantaneous
<br /> kW demand and kWh for a utility-defined period.Fill out Column I,2 and 6 of table below with the compliance information.
<br /> Fill aut a separate line for each electrical service that is connected to the building. Field Inspector Notes:
<br /> Electrical Service Schedule Electrical Metering Capabilities(check all that are present) Exception to Field Inspector
<br /> Service Rating 130.5(a)
<br /> 01 02 03 04 05 06 07 08 J
<br /> Q
<br /> I—
<br /> Tracking kWh m
<br /> Electrical Service Designation/ kVA (at the time)Instantaneous Historical for auser- kWh per Utility metering Check that the metering
<br /> LocationfDescr€ption Cn
<br /> kW peak(kW) definable rate period system complies period p Z ~
<br /> 0 a-
<br /> Z75 w
<br /> > o
<br /> LU
<br /> Q:f CD
<br /> MSB 339 ❑ ❑ ❑ ❑ ❑✓ ❑
<br /> J_
<br /> m
<br /> J
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 Q
<br /> Z
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA 00
<br /> Electrical Power Distribution Electrical Power Distribution w N
<br /> CEC-NRCC-ELC-01-E(ReviviCALIFORNIAsed 01116] CALIFORNIA ENERGY COMMISSION CEC-NRCC-ELC-01-E(Resed 01116] CALIFORNENERGY COMMISSION p C-�
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CD
<br /> sT3 Electrical Power Distribution Page 4 of 5 Electrical Power Distribution Page 5 of 5
<br /> s Project Name: Date Prepared: Pmject Name: Date Prepared: Q a a a a a a a
<br /> ARCO Manteca, CA 2/28/18 ARCO Manteca,CA 2/28/18 �
<br /> O
<br /> U
<br /> 2 C.Voltage Drop DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br /> a Enforcement Agency
<br /> M Check all boxes below if he electrical power distribution system is in compliance with Section 130.5(c). Check that the system 1. I certify that this Certificate of Compliance documentation is accurate and complete.
<br /> Complies Documentation Author Name'JTyler Beare Documentation Author Signature:
<br /> .
<br /> Company: signature Date:
<br /> o Q The electrical power distribution system meetsthe voltage drop requirement of Section 130.5(c).The Robison Engineering Inc. 2128118
<br /> N maximum combined voltage drop on feeder conductors and branch circuit conductors to the farthest
<br /> \ connected load or outlet,do not exceed 5%. ❑ Address:19401 40th Ave W. Suite#302 CW HERS Certification Identification(if applicable):
<br /> M eltylstatelziptynnwood, WA 98036 Phone:(206)364-3343 0
<br /> o ❑ Voltage drop calculation documents showing compliance to Section 130.5(c)are submitted as part of the RESPONSIBLE PERSON'S DECLARATION STATEMENT W
<br /> compliance document submittal. ® O
<br /> ❑ I certify the following under penalty of perjury,under the laws of the State of California: cr z
<br /> O 1. The information provided on this Certificate of Compliance is true and correct. W
<br /> 0-2 . 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified >
<br /> an this Certificate of Compliance(responsible designer). O Q LO
<br /> N D.Circuit Controls for 1Z0-Volt Receptacles and Controlled Receptacles 3. The energy features and performance specifications, materials,components,and manufactured devices for the building design or system CE 0)
<br /> w = 0
<br /> Field Inspector design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
<br /> FCheck one or more boxes below for applicable requirements of Section 130.5(d)Ifor the electrical power Check that the system Regulations. O Q
<br /> O distribution system. complies Q O U
<br /> 0 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
<br /> W ❑ The control is capable of automatically shutting OFF the controlled receptacles when the space is typically provided on other applicable compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement J
<br /> o unoccupied,either at the receptacle or circuit level. For the automatic time switch control,it incorporates an agency for approval with this building permit application. UJ
<br /> joverride control that allows the controlled receptacle to remain ON for no more than 2 hours when an 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued far the (n U U
<br /> 3 override is initiated and an automatic holiday"shut-OFf"feature that turns OFF all loads for at least 24 hours 1:1Building,and made available to the enforcement agency for all applicable Inspections.I understand that a completed signed copy of this W W W
<br /> %
<br /> and then resumes the normally scheduled operation.Countdown timer switches are not be used to comply
<br /> Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. z
<br /> Q ResponsibleDesigner Nam e: ResponsibleDesign erSign ature: r 1 z
<br /> U with the automatic time switch control requirements.The controls meet the requirement of Section 130.5(d)1. J. Tyler Beam LLV
<br /> Q Company: ned:Date Sig
<br /> Robison Engineering Inc. 2128118 O 0
<br /> 0 There is at least one controlled receptacle within 6 ft from each uncontrolled receptacle.Where receptacles
<br /> Z z
<br /> Address: Llcense ' `
<br /> are installed in modular furniture in open office area,at{east one controlled receptacle is Installed at each Address:
<br /> 40th Ave W. Suite#302 E-21545 V
<br /> workstation.The receptacles meet the requirement of Section 130.5(d)2. cltyfstaterzip:LynnwOOd, WA 9$036 Phone.�206) 364-3343 W
<br /> O r^
<br /> U VJ
<br /> arvi There are installed split wired receptacles with at least one controlled and one uncontrolled receptacle.
<br /> M Where receptacles are installed In modular furniture in open office area,at least one controlled receptacle is ❑
<br /> rn installed at each workstation.The receptacles meetthe requirement of Section 130.5(d)2.
<br /> co
<br /> rn
<br /> I 0 Permanent and durable marking for controlled receptacles or circuits to differentiate there from uncontrolled ❑
<br /> cli receptacles or circuits is provided.The markings meetthe requirement of Section 130.5(d)3.
<br /> 0 ❑ Far hotel and motel guest rooms,there are controlled receptacles for at least one-half of the 120-volt
<br /> F receptacles in each guest room.Electric circuits serving controlled receptacles in guestroams are installed to
<br /> ❑ Project Number
<br /> 9 have captive key controls,occupancy sensing controls, or automatic controls so the power is switched off no
<br /> N longer than 30 minutes after the guest room has been vacated.The receptacles meet the requirement of SPA 1 6002.0
<br /> CD Section 130.5(d)4.
<br /> ed0 Receptacles that are only for the following purposes are excepted from Section 130.5(d): Sheet Name
<br /> W -Receptacles specifically for refrigerators and water dispensers in kitchen areas.
<br /> -Receptacles located a minimum of six ft above the floor that are specifically for clocks.
<br /> N
<br /> U -Receptacles for network copiers,fax machines,A/V and data equipment other than personal computers in ❑ TITLE 24 FORMS
<br /> O copy rooms.
<br /> -Receptacles on circuits rated more than 20 amperes. POWER FORM S
<br /> Q
<br /> 0- -Receptacles connected to an uninterruptible power supply(UPS)that are intended to be in continuous
<br /> use,24 hours per day/365 days per year,and are marked to differentiate them from other uncontrolled
<br /> Zreceptacles or circuits.
<br /> W
<br /> Y
<br /> U
<br /> Q
<br /> QSheet Number
<br /> U
<br /> o CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016
<br /> EOml
<br /> i�
<br />
|