Laserfiche WebLink
EAR Site Nominations <br /> FY 2013/14 - 2 - 7 December 2012 <br /> i. Any actions that have been previously taken to cleanup or abate the effects of the <br /> unauthorized release. <br /> j. A description of the necessary investigation/remediation work needed. <br /> k. The amount of annual funding requested and an estimated total required. <br /> I. A description of the results if funding should be denied. <br /> m. Those cases you select for inclusion to the EAR list must be placed in prioritized <br /> (highest to lowest) order. <br /> 3. One important change this year is — each case, existing and any new cases you <br /> want to have considered for the FY 2013/14 Annual List, MUST be evaluated using <br /> the State Board's Low Threat Closure Policy (LTCP). Further, for each case, <br /> existing and new, you MUST complete the Low Threat Closure Policy checklist <br /> (LTCP Checklist) found on Geotracker and submit it with any additional necessary <br /> supporting justification. Please be aware we have been informed if the case <br /> meets the LTCP, as reviewed by Cleanup Fund staff, the case may not be <br /> accepted on the FY 2013/14 EAR Annual List. <br /> Keeping in line with last years list we again intend to list both the local agency (LIA or LOP) and <br /> Region 5 jointly as the designated oversight agency in the form of"County/Regional Board", <br /> with the appropriate contact persons also listed on the table. This is being done for several <br /> purposes: 1) it allows our (County and Regional Board) agencies to work cooperatively together <br /> to assign/reassign a lead agency to oversee the EAR case, including all associated <br /> administrative and technical needs, based on our available individual agency resources, while <br /> maintaining account eligibility, 2) allow for those EAR cases that may have been received less <br /> attention previously to be re-activated, and 3) to ensure that those monies earmarked for our <br /> agencies are used effectively. <br /> As a result of the timeframes designated by the State Board and our Regional Board meetings <br /> schedule (a Regional Board adopted resolution is required for EAR list submittal to the State <br /> Board), we need the above requested information (see No. 1, 2 & 3 above) by absolutely no <br /> later than 15 February 2013. Please note, that failure to re-nominate and provide a brief <br /> updated site status, including the evaluation (No. 3 above) using the LTCP checklist found on <br /> Geotracker, for those cases within your individual jurisdictions currently on the 2012/13 EAR list <br /> by 15 February 2013 will result in those sites being removed from the 2013/14 EAR list. <br /> Should you have any questions regarding this matter, please contact Jim Munch, at (916) 464- <br /> 4618 or by e-mail at imunch(Qwaterboards.ca.gov or Camille Hang at (916) 464-4721 or by e- <br /> mail at chang6a�waterboards.ca.gov. <br /> Attachment (1) <br />