My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PARCO
>
296
>
1600 - Food Program
>
PR0546085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 8:27:14 AM
Creation date
8/13/2020 3:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546085
PE
1632
FACILITY_ID
FA0026059
FACILITY_NAME
JULIUS CORDES ELEMENTARY SCHOOL
STREET_NUMBER
296
Direction
E
STREET_NAME
PARCO
STREET_TYPE
AVE
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
01
SITE_LOCATION
296 E PARCO AVE
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N�tJ O A Q U I N Environmental Health Department <br /> —COUNTY— <br /> The <br /> COUNTYThe EHD must be kept informed of the construction progress. A final inspection must be performed, <br /> operating permit fees paid, and approval to operate granted prior to opening for business. All <br /> equipment must be installed and thorough cleaning completed prior to the final inspection. Inspections <br /> must be scheduled at least 48 hours in advance. Charges for additional inspections, re-inspections <br /> and/or consultations may be assessed at the EHD hourly rate of$152 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br /> applicable State laws, and/or city or county ordinance codes, shall be constructed or reconstructed <br /> upon request of the EHD. Inferior workmanship, equipment, or materials will not be accepted for the <br /> construction or operation of a food facility. Any variance from the requirements outlined in this letter <br /> will require written approval from the EHD. Approval of the submitted plans shall become null and void <br /> if the work authorized is not commenced within 180 days from the date of approval, or the work <br /> authorized by such plans is abandoned. In order to renew action on an expired plan approval, the <br /> applicant shall submit fees equal to that of a new plan review. A copy of the approved plans shall be <br /> available on site at the time of final inspection. <br /> If you have any questions, please contact Kadeanne Linhares, Senior Registered Environmental <br /> Health Specialist, at (209 468-0330. <br /> Sincerely, <br /> v <br /> Jeff Carruesco, REHS, RDI <br /> Program Coordinator <br /> JCNP:kI <br /> 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.