My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:56:10 AM
Creation date
8/18/2020 10:13:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL- 24 -2018 TUE 10 '122 AM Able Maintenance FAX N0, 7075455515 P , 03 <br /> IMPORTANT - READ THIS FIRST � � y �� � '� � C A # D <br /> NOV Fiber Glass Systems <br /> Installation Statement ENViRON ;;iIENTA <br /> t- FAITH DEPART HEW <br /> 1 . It is the End Users/Contractors/Customers responsibil- <br /> ity to read and understand all engineering and installa- <br /> tion related manuals and guides for the product to be <br /> installed . <br /> 2, Fiber Glass Systems , L, P, (FGS) dues not warranty the <br /> I <br /> nstallation of the goods nor shall it be responsible for <br /> the performance or workmanship of any person or entity <br /> engaged in the installation or installation supervision . <br /> 3 , it is strongly recommended the installer be properly <br /> trained . Fiber Glass Systems offers several types of cer- <br /> tification training classes and/or installation job startups . <br /> 4, Fiber Glass Systems recommends a pre-installation <br /> start up meeting with the Distributor and/or Regional <br /> Manager and/or Field Service Representative to discuss <br /> specifics of the installation to include but no limited toa <br /> a. Review handling and storage <br /> b . Review installation procedures <br /> c . Tools and materials requited for a proper installation <br /> d , Job start up and/or certification training by a <br /> certified FGS Field Service Representative <br /> 5 . Fiber Glass Systems strongly recommends early hydra <br /> testing to ensure the reliability of the field workmanship , <br /> Testing is recommended at the following points of the <br /> installation . <br /> a , High pressure line pipe - 5400' maximum <br /> b . Low pressure long straight runs of pipe - 2500' <br /> maximum <br /> c . Fitting intensive piping projects - 50 ' 0 nts maximum <br /> 6 . It is the End Users/Contractors/Customers responsibility <br /> to read and understand the Field Service Policy as it <br /> relates to on -site training sand /or certification . <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.