Laserfiche WebLink
IrN ETL- 7 <br /> 2A� <br /> Architecture / Developmen <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Electrical Power Distribution Electrical Power Distribution Electrical Power Distribution 14901 Quorum Drive <br /> NRCC-ELC-E(Created 5/18) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 5/18) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 5/18) CALIFORNIA ENERGY COMMISSION Suite 300 <br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E Dallas Texas 75254 <br /> This document is used to demonstrate compliance with mandatory requirements in 6130.5 for electrical systems in newly constructed nonresidential,high-rise residential and Project Name: In-N-Out Burger lReport Page: Page 2 of 5 Project Name: In-N-Out Burger Report Page: Page 3 of 5 <br /> hotellmotel occupancies. Additions and alterations to electrical service systems in these occupancies will also use this document to demonstrate compliance per§141.OLa)or Project Address: SEQ of River Island Pkwy&Golden Valley PkwY jDate Prepared: 10/16/2018 Proiect Address: SEQ of River Island Pkwy&Golden Valley Pkwy Date Prepared: 10/16/2018 Ph: (972)239-8884 <br /> §141.0�WPfior alterations. Fax: (972)239-5054 <br /> Project Name: In-N-Out Burger IReport Page: Page 1 of 5 D.EXCEPTIONAL CONDITIONS 01 02 03 04 05 <br /> Project Address: SEQ of River Island Pkwy&Golden Valley Pkwy IDate Prepared: 10/16/20181 This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout theform. Location of ISSUE RECORD <br /> A.GENERAL INFORMATION No exceptional conditions apply to this project. Load Type per Table 130.5-13' Minimum Required Separation of Compliance Method' Requirements in Construction Field Inspector DATE DESCRIPTION <br /> 01 JProject Location(city) I Lathrop 102 loccupancy Types Within Project: Load per Table 130.5-B Documents Pass Fail URBAN PROTOTYPE DESIGN <br /> F,-/] Office Retail 0 warehouse Hotel/Motel School 7/1 Support Areas E.ADDITIONAL REMARKS 10-22-2018 ISSUED FOR PERMIT <br /> Parking Garage High-Rise Residential D Relocatable Other(Write In): This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. Domestic and service water systems All loads in aggregate Method 1 E2.1 <br /> All plug load separated by floor, <br /> B.PROJECT SCOPE type or area Groups of plug loads <br /> Table Instructions:Include any electrical service systems that are within the scope of the permit application. Plug Loads and appliances<25kVA exceeding 25 kVA connected load Method 1 E2.1 E] El <br /> 01 02 03 04 05 F.SERVICE ELECTRICAL METERING in an area less than 5000 sf <br /> Table Instructions:Complete the table belowfor new or replacement electrical service systems OR equipment to demonstrate compliance with§13Q.5La <br /> Demand Response Controls Other non-HVAC loads or appliances�25W, All loads in aggregate Method 1 E2.1 11 E:1 <br /> Where required,demand response controls must be specified <br /> Electrical Utility Provided 01 02 03 04 05 NOTES:If"Other"is selected under Compliance Method above,please indicate how compliance has been achieved'in the space provided below. <br /> Service Rating Metering System which are capable of receiving and automatically responding to Required Metering Capabilities per Table 130.5-A <br /> Designation/ Scope of Work' (kVA) Exception to at least one standards based messaging protocol which Field Inspector <br /> Description §130.51a) e.nables demand response after receiving a demand response Electrical Service Rating Instantaneous Historical Peak Tracking kWh for kWh per rate Location of Requirements in FOOTNOTES.For each separate load type,up to 105166 of the connected load may be of any type. <br /> signal. Sections§120.2 §130.1 and§130.3 and compliance Designation/Description (kVA) user-defined Construction Documents 'Method 1:Switchboardsl motor control centersl panelboard loads disaggregatedfor each loadtype <br /> documents NRCC-MCH,NRCC-LTI and NRCC-LTS will indicate Demand(kW) Demand IlkW) period period Pass Fail Method 2:Switchboardsl motor control centers1panelboard supply other distribution equipment with loads disaggregatedfor each load type <br /> FL��I MSB New electrical service equipment&meter 371 when demand response controls are required. Panel MSB 371 z 21 1:1 E2.1 Method 3:Complete metering system measures and reports loads by type <br /> See Chapter 8 of the Nonresidential Compliance Manua for more detail on Compliance Methods. REVISION RECORD <br /> 'FOOTNOTES.Adding only newfeeders and branch circuits triggers Voltage Drop 130.5(c),no other requirements from 130.5 are required. G.SEPARATION OF ELECTRICAL CIRCUITS FOR ENERGY MONITORING <br /> 'Applicable if the utility company is providing a metering system that indicates instantaneous kW demand and kWhfor a utility-defined period Table Instructions: Complete this table for entirely new or complete replacement electrical power distribution systems to demonstrate compliance with§130.5(b) Usingthe H.VOLTAGE DROP <br /> dropdown choices in column 01,indicate the load types includedfor each service. Any load types that are not included in the service do not need to be shown. Table Instructions: Please complete this table for entirely new or complete replacement electrical power distribution systems,or alterations that add,modify or replace both <br /> C.COMPLIANCE RESULTS Electrical Service Designation/Description: Panel MSS feeders and branch circuits to demonstrate compliance with§130.5 Uc, For alterations,only the altered circuits must demonstrate compliance per§141.0i(b)2 <br /> Table Instructions:If this table says"DOES NOT COMPLY"refer to Table D.for guidance and review the Table that indicates"No 01 02 03 04 05 01 02 03 04 05 <br /> 01- 02 03 04 05 Electrical Service Combined Voltage Drop on Installed Feeder/Branch Location of Voltage Drop Sheet Number for Voltage Drop Field Inspector <br /> Service Electrical Separation for Controlled Minimum Required Separation of Location of Field Inspector Designation/Description Circuit Conductors Compliance Method Calculations' Calculations in Construction <br /> Metering AND Monitoring AND Voltage Drop AND Receptacles Load Type per Table 130.5-13' Load per Table 130.5-B Compliance Method' Requirements in Construction Documents Pass Fail <br /> §130.5(c) Compliance Results Documents Permitted by CA Elec <br /> §130.5(a) §130.5(b) §130.5(d) Pass Fail Panel MSB Zvoltage drop<5% DCocle(Exception to In construction documents E2.1 <br /> (See Table F) (See Table G) (See Table H) (See Table 1) Lighting including exit,egress and exterior All lighting disaggregated by floor, Method 1 E2.1 El §130.5(c))* I <br /> Yes AND Yes AND Yes AND Yes COMPLIES type or area *NOTES If"Permitted by CA Elec Code"is selected under Compliance Method above,please indicate where the exception applies in the space provided below. <br /> HVAC systems and components All HVAC in aggregate and each Method 1 E2.1 'FOOTNOTES:Voltage drop calculations may be attached to the permit application outside the construction documents if allowed by the Authority Having Jurisdiction. Select <br /> HVAC load rated at least 50 kVA "attached"if applicable. If calculations will be the responsibility of the installing contractor,select"Contractor Responsible". <br /> Table Continued <br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards May 2018 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards May 2018 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards May 2018 <br /> PR L <br /> 01 <br /> E 17044 <br /> "'C a <br /> If <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA C C <br /> Electrical Power Distribution Electrical Power Distribution <br /> NRCC-ELC-E(Created 5/18) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 5/18) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E <br /> Project Name: In-N-Out Burger IReport Page: Page 4 of 5 Project Name: In-N-Out Burger Report Page: Page 5 of 5 <br /> Project Address: SEQ of River Island Pkwy&Golden Valley Pkwy IDate Prepared: 10/16/2018 Project Address: SEQ of River Island Pkwy&Golden Valley PkwY Date Prepared: 10116/2018 <br /> 1.CIRCUIT CONTROLS FOR 120-VOLT RECEPTACLES AND CONTROLLED RECEPTACLES id DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br /> Table Instructions:Please complete this table for entirely new or complete replacement electrical power distribution systems to demonstrate compliance with§130.5(d) Both Documentation Author Name: Alex Garcia Documentation Author Signature: <br /> controlled and uncontrolled receptacles must be provided in office areas,lobbies,conference rooms,kitchen areas in office spaces,copy rooms and hotellmotel guest rooms. Company: Wade Energy SignatureDate: 10/16/2018 t m <br /> 01 02 03 04 05 06 <br /> Permanent Location of Requirements Field Inspector Address: 1942 Linda Dr. CEA/HERS Certification Identification(if applicable): <br /> Electrical Service Location/Type of Controlled Shut-Off Controls Durable in Construction City/State/Zip: Pleasant Hill,CA 94523 Phone: (925)326-6330 <br /> Designation/Description Receptacles Marking Will Documents Pass Fail RESPONSIBLE PERSON'S DECLARATION STATEMENT engineering consultants <br /> be Used I - I certify the following under penalty of perjury,under the laws of the State of California: 14901 Quorum Dr. #565 Dallas, TX 75254 <br /> Panel MSB Within 6ftof uncontrolled receptacles Auto Time-Switch w/applicable override 71 E2.1 171 D 1.The information provided on this Certificate of Compliance is true and correct. rtmassociates.com 1 972.387.3500 <br /> I Remove Last 2.1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of <br /> If"Other`is selected under Compliance Method above,please indicate how compliance has been achieved in the space provided below. Compliance(responsible designer) 18.GHAA.033 <br /> 3.The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this <br /> J.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION Certificate of Compliance conform to the requirements of Title 24,Part I and Part 6 of the California Code of Regulations. <br /> Table Instructions:Selections have been made based on information provided in previous tables of this document.if any selection needs to be changed,please explain why in 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable PROTOTYPE VERSION <br /> Table E.Additional Remarks.These documents must be provided to the building inspector during construction and can be found online at http compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application. URBAN DESIGN <br /> ovl2Ol5publicationsICEC-400-2015-0331opijendices ormsINRCI <br /> www.eneray.ca.q JL___- S.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available <br /> YES NO Form/Title Field Inspector to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the PR JE T NAME <br /> Pass Fail documentation the builder provides to the building owner at occupancy. <br /> NRCI-ELC-01-E-Must be submitted for all buildings. El EF-11 Responsible Designer Name: John Gholmieh Responsible Designer Signature: <br /> Company: RTM Engineering Consultanting Date Signed: IN-N-OUT <br /> 1K.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Address: 14901 Quorum Drive,#565 License: E17044 <br /> IThere are no Certificates of Acceptance applicable to electrical power distribution requirements. City/State/Zip: Dallas,Texas 75254 Phone: (972)387-3500 BURGER <br /> LATHROP <br /> CALIFORNIA <br /> 16514 GOLDEN VALLEY PKWY <br /> LATHROP, CA 95330 <br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards May 2018 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards May 2018 <br /> INNIIIIIOUT <br /> IkOURGER@ <br /> GOD BLESS AMERICA <br /> PROJECT NUMBER <br /> 180641.001 <br /> SHEET TITLE <br /> TITLE n4 <br /> E COMPLIANCE <br /> CN FORMS <br /> C=> <br /> 06 SHEET NUMBER <br /> CD C�) <br /> To4= 5 <br /> 0:� Ckf <br /> 0__ C2.- <br />