My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4733
>
2300 - Underground Storage Tank Program
>
PR0232510
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:15 PM
Creation date
8/18/2020 10:38:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232510
PE
2361
FACILITY_ID
FA0003924
FACILITY_NAME
HUNT & SONS INC - ARCH ROAD CARDLOCK
STREET_NUMBER
4733
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95206
APN
17930008
CURRENT_STATUS
01
SITE_LOCATION
4733 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN FIBERGLASS , INC . CONTACT US FOR MORE INFORMATION ! <br /> sales@westernfg . com Ph 707 . 523 . 2050 , Fx 707 . 523 . 2046 <br /> SUMP PENETRATIONS : <br /> Piping and electrical conduit penetrations are made using only a Listed /Approved <br /> penetration , sealing device . Use care when drilling through filament wound sump riser <br /> tubes . Do not force hole saw, for FRP sumps , cut hole slowly , half way through from both <br /> sides ( inside and out ) to prevent fraying of filament strands . Always use correct size hole saw <br /> or drill . Do not fiberglass bond piping or conduit directly to FRP sumps as this will not allow <br /> any movement , due to ground settling , back- fill , etc . <br /> BACKFILL REQUIREMENTS : <br /> Sufficient backfill must be used below and along the sump side to provide support and <br /> protection against ground movement . <br /> TEST PROCEDURES FOR SINGLE WALL . <br /> After the sump to tank fitting is completed , you shall test the integrity of your seal . This is <br /> important to insure that the sump riser tube / tank bond will not allow any contained fluid to <br /> leak . Check with local regulations for required testing procedures . A common test procedure <br /> is to fill the sump with water after the sump / tank bond has completely cured , usually <br /> overnight , and observe bond seam for any leaks . <br /> ADDITIONAL INSTALLATION REQUIREMENTS - STATE OF FLORIDA ONLY : <br /> Leak Test Requirement : <br /> 1 ) a . Fill entire sump within 4 to 6 inches of top . <br /> b . Observe water level for a minimum of 3 hours . <br /> c . Water level shall not decrease more than allowable for normal evaporation . <br /> 2 ) a . Fill interstitial space of sump within 4 to 6 inches of top . <br /> b . Observe water level . <br /> c . Water level shall not decrease more than allowable for normal evaporation . <br /> Interstitial space shall be tested by vacuum ( 5 bars ) or pressure ( 2 psi ) for a minimum of 10 minutes . <br /> TEST PROCEDURES FOR DOUBLE WALL . <br /> After completion of the sump body test as described above , you may test the sump body <br /> interstitial space by applying no more than 2 psi to the port ( s ) installed within the sump <br /> body . The annular space may also be tested using liquid or vacuum . For test times or other <br /> requirements , always follow local regulations and restrictions . <br /> PLEASE NOTE : U . L . Listed sumps require a listed , approved , electronic monitor/ alarm system to <br /> be installed for operator notification in the event of product leakage within sump area . <br /> PAGE 5 OF 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.