My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2200 - Hazardous Waste Program
>
PR0220086
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 6:24:14 PM
Creation date
8/17/2020 2:34:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0220086
PE
2250
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
847
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P: (209)468-0343 1 F: (209)468-3433 1 E: eflorido@slgov.org <br /> Please note that my email has changed to eflorido@sigov.org <br /> SAN JOAGUIN <br /> " <br /> COUNTY-Greatness groes here. <br /> From: Karen Petryna <Karen.Petryna @ghd.com> <br /> Sent: Friday,July 19, 2019 8:58 AM <br /> To: Florido, Elianna <eflorido@sjgov.org> <br /> Cc: Bill Boscacci <Bill.Boscacci@o-i.com>; Subbarao.Nagulapaty@ghd.com <br /> Subject: Conference Call with SJCEHD Inspector Elianna Florida, REHS re: RCRA Large Quantity Hazardous Waste <br /> Generator Inspection Report, dated 6/21/2019, for the 0-1 Facility at 14700 W. Schulte Rd,Tracy <br /> Hello, Elianna <br /> Thank you for speaking with me and Bill Boscacci on Thursday about the subject inspection report for Owens-Illinois <br /> Plant#22 in Tracy, and specifically Item #s 502 and 503. Please let me know if you agree with our understanding below. <br /> 1. You are expecting a copy of the Return to Compliance Certification form included with the subject report within <br /> 30 days of the amended report, or by July 21, 2019, with a statement documenting the corrective actions that <br /> have or will be taken for each violation. <br /> 2. In the returned form, corrective actions that have not been completed should be listed with a date of when they <br /> will be completed. <br /> 3. Regarding Item #503 for the two 1,000-gallon double-walled steel used oil tanks, since you have received tank <br /> integrity documentation,you are only looking for tank tightness testing certifications for these tanks to <br /> complete their tank system assessment and comply with CCR 66265.192. <br /> 4. Regarding Item #502 for the 1,550-gallon double-walled poly oily water tank,you are looking for a full tank <br /> system assessment to comply with CCR 66265.192. <br /> 5. Since all three tanks are double-walled, the secondary containment for the tanks themselves is adequate. <br /> 6. You will rely on an independent, qualified, professional engineer registered in California to certify the type and <br /> veracity of the tank tightness tests to be performed for all three tanks described above. <br /> As I said during our call, we want to make sure GHD is providing 0-1 with the service needed to fully address the Items <br /> listed above. <br /> Thank you, <br /> Karen <br /> Karen Petryna, PE, QSD/QSP I A GHD Senior Project Manager <br /> US West Region <br /> GHD <br /> Proudly employee owned <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.