Laserfiche WebLink
r>� <br /> ELEVEn <br /> Resolution 4 : The Underground Storage Tank Statement of Understanding and Compliance Form was <br /> uploaded into CERS on 02/28/ 2019 . <br /> Item 5 : On your inspection report you noted that the previous inspection report , which was due on <br /> March 4th, 2018 , was submitted on May 5th , 2018 . You noted that an operator that receives an <br /> inspection report shall have 30 days to submit a written response that includes a statement <br /> documenting corrective actions taken or proposing corrective actions which will be taken . <br /> Resolution 5 : In the past 7 - Eleven would communicate the status of repairs and other activities taking <br /> place in relation to inspection items noted which would be followed up by a more formal response once <br /> all of the items were corrected and documented . However, at the request of the San Joaquin County <br /> EHD, 7 - Eleven will now work to submit a response to any and all agency inspections issues within 30 <br /> days of receipt, even if there are items still needing to be addressed ( i . e . repairs requiring a permit ) , <br /> versus waiting for confirmation of closure of all issues . <br /> Item 6 : On your inspection report you noted that the Overfill protection test forms were not found <br /> onsite . You requested that the test forms be placed onsite . <br /> Resolution 6 : The overfill protection survey has been performed for all three tanks has been performed <br /> and all three tanks did not pass . Those reports have been attached to this report for your review and <br /> have been placed onsite . New drop tubes are needed to bring the site back into compliance and a <br /> permit application has been completed by Walton Engineering and submitted on 02/ 14/2019 . <br /> Item 7 : On your inspection report you noted that the fuel filters under the dispensers are not located to <br /> allow drips and leaks to drain back into the UDC . You requested that the underground storage tank <br /> system be retrofitted so that it can be operated to prevent unauthorized releases . <br /> Resolution 7 : Dispenser shields are on order and Walton Engineering will be installing them once the <br /> parts arrive . Walton Engineering will schedule a post- installation inspection once the work has been <br /> completed . <br /> This letter should address the item ( s ) noted on the Inspection Report . 7 - Eleven assumes that all issues <br /> regarding this report have been resolved and are closed at this time . The submittal of this response by <br /> 7 - Eleven , Inc . shall not constitute , nor be deemed to constitute, an admission of liability or responsibility <br /> with respect to the alleged violations and may not be used in any administrative or judicial proceeding <br /> or otherwise . <br /> P .O . Box 711 — Dallas , Texas 75221 -0711 <br />