Laserfiche WebLink
rn <br /> C <br /> V fv <br /> 6ENERAL hffUfANIOAL CONDITIONS D. Sequence of operation 6ENERAL PLUN�IN6 CONDITIONS G Lo U) <br /> Tenant shall furnish selected mechanical equipment, accessories and E. Provide round spin-in fittings with locking volume damper A. SCOPE o Ln <br /> controls as scheduled and ass specified. The mechanical subcontractors) I. Occupied hours. for ever inlet and outlet attachment to the main E. INSULATION y Q � a, <br /> P y I. Provide all labor, materials, tools and N <br /> shall be responsible for delivery coordination, receiving, storing, setting, a. Unit outdoor air damper shall open to its minimum trunk duct whether shown on the plans or not. equipment necessar to complete the work, I. All water piping, horizontal and vertical = o Lo N <br /> startup and installing all tenant furnished equipment as well as the one year position and unit supply fan shall operate continuously. Provide additional locking volume dampers at QII secondary y P 4. No water or drain lines shall be permitted over shall be insulated with fiberglass pipe <br /> including installation of plumbing piping and fixtures. electrical or telecommunication panels or in r LL o <br /> parts and labor warranty from the date of store opening. b. For units connected to the CO2 sensors stem, branch takeoffs from ductwork mains and as indicated p insulation with an QII purpose vapor C o -5 1n <br /> y All materials shall be new and be installed in telecommunication rooms. C cn 1n <br /> unit outdoor air damper shall modulate from its minimum on plans. Provide inspection access panels in ducts a workmanlike manner in accordance with barrier jacket. Insulation per code a _ V E <br /> A. 5GOPE scheduled position to its maximum scheduled position at QII fire dampers. on water piping. All insulating materials Q o 0 <br /> I. Provide all labor, materials and equipment in response to space mounted G02 sensor (by others) the drawings and specifications. 5. Provide protective metal cover plates over P 0 ( Y <br /> set at 800 m. F. 5u I return and positive pressure exhaust ductwork studs and oists where pipes penetrate shall have a maximum 25 flames read c 1n 0 <br /> necessary{ to properly install air conditioning PP pp y' p p 2. Provide excavation and back fill of all trenches P P P rating and 50 smoke developed rating. I H `�' h m a+ <br /> systems where shown on drawin s and as scheduled. c. Unit com ressor(s) shall c cle or heat exchan er shall shall be sealed in accordance with 5MAGNA incidental to the lumbin work as shown on close to edge of stud or joist w J � E + <br /> y g p y g Seal Glass G. plumbing 2. Approved insulation blocking shall be Z Q " N � 11 Z <br /> stage to maintain space setpoint. the drawings. Back fill shall compacted to 9095. 6. Provide chrome plated escutcheons where � .o �i <br /> 2. Provide equipment as s specified together with all d. Unit economizer cycle shall be initiated upon a si nal from g 3. Provide all backing, supports and carriers pipes pass through floors, walls and placed between sheet metal jacket and W 'G <br /> P 9 6. Gore-drill or saw-cut existing walls, roof, etc. <br /> necessary ducts, grilles, registers, controls, y g g pp ceilings in finished spaces. bottom of the pipe where jacket alone a co � Z <br /> out door and return air temperature an enthalpy sensors. or required for piping or ductwork and fire-stop for fixtures. g P cannot prevent crushing. Insulation = v -S a <br /> piping, low voltage fans, control wiring, Outdoor air dampper, return air damper and unit compressors) opening around pipe or ductwork. Verify location 4. Provide all cuttingand patching of the con- -f. All piping shall be installed with adequate hangers, stands, equipment supports, flashing at El <br /> shall cycle to mdintoin space setpoint. economizer cycle shall of structural beams, oasts, etc. before drilling P g pP g q jacket or vapor barrier shall be sealed <br /> equipment, duct and pipe insulation, unless over ride G02 monitoring system. construction work, rough finish and trim, which provision for expansion and contraction after installing blocking. (5ee hangers, <br /> or cutting. Notify architect of any discrepancies. maybe required for the installation of using swan joints, pipe clamps, anchors <br /> otherwise noted. 2. Unoccupied hours. q � 9 9 j P•P P supports and sleeves <br /> P H. Wherever foundation walls, outside walls, roofs, equipment. All patching shall match QII and expansion joints. Fittings shall be <br /> 3. Related Work by Others: a. Unit outdoor air damper shall remain closed and unit etc. are cut for installation of systems, they surrounding work. so spaced that they will not interfere F. FIAN6t"RS SUPPORTS AND SLEEVES <br /> a. Painting except as herein specified. supply fan shall cycle on Q signal from space sensor. shall be patched to match existing construction 5. Contractor shall make all plumbing and with sliding of pipe on supports. ' <br /> b. Line voltage wiring and conduit. b. Unit compressors) shall cycle or heat exchanger shall and sealed weather tight. Work shall be performed piping connections to equipment specified to 8. All openings in the roof shall be flashed I. All drain, waste, hot and cold water, <br /> c. Electrical supply connection to equipment. stage with unit supply fan to maintains ace set oint. by craftsmen skilled in their respective trades. and natural gas piping exposed, above <br /> g pp y p p be furnished by tenant or under other sections watertight per the instruction of the grade and in furred areas, shall be supported <br /> B. All work shall conform to all federal, state and 3. Smoke alarm (where required). of the specifications including final connections Landlords roofing contractor to maintain <br /> I. Provide 3 sets of pleated dis osable filters. One in place with securely fastened solid pipe c <br /> local codes and any landlord requirements as p p to air conditioning and heating equipment. roof WARRANTY. hangers not over 6-0" a art and at each <br /> specified in the executed Lease Agreement. Q. Unit outdoor air damper shall close and unit supply fan shall set to be used until completion of construction g P <br /> P g stop on a signal from duct smoke detector. Duct smoke hale. Install one set at completion of 6. Contractor shall provide sufficient approved B. DRAIN,WASTE AND VENT change in direction, (5'-0" on cast iron pipe). .2 <br /> Contractor shall verifyand coordinate p p U <br /> detector shall send a signal to remote alarm device. construction hale and deliver one set to owner water hammer arrestors (Wade "5HOGK STOP", I. All waste pi Ing shall be itched a <br /> scope of work with tenant and landlord. p ore equivalent) to prevent water hammer. minimum ofp 4"g sh foot here 2. Pipe hangers shall be installed around <br /> and label each set of filters to denote their q p / P the outside of insulation with vapor 73 <br /> G. The Contractor shall examine the premises and6RILLES,RESISTERS,AND DIFR15ER5 respective HVAG units. 1. Contractor shall thoroughly clean all fixtures, possible. Piping greater than 4" barriers, and insulation shall be <br /> verify the existing conditions under which he will equipment and piping after installation. diameter may be pitched at I/8" per protected against crushing by sheet <br /> be obligated to operate in performing his part of A. The contractor shall provide grilles, registers, and diffusers J. Provide two Operation and Maintenance Manuals bound S. Gontractor shall provide approved access foot, only where required by existing metal jacket of proper area and weight. > <br /> the work or that will in any manner affect the work where indicated and as scheduled on the drawin s. in S-1/2" x 11" page binders, titled "Operation p PP conditions, subject to the approval of <br /> g P 9 p doors in framed holes for all valves, traps 3. All water piping running through <br /> under contract. No additional compensation shall And Maintenance Manual". 5ubdivide binder the authorityhaving urisdiction, p p g g g <br /> provided for conditions found during the execution B. Grilles, registers, and diffusers shall be provided with which must be located in inaccessible locations. g� floors or walls shall be isolated from <br /> p g opposed blade volume dam ers. contents with page dividers by system and 2. Drains and P-tra s: l7 a. G.P. Brass <br /> of contracted work. The contractor shall cooperate pp p e ui ment. Include all shop drawin s, and warranties. a. Contractor shall provide cutout data for all sinks P g the penetration with a sleeve. m <br /> with the all other trades so that the installation of G. 6rilles, registers, and diffusers shall be provided with <br /> equipment. p g and lavatories to all other related trades. where exposed to view extending to Maintain the fire ratan of all 0 <br /> g P Submission of these documents shall be a requirement wall. Nominal size of drain and trapwall and floor enetrations use c � <br /> all equipment may be properly coordinated. frame types to match the surface into which they will for final payment. 10. Contractor shall obtain and pay for QII required p by o <br /> Contractor shall bring to the attention of the be installed. P y permits, inspections and certificates in connection shall not be smaller than the fixture of approved fire stop materials. Ln <br /> outlet to which it is attached. > CU <br /> construction manager any discrepancies between D. 6rilles, registers, and diffusers shall be provided with TESTING,ADJOSTIN6,BALANCING AND INSPECTION with the his work and make all arrangements with 4. Sleeves through walls shall be cut so <br /> field conditions and design documents. factory applied white finish. utility companies for service and connections and 3. Vents shall extend not less than 12" as to be flush with the finished surface <br /> D. All equipment furnished shall fit the space a all fees, charges permits and meter charges. through roof. They shall be gathered <br /> E. Design is based on products manufactured by Tuttle � A. Work shall be performed after the complete installation pay g P g together where possible into one vent of of the wall in each case and shall be <br /> available, with connections, etc., in the Bailey. Products of equivalent performance, construction, and startup of all equipment, duct systems and equivalent area. Vents shall be flashed made watertight. <br /> required locations and with adequate space for and appearance may be supplied. temperature and energy management controls and MASA-•` indicated on the drawings. All vents <br /> completed prior to turnover for the start of stocking. a S• TESTING <br /> operating and servicing. 5hould a conflict com sand the EXHAUST FANS p p g' A. DRAINI,WASTE AND VENT shall be a minimum of 10 O from any <br /> exist between the drawin <br /> g fresh air intakes, or greater if required 1. Drain, waste and vent lines shall pass <br /> specifications, the contractor shall promptly B. Contractor shall submit test and balance report I. Service Height, cast iron bell and spigot g q inspection under head of water <br /> P P P y A. The Contractor shall provide exhaust fans where P g <br /> p to General Contractor for submittal to tenant's pipe and fittings. No-hub service Height by local code. p e <br /> by <br /> notify the construction manager whose decision shall be final. indicated and as scheduled on the drawings. p p g ' g system with water to top of highest <br /> No allowance will be made subsequently n this project manager and local code authority (if required). pipe and fittings may be used above grade 4. Gleanouts, same size as pipe, shall be <br /> q y i <br /> vent stack. <br /> connection to behalf of the contractor after award B. Inline exhaust fans shall be furnished with vibration when permitted by local code. installed in soil and waste lines at every <br /> of the contract. isolatinghangars and all related hardware. G. Balancing of air devices shall be accomplished by change of direction and at every 100 2. Water lines shall ass inspection of 2 <br /> 9 2. Schedule 40, galvanized steel pipe and p p 2- <br /> adjusting branch takeoff damper at main trunk feet of run whether shown on the drawings four (4) hours under 150 si pressure. <br /> L <br /> E. All mechanical equipment shall conform with the G. All exhaust fans shall be furnished with back draft duct. Dampers in the necks of air devices shall be banded malleable iron screw fittings. or not;and shall be accessible in all cases. P p n <br /> requirements of the State Mechanical Gode, the P Before any use of system is made for a) <br /> q damper, insect screen, motor and drive, and used for final trim only and in no case for 3. Schedule 40 and SO PVG or AB5 piping When occurring in finished wall or floor, domestic purposes, it shall be _0 <br /> State Building Gode, the State Energy Gode, options and accessories as scheduled on drawings. greater than 10% if the indicated volume for the with DWV pattern fittings may be used where set flush with surrounding surface. disinfected by slowly filling with water <br /> NFPA cIOA, x6.101 and all applicable local codes individual air device. allowed by local code. Foam core PVG piping to which a disinfectin agent has been <br /> and ordinances. will not be approved. 5. Gleanouts as a minimum shall be located 9 <br /> DUCTWORK D. Where existing duct is to be reused, contractor pp so that all soil and waste lines within injected at a rate of 50 p.p.m. of > <br /> F. Drawings for mechanical work are diagrammatic showing A. All ductwork shall be constructed of galvanized shall provide and install new manual dampers B. HOT AND COLD WATER or under building are accessible for chlorine, which should be allowed <br /> the general location, type, layout and equipment with locking quadrant in the runout duct at the 1. Above rade. cleanin without passing through more to stand in the piping for at least <br /> g yP ysteel sheet metal and be fabricated according to g q, g g P g g 24 hours, after which tests for <br /> required. The drawings shall not be scaled for the latest edition of the 5MAGNA HVAC Duct connection to the trunk duct as required for the a. Type "L" copper tubing, hard temper, than one ninety degree or two forty- <br /> exact measurements. Refer to manufacturer's Gom letion of balancin Gopd drawn at h wrou h t Go er lead five degree bends. Gleanout covers residual chlorine shall show not less <br /> Construction Standards for metal and flexible p g 9 PP than five(5) m. of residual chlorineCU <br /> standard installation drawings for equipment shall be set flush with floors and p•p (n -0 <br /> ductwork. free sweat fittings. Connections to fixtures at ever water outlet in the building. <br /> connections and installation requirements as E. Testing and balancing contractor shall also inspect the and equipment shall be made with 8595 grade with exposed plastic nut at y 9 0 <br /> B. All elbows shall have proper radius orIf the residual 1s less than five m, N <br /> required. Furnish and install ductwork, P p completed and operational HVAC equipment, duct systems red brass IPS size pipe or compression walls. PP >> CU <br /> connections, accessories, offsets and materials contractor shall provide turning vanes as required and temperature and energy management controls p P p the disinfection shall be repeated until E <br /> b 5MAGNA duct construction manual, p o g angle stops. Provide dielectric unions where O. WT AND COLD WATER the required residual is obtained <br /> necessary to facilitate the system's functioning y prior to turnover of the store for the start of stocking. connecting piping of dissimilar materials. q <br /> as indicated by the design and the equipment Testing and balancing contractor shall submit the completed 1. All water piping shall be itched in at every outlet. <br /> G. All duct connections to equipment shall be loaded b. PVG for cold water and GPVG for hot water p�P• 9 p• <br /> indicated. Contractor shall obtain QII necessary permits tenant's HVAC field inspection report to the General Contractor direction of flow to allow for s stem After re uired residual is obtained o o U) <br /> and a an associated fees. type vinyl, vibration elimination connections, for submittal to tenant's project manager for review. may be substituted for copper piping where y q <br /> pay y (FG) flexible connections. p g allowed by local Gode Authority for above grade draining. Install piping parallel to major at every outlet, the system shall beC4 co <br /> N <br /> 6. The contractor shall install all piping, ductwork, fixtures water piping only. building elements. flushed until the chlorine level at o o <br /> and equipment as required to conform the structure, D. Flex duct: Provide factory assembled Glass I air every outlet 15 reduced to that of o <br /> q 2. Below grade. 2. Install water main shutoff valves, Watts or incoming water supply <br /> avoid obstructions, preserve ceiling heights and duct (UL I outer <br /> with fiberglass insulation and FIRE AND SMOKE PARTITION PENETRATIONS ftERE REQUIRED) <br /> headroom and make all equipment requiring reinforced outer protective cover/vapor barrier. a. Type "k" copper tubing, hard or soft temper, approved equal, gate valve, above grade <br /> maintenance or repair accessible. Flex duct shall meet NFPA cIOA with flame spread A. The contractor shall familiarize himself with all fire rated with wrought copper lead free sweat fittings. below pressure regulator. 3. 6as lines shall stand a pressure of <br /> p p construction and install his work so as to maintain the Note: No fittings shall be permitted below 3. Install accessible hot and cold water 25 psi for Q period of 15 minutes <br /> under 25 smoke developed under 50, and shall be without perceptible drop. � <br /> H. The contractor shall install mechanical systems as shown, rated for I W.G. pressure and O to 250 degree integrity of the fire code rating. Maintain rating of fire grade inside building. stops Qt all fixtures. P P p' Y <br /> noted and specified. Equipment may not be temperature. Maximum length shall be 5'-0". rated and smoke rated construction. Sleeves shall be G. AIR GONDITIONIN6 GONDEN5ATE 4. Install dielectric isolators where in- 4. All testing shall be performed by (' CU m <br /> o c� <br /> substituted unless written approval the Minimum center line bend radius shall be 1 1/2 contractor at his own expense. _0 Q _0 -o 0 <br /> pp � steel or pre-manufactured sleeves similar to Pipe Shields, �� �� compatible atible i in materials come in P <br /> architect, engineer, or tenant's representative is duct diameters. Vapor barrier shall be sealed at Inc., for bare pipe through fire walls and floors, model WFB, I. Type L copper tubing, hard temper, <br /> obtained. An unauthorized changes shall be removed each end after connection to duct and air device. p p g cold drawn with wrought copper lead contact. P P g H. WARRANTY <br /> Any g DFB or QDFB. For plastic pipe, use type WFB with one inch free sweat fittings.contractor's expense if deemed necessary by architect, thick calcium silicate insulation encased in metal sleeve g 5. Install temperature and pressure relief <br /> engineer, or tenant's re resentative. Contractor shall E. All new supply, fresh air and return ductwork shall be 2. PVG piping may be substituted for air valves as required b Gode. I. All materials furnished and installed under <br /> g p extension two feet either side of fire rated walls or floor. p p 9 y q y <br /> insulated. NO EXCEPTIONS. Insulate with external this contract shall be new and free from QII <br /> be responsible for any required changes to related work Seal annular space around conduits. For fire and smoke conditioning condensate piping above roof 6. Install water pressure regulator, <br /> caused b the substitution of an items of materials or duct wrap or with shop applied duct liner. Duct wrap only where allowed b local Gode Authority. P g defects in materials and workmanship and w, <br /> y y ' rated floors, walls and partitions, use UL listed material y y y Watts or Wilkins where available I <br /> equipment Qt no additional cost to the owner. shall be foil reinforced kraft facing. All insulation All air conditioning condensate piping shall shall from <br /> guaranteed for a period of one (I) <br /> shall meet NFPA 90A flame spread under 25 and that maintains fire rated wall and floor integrity, similar to 9 P p g utility pressure exceeds 80 psi. year from the date of acceptance by <br /> p RTV foam, Dow Corning "Fire 5to " or Pie Shields, Inc., be of the same material. <br /> HVAC UNITS smoke developed under 50. Thickness, density and p P tenant. MIM <br /> ROOFTOP AIR GONDITIONIN6 UNITS (EXI5TIN6 EQUIPMENT) p partitionsuse mineral or glass fiber insulation. MM <br /> "R" value shall be per code. Insulation shall be model WFB, DFB, or QDFB. For non-rated walls and D. NATURAL 6A5 PIPING D. NATURAL 6A5 <br /> , <br /> fastened to ductwork per manufacturer's instructions 1. ScheduleDt�IOLITION 40, A5TM A120, black iron pipe 1. Install natural gas piping as indicated ARCHITECTS, INC. <br /> A. Rooftop units shall be furnished complete with and 5MAGNA standards. Round branch ductwork with 150 Ib. black malleable threaded or on drawin s and Qs required b <br /> �� DEMOLITION g q, y A. Any existing plumbing equipment, fixtures, <br /> casing, refrigeration system, heating section shall be insulated with 1 thick fiberglass sleeve socket welded fittings. local codes. floor drains, piping, refrigerant lines, etc. 17710 Detroit Avenue <br /> (as scheduled on drawinc{s), fans, motors and drives, with foil jacket and all joints and terminations A. Any existing HVAC equipment, ductwork, diffusers, grilles, EXECUTION 2. Install shutoff valves close to fixture that are not indicated to be reused or <br /> filters, automatic controls, and options and accessories sealed with foil duct tape. Lakewood, Ohio 44107 <br /> as scheduled on drawin s. If scheduled accessories are piping, refrigerant lines, etc. that are not indicated to be and appliance connections and ahead abandon in lace, shall be disconnected <br /> g A, 6 �Ig Pp p Phone (216) 521-5134 <br /> not installed contractor shall field install them. Verify on site. reused or abandon in place, shall be disconnected from all union and dirt leg at rooftop units. from all utilities back to the source and Fax (216)521-4824 <br /> B. Temperature controls. EXECUTION utilities back to the source and removed completely. Verify on 1. Contractor shall examine the premises and 3. Unions shall be installed on both sides removed completely. Verify on site. Gap www.adaarchitects.cc <br /> 1. Rooftop units shall be furnished with factory site. Gap or terminate existing utility to assure proper working satisfy himself of existing conditions under of all equipment and where required to or terminate existing utility to assure <br /> installed and tested components to provide two A. All ductwork transitions shall be (FOT) "Flat on order. which he will be obligated to operate in facilitate removal of equipment. proper working order. <br /> stades of cooling, two stagesof heating (where Top" unless otherwise specified on plan. All duct performing his part of the work that in any <br /> applicable), anti-recycle timer, five (5) minute dimensions listed are inner air stream dimensions. manner affect the work under the contract. 4. Provide gas pressure regulating valves <br /> compressor staging relay, and other items as The contractor shall cooperate with other with turned down vents at all gas appliances <br /> scheduled on drawings. B. All ductwork shall be routed above the suspended trades so that the installation of all equipment <br /> when distribution pressure is greater pVEsS <br /> ceiling space unless otherwise noted on the plans. may be properly coordinated. than l" W.G. P� <br /> All ductwork shall be suspended according to -1 N!. ST, <br /> the latest edition of the SMAGNA HVAC Duct 2. All equipment furnished shall fit the space 5. Provide gas main shutoff valve <br /> Gonstruction Standards for metal and flexible available, with connection, etc. in the required with lever type handle placed on M33481 <br /> ductwork. locations and with adequate space for operation on house side of meter. <br /> G. All outside air intakes shall be a minimum of lo'-O" and service. 6. Paint all exterior piping including <br /> away from exhaust discharge openings and 3. All piping, except fixture supplies, shall be piping installed on roof with two coats <br /> plumbing Vent stocks. <br /> concealed, cut accurately to exact measurements or rust inhibiting exterior paint. <br /> ofo-o.s23a. astA ES <br /> taken at the building and worked carefully into 1. Support piping on roof per instruction -� u" _ SnTn st AGES <br /> D. Provide UL approved fire dampers for all place without forcing or springing. Ghonges in of Landlord's roofing contractor to Date 2020-01. 8:48:1P 08110' <br /> direction of all piping shall be made with fittings. 1/16/2020 <br /> penetrations through fire rated walls, partitions, p�p• g 9 maintain roof WARRANTY. <br /> ceilings, and floors. Install fire dampers as per Changes in pipe size shall be made with reducing fittings. <br /> manufacturer's directions and as per UL <br /> guidelines. <br /> a <br /> CO <br /> LCD <br /> O <br /> O O <br /> ti <br /> 0 <br /> O LL_ <br /> 00 <br /> O <br /> 00D <br /> J <br /> Q <br /> QW0 <br /> CD <br /> rn <br /> J U <br /> W <br /> �� O z <br /> � O <br /> JIle <br /> o < <br /> Q ' v <br /> N Ld >L <br /> w <br /> n J <br /> LU <br /> Q � � <br /> O <br /> a O M <br /> U N w <br /> M <br /> CU <br /> O � <br /> U � <br /> Q O 7D <br /> sheet <br /> li"1114�Fa <br />