My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:56:10 AM
Creation date
8/18/2020 10:13:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aU `" SAN ) 0 A Q U I N Environmental Health Department <br /> (CV <br /> o.\ `.2T« Kasey Foley, REHS , Interim Director <br /> y ;: COUNTYPROGRAM COORDINATORS <br /> �tIFo aGreatness grows here . RobeJeff Cart McCl REHREHS <br /> S, RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Melissa Nissim , REHS <br /> December 26 , 2019 <br /> JANELLE DOCKHAM <br /> CONFIDENCE UST SERVICES <br /> 16250 MEACHAM RD <br /> BAKERSFIELD , CA 93314 <br /> Re . TIWANA GAS & FOOD <br /> 1210 E HAMMER LANE SR0081496 <br /> STOCKTON , CA 95210 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to replace dispensers with conversion frames and convert the <br /> premium tank to a diesel , convert the 89 tank to 91 and cold start the monitoring panel on the <br /> underground storage tank ( UST) system at the above noted address . The permit has been <br /> approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior <br /> to commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Paul Nso at (209 ) 468 - 3432 to arrange the following appointments ( a 48 - hour notice <br /> is required for inspection appointments ) . <br /> • Verification of the dispenser footprints contained by the under dispenser containment <br /> sumps ( UDCs) . <br /> • Visual inspection of the piping within the dispensers for any leaks . <br /> • Verification of the installation of the Bravo CONY- 380 conversion frame per <br /> manufacturer instructions . <br /> • Sensor functionality : Functionality of the monitoring system must be verified to ensure <br /> that monitoring has been restored to meet the requirements of Title 23 California Code <br /> of Regulations and the Health & Safety Code . A copy of the alarm history shall be <br /> printed prior to performing the " cold start" of the monitoring system and made available <br /> at the time of EHD inspection . <br /> • If concrete will be broken near the tank , piping or sumps a secondary containment test <br /> must be performed on the affected components once concrete is poured in accordance <br /> with the manufacturer' s guidelines and rest results submitted to the EHD within 30 days <br /> of testing . <br />
The URL can be used to link to this page
Your browser does not support the video tag.