Laserfiche WebLink
� I <br /> OPW Installation , Operation , and Maintenance Manual , Page 77 Executive Order VR- 102-0 ; <br /> I APORTANTa Before installing the valve , allow seal - CAUTION : No obstruction in the tank can be within 13" <br /> nt to cure for 24 hours . from the center of the riser pipe or the valve may not <br /> operate properly . j <br /> STEP 16 : ALIGN VALVE <br /> STEP 13 : REMOVE ELASTIC BAND Install the OPW Jack Screw Kit and a 4 " nipple to lock <br /> Remove the elastic band securing the float to the valve the valve in place . Refer to the Installation Instructions l <br /> body . The float will move into an outward position . supplied with the Jack Screw Kit . Install the Rotatable <br /> STEP 14 : INSERT DROP TUBE Product Adaptor ( Refer to Installation Instructions sup - <br /> Make sure the 0 - Ring gasket is under I ' � plied with the Rotatable Product Adaptor. ) Make sure <br /> the flange of the inlet tube . Hold the that the valve does not rotate while tightening the E <br /> floatdownagainst the valve body and adaptor by observing the position of the deflector . The <br /> slowly insert the drop tube overfill valve valve must remain aligned along the length of the tank <br /> into the riser pipe . Do not force valve - as in Step 15 . Repeat this step as necessary to assure <br /> into the riser pipe . If any obstruction orp roper valve alignment . <br /> foreign matter interfereswith smooth <br /> insertion of the valve , the riser pipe must iF. tse <br /> becleared . <br /> WARNING Failure to follow the assem - <br /> bly and installation instructions or useViol' i <br /> of excessive force to insert the OPW h�= = <br /> 61 SO will VOID THE WARRANTY ! ; is <br /> Difficulty in removing the existing fill <br /> tube ( if there isone ) meanstheremay <br /> `"` <br /> be an obstruction in the riser pipe . Look <br /> for burrs , deformations , excess tank lin - r '' ``' <br /> pqp. : r�-ngr15 � j <br /> ing material or other projections that may interfere with <br /> easy insertion of the OPW 61 S0 , The 61 SO is designed p- <br /> for insertion into schedule 40 pipe . If schedule 80 pipe - - ---- <br /> has been used for the riser , the 61 SO cannot be in ,, At a'" _'`"` k'=rj l #n;r °` Tar . —" <br /> stalled , If seamed pipe has been used , the internal weld <br /> bead may interfere with the OPW 61 SO and prevent Figure 16 ti <br /> installation . If the OPW 61 SO won 't slip in easily DON 'T <br /> FORCE ITI Damage to the valve may result if excessT� - <br /> force is used . Examine the riser pipe carefully ; deter- <br /> mine the nature of the obstruction ; take appropriate _ <br /> steps to remove it . <br /> STEP 15 : CHECK INSTALLATION <br /> Insert the drop tube all the way into Fl <br /> the tank until the flange and gasket <br /> seat onto the top of the Face Seal <br /> Adaptor . The float will swing out } <br /> into the operating position as it <br /> passes into the tank . Make sure <br /> that the float is aligned along the <br /> length of the tank . The length of b i <br /> the tank can easily be determined <br /> by locating other manholes or <br /> pump boxes that are installed i Figure 16A <br /> around other tank fittings . Look — fgarg15- <br /> into the drop tube and align the deflector tl <br /> with the length of the tank . � <br /> E& <br /> 4I4 . <br /> t <br /> I, <br /> �f <br /> i¢s <br /> t? <br />