Laserfiche WebLink
SANJ 0AQ U IN Environmental Health Department <br /> '� �:.z"L■• COUNTY Wayne Fox, REHS,Interim Director <br /> cq� P. Greatness grows here. PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco, REHS, RDI <br /> Willy Ng, REHS <br /> Muniappa Naidu, REHS <br /> Michael Kith,REHS <br /> Melissa Nissim,REHS <br /> August 13, 2020 <br /> To: San Joaquin County Community Development Department ^ , <br /> Attention: Alisa Goulart <br /> From: Aaron Gooderham; (209) 616-3062\i' �' J <br /> Environmental Health Specialist <br /> RE: PA-2000080 (IP), Referral, S00013579 <br /> 24670 North Tully Road, Acampo <br /> The following requirements have been identified as pertinent to this project. Other <br /> requirements may also apply. These requirements cannot be modified. <br /> 1) A soil suitability and nitrate loading study incorporating proposed staff, customer and all <br /> existing and proposed onsite wastewater treatment system use shall be submitted to the <br /> Environmental Health Department; indicating that the area is suitable for septic system <br /> usage. The studies must be approved by the Environmental Health Department prior to <br /> issuance of a certificate of final occupancy. (San Joaquin County Development Title, Section <br /> 9-1105.2(d)). <br /> The fee will be based on the current schedule at the time of payment. <br /> 2) Submit revised site plans to the Environmental Health Department showing the location and <br /> configuration of any existing and proposed sewage disposal systems, along with the area <br /> required to be reserved for future sewage disposal repair/replacement (area for 100% <br /> sewage disposal replacement). The plans shall include the design calculations, including the <br /> maximum number of persons the sewage disposal system is proposed to serve. In addition, <br /> show on revised plans that the disposal field area will be barricaded so it cannot be driven <br /> over, parked on, or used as a storage area. This disposal field area must be used for that <br /> specific purpose only, and it cannot contain any underground utility lines (San Joaquin <br /> County Development Title, Section 9-1110.4(c)(5)). <br /> a) The revised site plans shall also designate the restroom facilities that customers and <br /> employees will use. <br /> 3) A manure management plan shall be submitted for approval to the Environmental Health <br /> Department. The number of animals per acre shall be consistent with appropriate waste <br /> management practices. Compliance with San Joaquin County Development Title 5, and the <br /> California Code of Regulations, Title 23, Division 3, Chapter 15, Article 6 shall be addressed <br /> in the manure management plan. <br /> The fee will be based on the current schedule at the time of payment. <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />