Laserfiche WebLink
SAN 10 A Q U I N Environmental Health Department <br /> - COUNTY <br /> RCRA Large Quantity Hazardous Waste Generator Inspection Report <br /> Facility Name : Facility Address : Date: <br /> OWENS -BROCKWAY GLASS CONTAINER INC 1 14700 W SCHULTE RD , TRACY June 05 , 2019 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I, CLASS II, or MINOR - Notice to Comply) <br /> Item # Remarks <br /> 503 CCR 66265 . 192 ( k) Hazardous waste tank assessment is incomplete . <br /> The hazardous waste tank assessments for the two 1 , 000-gallon used oil tanks are incomplete . Tightness testing for <br /> each tank and its ancillary equipment is missing . <br /> The hazardous waste tank assessment shall include all of the following information : <br /> 1 , tank configuration ( i . e . , horizontal , vertical ) , material of construction , and gross capacity ( in gallons) ; <br /> 2 . design standard (s ) , if available , according to which the tank and ancillary equipment were or will be constructed <br /> and all of the following information : <br /> A . material of construction ; <br /> B . material thickness and the method used to determine the thickness ; <br /> C . description of tank system piping ( material , diameter) ; <br /> D . description of any internal and external pumps ; and <br /> E . sketch or drawing of tank including dimensions . <br /> 3 . documented age of the tank system ( if tank was previously used ) , if available , ( otherwise , an estimate of the <br /> age ) ; <br /> 4 , description and evaluation of any leak detection equipment; <br /> 5 . description and evaluation of any corrosion protection equipment, devices , or material ; <br /> 6 . description and evaluation of any spill prevention or overfill equipment ; <br /> 7 , description and evaluation of secondary containment for the tank system including applicable secondary <br /> containment for ancillary equipment as required in subsection 66265 . 193(f) ; <br /> 8 . hazardous characteristics of the wastes that have been or will be handled . <br /> 9 . prior to placing a new tank system or component in use , an independent, qualified installation inspector or an <br /> independent , qualified , professional engineer, registered in California , either of whom is trained and experienced in the <br /> proper installation of tank systems, shall inspect the system or component for the presence of any of the following <br /> items and document in writing the results of the inspection : <br /> A. weld cracks or breaks ; <br /> B . scrapes of protective coatings ; <br /> C . corrosion ; <br /> D . any structural damage or inadequate construction or installation such as cracks , punctures , damaged <br /> fittings . All discrepancies shall be documented in the assessment and remedied before the tank system is placed in <br /> use . <br /> 10 . all new tanks and ancillary equipment shall be tested for tightness prior to being placed in use . The results of <br /> the test(s ) shall be documented in this assessment . Tank system integrity or leak test requirements must be in <br /> compliance with all local requirements . Prior to conducting a tank system integrity test or leak test, contact local <br /> agency staff for local requirements . <br /> 11 , estimated remaining service life of the tank system based on findings of sections ( 1 ) through ( 10) . <br /> Immediately amend the tank system assessment to include all required information and submit a copy of the <br /> amendments to the EHD . <br /> This is a repeat violation , Class II . <br /> FA0006674 PR0220086 SCO01 06/05/2019 <br /> EHD 22-03 Rev. 09/27/2018 Page 11 of 13 RCRA Large Quantity Hazardous Waste Generator OIR <br /> 1868 E . Hazelton Avenue Stockton , California 95205 1 T 209 468-3420 F 209 464 -0138 1 www . sjcehd . com <br />