Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 10/30/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address SYNERGY — CENTRAL GAS 642 N HUNTER ST <br /> CAR <br /> NVASH <br /> 04 <br /> 1 . _ .3 = 5. _ . 7. = 4. _ 11 = . <br /> . . 2. 4 = .@ . B. _ 10. . 12. = . . . <br /> X AP laY; <br /> 1=1NDTUL kR SENSOR 87-2 Lb 1 0 a do <br /> - . <br /> F=FILL A > t- <br /> P=PROBE % <br /> V=V APOR . . . . <br /> ST=SLAVE TURELNE I I <br /> L=LEAKDET£CTOWTURBINE m I • I I • • • ' <br /> L <br /> 'PIPING <br /> (ARROWS) . _ . . . . k <br /> Drawing of <br /> piping exit of <br /> sump and UDC Is <br /> No undetgzound D <br /> drawing is <br /> accurate. rteIV <br /> cannot speculate �/ �/ <br /> blue print. <br /> Any items underground that are not t istble to tLe cenifyine technician are a <br /> professional opinion only and are solely for informational purpales. Drafting not to <br /> scale. <br /> Date map was drawn: 100= 111 <br /> Instructions <br /> If you already have a diagram that shotes all required information, you may include it, rather than th s page, pith your Monitoring System Certification_ On ycur site plan, <br /> shote the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system oontrol panels: sensor monitoring tank <br /> annular spaces, sumps, disparrer pans, spill containers, or other semridary containment areas; mechanical or electronic Erie leak detector; and In4ank liquid lewd <br /> pntbes (B used for leak detection). In the space provided, note the dare this Sire Plan was prepared. <br /> LEGEND <br />