My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2004-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2900 - Site Mitigation Program
>
PR0505553
>
SITE INFORMATION AND CORRESPONDENCE_2004-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 2:16:35 PM
Creation date
8/13/2020 12:19:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2004-2019
RECORD_ID
PR0505553
PE
2960
FACILITY_ID
FA0006856
FACILITY_NAME
FRANKS FOOD MART
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
94336
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g� 1 <br /> Manteca is waiting for the area to be developed, and as a condition of that development, the City <br /> of Manteca will require the line to be connected by the developers from the Crom and Airport <br /> Street intersection to the line ending at 100 feet from the north of Yosemite on Airport, thereby <br /> connecting the entire area of concern to public water. Center Street is also on the agenda to be <br /> connected with North Airport, which will add additional public water in the area, completely <br /> engulfing the"plume" area as well. All of this can be verified by the General Plan and the City <br /> of Manteca. This information has been stated to your agency in past in previous letters and your <br /> agency is aware of it. Basically, the entire area involved herein in the "Plume" area is planned to <br /> be developed, and as a result of said future development, have city water available for the <br /> lots in the area to hook up to public water if they so choose to do so. Conclusively then, it is just <br /> a matter of time wherein the entire area is either now annexed into the city or will be annexed <br /> into the city and city water available. In fact, the corner of northwest Airport and Yosemite <br /> Avenues has already been annexed into the City of Manteca. To continue, as your agency has <br /> proposed, with new"plume" finding,drilling and monitoring additional wells, etc.,will not <br /> result in a long term solution to safe drinking water because the City of Manteca will have solved <br /> it (in all probability) in advance. You should realize that locally the City of Manteca is hurriedly <br /> being developed and the development is accelerated especially in that area. <br /> As time is of the essence to submit Mr. Guinta's submissions with the attachments, other <br /> documents and attachments will be forthcoming and be provided at the hearing. Mr. Guinta will <br /> state good cause to add additional information to your agency for consideration at the hearing. <br /> Mr. Guinta reserves the right to add additional information, testimony, objections, and as <br /> otherwise, for the protection of his rights so that due process is given to him which is his <br /> protected right. In that regard, Mr. Guinta asserts and claims the agencies entire file as <br /> supporting his contention that the current order(s)need to be modified to a realistic cost effective <br /> approach. That financial conditions of the parties, equities in the premises in question, cost of <br /> diminishing returns, and remedial approaches should be pragmatic based upon realities of <br /> both physics and of realistic financial abilities of the parties.. <br /> In summation of Mr. Guinta's written submissions, Mr. Guinta prays this learned and <br /> accomplished agency,that the present orders and conditions need to be modified as outlined <br /> and that an adopted path of consideration of rational cost expenditures based upon clearly <br /> defined balanced expected remedial results should be implemented in its stead, which will result <br /> in a finalization of the matter with all costs paid with further hardship to all parties hereto <br /> mitigated, including the state. <br /> For all of the above reasons I respectfully submit on behalf of Mr. Guinta all of the <br /> foregoing. <br /> Regarlls, <br /> Arthur L. Barnes <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.