Laserfiche WebLink
OPW Installation, Operation, and Maintenance Manual, Page 74 Executive Order VR-102-Q <br /> ®Registered T.M. -Owens Corning Fiberglass Corporation ASSEMBLY INSTRUCTIONS <br /> Tapemeasure IMPORTANT: Each of the numbered steps in the instal- <br /> lation instructions are designed as a CHECK LIST to en- <br /> sure proper installation and trouble free operation of the <br /> OPW 61 SO Overfill Prevention Valve. <br /> Read and follow these steps carefully,checking them off <br /> as you proceed. <br /> Riser <br /> Pipe Figure numbers correspond to step numbers for easy <br /> with To Tank ( ) reference. <br /> Face Top To <br /> seal Adaptor <br /> (I.�.) Tank STEP 1: MEASURE <br /> Boll om InstalllheOPWFace SealAdaptorandtheOPWThread- <br /> on Spill Containeron the Fill Riser(Refertothe Installa- <br /> tion Instructions Supplied with the Spill Container). In- <br /> sert a tape measure through the riser pipe and hook it <br /> under the inside of the tank in the lengthwise direction. <br /> EXAMPLE <br /> Measure the distance from the top of the Face Seal <br /> 1) For an Owens-Corning Model G-3 Fiberglass®Tank Adaptor threads inside the base of the spill container <br /> Calibration Chart: bucket just below the drain valve outlet window to the <br /> Tank Capacity- 10,000 gal., nominal 9,403 gal. inside,top lip of the storage tank(Dim."A") <br /> NOTE: Use actual capacity only (See Figure 1 &1A). <br /> 2) 95%of actual tank capacity=0.95 x 9403 gal.= The top flange on the 6180 will rest on the Face Seal <br /> 8933 gal. Adaptor just below the drain valve outlet, and be locked <br /> 3) The closest numberwhich is less than 8933 gal.Is in place between the Face Seal Adaptor and the 4" <br /> 8910 gal.Choosing the closest number less than nipple that is installed in the spill container with the <br /> 95%of actual capacity ensures that the initial Jack Screw Kit(See Figure 11A). (For riser pipe configu- <br /> shutoff will occur when the tank is no more than rations other than that shown, consult installation <br /> 95%full, drawings or use other necessary means to measure Di- <br /> 4) The calibration chart reading of 8910 gal.corre- mension"A"). <br /> sponds to a dipstick measurement of 82". Using a tape measure,measure the distance from the top <br /> 5) Dipstick number(X)=82" of the Face Seal Adaptor in the spill container to the <br /> Tank diameter(Y)=92" bottom of the tank(Dim. "B"). <br /> (Y)-(X)=(Z) (92"-2"=10") IMPORTANT:Inspect the riser pipe for any foreign ma- <br /> (Z)=10" terial. Over spray from tank relining or any internal burrs <br /> 6) (Z)-2"=C (10"-2"= 8") inside of pipe must be removed prior to installation. <br /> C=8" Failure to have an unobstructed riser pipe may prevent <br /> 7) Is 8"less than 6-112"? proper installation and operation of the valve.The 61 SO <br /> is designed for installation into schedule 40 riser pipes. <br /> The 61 SO cannot be installed into schedule 80 riser <br /> NO Measure the distance from the top of the FSA- pipes. <br /> 400 Face Seal Adaptor installed on the riser pipe STEP 2: MARKTHETUBE <br /> to the inside,top lip of the storage tank and Use the result from Step 1 and HOW TO LOCATE THE <br /> obtain measurement(A). POSITION OFTHE 61 SO AT 95%TANK CAPACITYto <br /> Upper tube length=C+(A) mark the upper tube. Measure the distance from the <br /> point where the upper tube and valve body meet. For <br /> "C"measurements greater than 6- 112"use tape <br /> measure to mark the calculated upper tube length onto <br /> the upper tube. <br />