Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of s) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> Check all that apply.) Simulated leak rate verified : ® 3 GPH ❑ 0 . 1 GPH ❑ 0 .2 GPH <br /> Was the testing apparatus properly calibrated ? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? M ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? M ❑ ❑ <br /> For an answer of "N" above, describe in section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ® Check this box if VPH monitoring is NOT used . (Do not complete this section .) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply . ) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ElSimulated leak at far ends of the interstitial space . FIVisual Inspection <br /> ElOther (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "FAIL " above, describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> 1 <br /> IL , ' <br /> If <br /> GPH o Millnnc nPr hour. Y = Yaw.. N o Nn. NA o Nnt annlirah1P- VPH o Vnr_uum/Pracci irP/Hvdrrtcfafir_ Ino Idantifirntion <br /> l <br />