Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring venUtransition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> - - - - - - - - - - - - - - - --- .. ..... <br /> site Address_ I REE HARDING WAY STOCKTON CA 95204 <br /> El <br /> I ff I <br /> CANISTER <br /> . . <br /> . J <br /> . . _ . . STORE <br /> rzrz <br /> i= s _ . <br /> . _ T <br /> KEY <br /> A = APNIMAR P f <br /> F = FILLS X �PIPLNG <br /> T = TURBINE Drimintt of piping <br /> P = PROBE exit of sump and <br /> V = VA20R D UDC' s. \o <br /> X = SUMP SENSOR Y � � O � underground <br /> T <br /> L = Leak Detector T F 4 F v &ait.filgL <br /> AI= Alann-at gs, we <br /> B = Brine Sensor X X cannot speculate <br /> I = Smart Sensor blue prints. <br /> S = STP <br /> C = Floats & Chau, <br /> E = E Stop CFPifER STREET <br /> orb ftRna rnr�igrararl rherare nor itstble ro r)E eei r{fiingr�hrfcfarrms a <br /> �,rgfessfcrnl oprracrr orttt• mid n-e sda�i fce- ir�'onrntiotarlprnpca�_ Drmrirg <br /> 170troscede <br /> Instructions <br /> If you already have a diagram that shows all required information , you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Cleady identity loeatbons of the following equipment. if installed: monitomg system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line Leak detectors; and in-tank liquid level <br /> probes (d used for leak detection). In the spat_ provided, note the date this Site Plan was prepared. <br /> LEGEND <br />