Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 10/30/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address SYNERGY — CENTRAL GAS 642 N HUNTER ST <br /> C <br /> c N*v�ASH I <br /> 1 . _ .3 _ 5. _ 7. - 9` — 11 _ . <br /> . . <br /> 2. A _ .0. 8. = 10. l 12. = . . . _ <br /> i•IAP KEY: <br /> A AJNNULAR SENSOR 874 AL <br /> F=FILL s `' J . . _ . . <br /> P=PROBE x X <br /> V=VJNPOR <br /> ST=SLAVE TURBINE <br /> L.—LEAK DETECTORr TURBINE <br /> X=SENSOR <br /> *PIPING = <br /> X <br /> (ARROWS) . . . . - . . . - - - . / a { . . <br /> Drawing of <br /> piping exit of <br /> sump and UDC's. . . _ . <br /> No underground L <br /> drafting is <br /> accurate. ive <br /> cannot speculate X <br /> blueprints. <br /> .Amy items underground that are not visible to the cettifjting technician are a <br /> professional opinion only and are solely for informational purposes. DrauiuS not to <br /> !Cale. <br /> Date map was drawn: 10PX1M l; <br /> Instructions <br /> If you already have a diagram that shows all required informaton, you may include 8, rather than this page, pith your htonitaing Sysiam Certificatcn. On your site plan, <br /> show the general layout of tanks and piping. Clearly Identify Iccations of the folimving squiprnent, it installed: monitcerig system oontrol panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other seorndary containment areas; mechanical or electronic ;me leak detectors; ani in-tank liquid leve: <br /> prcbes (if used for leak detection). In the space provided, note the date this Site Pian was prepared. <br /> LEGEND <br />