My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:27:47 AM
Creation date
8/18/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br />XVI. LINE LEAK DETECTOR TESTING <br />F1 Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />Y <br />N <br />NA <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: (✓ 3 GPG 1.1 GPG r 0.2 GPH <br />Was the testing apparatus properly calibrated? <br />r <br />r <br />r <br />r <br />r <br />r <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />r <br />r <br />r <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />r <br />r <br />r <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />r <br />r <br />r <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />r <br />r <br />r <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />r <br />r <br />F✓ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />r <br />r <br />r <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />r <br />r <br />Were all LLDs confirmed operational within regulatory requirements? <br />r <br />r <br />For any answer of "N" above, describe in section X111 how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br />r Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type Mark all that apply') r Vacuum I' Pressure r H drostatic <br />Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Interstitial <br />Test <br />Communication <br />Test <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />How was interstitial communication verified? r Simulated leak at far ends of the interstitial space. r <br />r Other (Describe the method in section XV below.) r <br />Visual Inspection <br />Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? r Yes r No (Describe the reason <br />in section XV below.) <br />For any answer of "N" above, describe in section X111 how and when these issues were or will be corrected. <br />XV. COMMENTS <br />R E C !I 1,1 <br />APR 2 4 2019 <br />ED; <br />GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/ res ��iicy�l�iietification <br />DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.