<br /> 5EGTION 16010 - 6ENERAL PROV151ON5 IN5TALLATION/APPLIGATION/PERFORMANGE/ERECTION F. Fuses: Furnish and install all fuses. Fuses shall be Bussmann or as specified on the Drawings. DISTRIBUTION PANEL BOARDS go y
<br /> A. Application, Installation: I. Provide fuses at all locations shown on the drawings or required for supplemental protection. Where A. Panel board shall be enclosed in steel cabinet of rigidity and gauge of steel per UL Standard #50 for ! �t c
<br /> RELATED DOCUMENTS amp rating of protective device is 600 amps or less, provide Bussmann low-peak current limiting fuses, cabinets. All panel boards shall be provided with door ToGkri, all keyed alike. o LOLL
<br /> 1. No measurements of a Drawing by scale shall be used as a dimension to work by. The drawings are not class J for service switches. class RKI on panels;RK5 (with dual element Fusetron up to 100 A;above
<br /> A. The General Gonditions, Supplementary Conditions, and General Requirements apply to the Work specified intended to show complete or accurate details of the buildingg in every respect. Exact locations and 100 A dual element Low Peak), having an interrupting rating of 200,000 amps RM5, unless noted bol B. Bus structure shall be copper or aluminum. 6 N
<br /> in this Section. relations are to be defined in the field and shall be satisfactory to the Architect/Engineer. This amps, provide Bussmann "Limitron" fuses, Glass "L" having an interrupting rate of 200,000 amps RMS Q U C � (3, m
<br /> Contractor shall take all field measurements and shall be responsible therefore. unless noted otherwise. Provide similar type, "Hi-Gap" fuses where shown. G. Short circuit current rating shall be equal to or greciter than the available short circuit at the panel board, = o va , - Z
<br /> and as called for on plans, but not less than 65,000 amperes symmetrical, where available fault can not be 0 L 2 6 +
<br /> DESCRIPTION: 2. Compare Drawings and Specifications, checking all measurements and determine intent of Contract 6. Outlet, Pull and Junction Boxes: Outlet, pull and junction boxes shall be 12 auge, or heavier, steel, with determined. Where allowed by authority having jurisdiction series rating may be applied.
<br /> Documents. Discrepancies shall be brought to fhe Architect/Engineer ,s attention for interpretation prior removable knockouts. Boxes shall be as manufactured byy Appleton, Steel �it or Raco. Size boxes as E r 0. 3
<br /> A. This Section defines the General Provisions which are common to all Sections of Division 16. to any installation. required for the intended duty, minimum size as required by the applicable Na�Ional Electrical Gode. D. Panel boards shall be as shown on the drawings with main lugs, main breakers, branch bolt-on breakers,
<br /> spares and spaces as scheduled. Provide 6. .1. breakers as required. Panel boards to match equipment c CO = Z 0
<br /> B. The information in the Specifications and the Plan Drawings are basic facts to follow in determining a 3. The right is reserved to make any reasonable change in location of outlets and equipment prior to H. Switches: supplied by tenant's vender o o 2 a E
<br /> reasonable and competitive price for the disciplines intended. The Drawings and Specifications o not roughing-in without involving additional expenses. Any chane from the Electrical Drawings as is
<br /> necessaril indicate or describe each item necessary for the full performance and completion of the necessar to make the work of this Contractor conform to building as constructed and to fit the 1. Wall switches shall be located as indicated on the Drawin s, arran ed sin I or in an s and at the E. Provide a typewritten panel directory for each panel, identifying the use of each circuit including any
<br /> y y P p 9 9 9y. . gongs
<br /> particular work the contractor may be biddinq. These documents provide the general intent necessary to work of o her trades shall be included in Contractors Contract and installed without extra cost. height specified or indicated and shall have proper covers with finishes specified herein. Switches shall existing circuits which remain.
<br /> inform the contractor of the tenant's desire For the systems required for Electrical. Contractor shall visit be as follows unless otherwise called for on Drawings or hereinafter specified.
<br /> the site prior to bidding to become familiar with the existing conditions under which the work shall be 4. Perform all work in compliance with all applicable safety regulations including 05HA regulations.
<br /> performed. Failure to inspect the site will not be considered justification for an adjustment in contract 2. Switches, 20 amperes, 120/277 volt specification grade, quiet rated: DRY TYPE TRANSFORMER
<br /> price or failure to perform the work under this contract. 5. Coordinate all work with other trades prior to any installation. bb�� Leviton, Eagle, HUBBELL, or Pass $ 5eymour. Switch shall be
<br /> white. A. Step down transformers shall be NEMA TP-1 energy efficient ventilated, as indicated on plans, typically
<br /> G. Work Included: 6. Provide code approved clearances around electrical equipment. 4bOV delta primary to 120/208v, 33/8, 4 wire NYE secondary, 60 hertz, NEMA I enclosure.
<br /> I. Receptacles:
<br /> 1. All electrical work herein specified and/or shown on drawings unless noted otherwise. 7. Coordinate staging of material with building management representative at time of bidding. B. Wiring Aluminum 220/8 c. insulation system, 150/8 rise.
<br /> I. Receptacle shall be located as shown on the Drawings and at the heights specified or indicated. o
<br /> 2. Work bu the Utility Company for which there is a backcharge. All electrical back charges to be included FIELD QUALITY CONTROL Receptacle and power outlets shall be of the grounding type specification grade and as manufactured G. Nominal 5% Impedance Q
<br /> under this Division 16 Contract. by HUBBELL, General Electric, Pass � Seymour, Eagle or eviton. Receptacle shall be White.
<br /> A. Testing: D. Taps (2) 2-1/2% above and below normal. N
<br /> 3. Installation shall be complete from the location designated bbq� the Electrical Utility Gompany as the point g: J. Switch and Receptacle Plates:
<br /> of service connection, to the final connection of motors, fixt=ures, devices, apparatus or pieces of E. 75 KVA rated unless otherwise noted. �
<br /> equipment, unless modified by Drawings or these Specifications. I. After wires are in place and connected to devices and equipment, the system shall be tested for I. Plates in finished areas for switches and receptacles shall be white. Identify all dedicated circuits with
<br /> shorts and grounds. All hot wires, if shorted or grounded, s all be removed and replaced. a laser printed adhesive label indicating panel and circuit number.
<br /> 4. The Electrical Drawings and specifications shall be understood to cover complete operating systems. CONNECTIONS
<br /> 2. All meters, instruments, cable connections equipment, and apparatus necessary for making all tests, shall K. Contractor shall provide all elbows, connectors, etc., and install outlets complete.
<br /> 5. The Drawings and Specifications are to be taken together. Work specified and not shown, or work be furnished by this Gontractor at his own expense. A. All main feeder connections shall be made with soder-less connectors, boltedtype. Smaller wire spplives
<br /> shown and not specified shall be performed or furnished as though mentioned in both Drawings and L. Lighting and Appliance Panel boards: shall be made with pressure type connectors - Minnesota Mining "5KOTGHLOGKS" or Ideal "WIN6NUT5"
<br /> Specifications. ADJUST AND GLEAN
<br /> I. Panels shall be type indicated on the Drawings, with main lugs, main breakers, branch breakers, spares
<br /> 6. Minor items and accessories reasonably inferred as necessary to complete such s ss temshall be and spaces as scheduled. INSTALLATION
<br /> included. All work � materials necessary for proper operation of any system, shah be provided by this A. Gleaning Equipment, Completed Work and Premises: After the completion of all installations, each system rn
<br /> Contractor. shall be thoroucihly cleaned to remove all paint, oil and other foreign material. Contractor shall also clean 2. Panels shall comply with U.S. Federal Specification WP115o, Type I, Glass 1. A. System 6rounding
<br /> all foreign pain , grease, oil, dirt, labels and stickers, etc., from all -fixtures, equipment, etc. The Contractor g
<br /> D. Description of System: shall remove all rubbish, debris, etc., accumulated from his operations from the premises. 3. Bus structure shall be copper or aluminum. I. Shall be in strict accordance with the National Electrical Gode, Local 6overninq Authorities and in cu
<br /> accordance with the recommendations of the Utility Company. See details on drawings for additional E
<br /> I. Complete power wiring to main disconnect switch, panels, motorized equipment, motors, equipment APPROVALS 4. All circuit breakers shall be bolt-on type. grounding requirement.
<br /> cabinets, and miscellaneous outlets.
<br /> A. Obtain all permits and approvals from the governing bodies which have jurisdiction over this project. 5. The Gontractor shall balance all circuits. All conductors shall be continuous without splicing from last 2. All equipment grounding conductors and grounding electrodes shall be copper and comply with local and
<br /> 2. General wiring for power, lighting, and miscellaneous systems. P PP 9 9 j P j outlet to their terminals in cabinet. national code.
<br /> 3. Materials and equipment for electrical work. IDENTIFICATION AND TAGGING 6. Contractor shall provide a directory of circuits for cabinet. Directory shall be typewritten designating B. Electrical Service:
<br /> room or equipment and circuit numbers, include any existing circuits which remain.
<br /> 4. Electric service and distribution. 1. The Utility Company will furnish, install and connect all primary service conductors.
<br /> A. Identification of distribution switches or circuit breakers individualI mounted or of panel boards shall be 7. Where 2 or 3 pole breaker units are called for, they shall be on unit with common trip and not single
<br /> 5. Motor and equipment wirin , including starters, safety switches 4 control Hiring. byy means of engraved lamacoid nameplates permanently fastened on the front face of the housing, showing ole units with handle ties. Capacity of main busses shall be as shown on the Drawin s. 2. This contractor shall contact the Utility Company and Landlord to obtain all information necessary for the
<br /> g g y g 1/4 high white lettering on a black background. Provide all panel boards with typewritten directory. p p y g work, incorporate their instructions into the work, and obtain their approval of all work and material.
<br /> 6. General and emergency lighting and power systems. 8. Panel boards shall be manufactured to match equipment supplied by tenant's vender. Include all costs in base bid.
<br /> -f. Gontactors for lighting and sign control systems. 5LEEVE5 M. Outside Delivery Door Bell: A Bell s stem shall be furnished and installed by the contractor includin 24 Q
<br /> b
<br /> Vac transformer and wire. Bell shalt e Edwards Gat. #55-665. Push-button shall be Edwards Gat 852
<br /> 8. Telephone back boxes and empty conduit. A. Provide sleeves in walls and floor slabs for the passagle of all conduits, pipes and ducts installed. with stainless steel plate. SECTION 16500 - LI6HTIN6 SYSTEMS AND GONTROL5 N
<br /> Sleeves shall be set in place in sufficient time, ahead o concrete work, so as not to delay that work. a,
<br /> Cl. Arrange for sources of temporary construction services. Such services shall be nominally 120/208 volt, DESCRIPTION
<br /> 3 phase, 4 wire from which a complete system of temporary power and lighting shall be installed for all GUTTING AND PATCHING A.A. Work Included:
<br /> construction needs and as required bu the occupational safety and health departments, (05HA).
<br /> Temporary services shall be removed'upon completion of work. A. CONDUIT:
<br /> A. Perform all cutting and patching required to complete the Work, except where specificallyshown on the I. Contractor to install lighting fixtures with lamps, hangers and controls as shown on Drawings and Lighting >,
<br /> 10.Computer system empty conduit raceway. Architectural or Structural Drawings. Patching shall match existing and shall be coordinaed with tenants I. Installation - All conduit shall be sized in accordance with the applicable N.E.G. Fixture Schedules. Tenant will provide all lighting fixtures, lamps, spacers, fixture trim and accessories as
<br /> representative. required for a complete secure and working in allation.
<br /> 11. Wiring of power connections to equipment furnished and installed by others. 2. Conduit to be run exposed in unfinished areas such as mechanical and electrical room used as electrical B. Requirements
<br /> DEMOLITION closets. All other conduit shall be concealed. q i
<br /> 12. Gutting, patchln , excavation and back fill, and concrete work required to complete the work of this I. All lamps shall be T-8 LED 4K retrofit 4' Ion type lamps, dual rated for 120v or 277v operation. All C°
<br /> section. Back ill shall be compacted to 95% of standard compaction. All existing surfaces shall be 3. All conduit and wiring shall be concealed wherever possible. Where conduit and wire cannot be p yp p p v>
<br /> patched or replaced to "Like New" conditions. A. Any existing electrical equipment, lighting fixtures, junction boxes, receptacles, etc. that are not indicated to concealed, obtain direction from the Architect. No surface mounted conduit, wire mold or power poles will lamps shall be as Indicated on the lighting fixture schedule. o
<br /> be reused or abandon in place, sha l be disconnec ed from all utilities back to the source and removed be acceptable unless specifically indicated on the drawings. v> Y
<br /> 13. All other equipment, material, devices, accessories required and/or shown on the drawings. completely. Verify on site. Gap or terminate existing utility as required to assure proper working order. 2. All lamp ballasts drivers shall be electronic type integral to lamp fixture housing. > CU
<br /> 4. All exposed conduits shall be run parallel to or at riqqht angles to structural members. Carefully L I=
<br /> E. Related work to be completed by others: coordinate exact routing with the Architect's represen-tative, in the field, prior to any installation. 3. Provide all exit and emergency lighting as required by applicable code(s).
<br /> 1. Computer system wirin 5. All conduit shall be Inde endentIq su orted from the building structure. Conduit shall not be suspended 4. All lighting circuit shall have dedicated neutral.
<br /> p y g' 5EGTION 16010 - BA51G MATERIALS AND METHODS from ventilating ducts, mechanical piping, suspended ceiling grids, or their hangers. p CN C-0
<br /> o o
<br /> 2. Television system wiring. 5. Emergency lighting shall be individual unit equipment in accordance with NEG 702.12.6. o
<br /> MATERIALS 6. All conduit shall be mechanically and electrically continuous from outlet to outlet and box to box. Secure o co
<br /> 3. Alarm System conduit fittings at all enclosures and junctions. 6. Battery Inverter Unit (BIV) shall be UL listed, stand-alone pure she wave output inverter dedicated to 0
<br /> A. CONDUIT: one branch circuit and connected to LED lamps indicated on plans. Unit shall be in accordance with NEG o
<br /> F. Definitions - As used within the Contract Document: B. Types of Conduit: 702.12.A 4 G.
<br /> 1. "Circuitry" or "Wiring" shall mean any electric work. I. Electrical Metallic Tubing: EMT, "Thinwall" conduit shall in general be utilized where permitted by Gode
<br /> except where described herein. Minimum size conduit shall be 1/2", unless specifically noted otherwise. 1. Conduit, within building confines run in concrete slabs, within outside masonry walls, in earth fill, and 7. Contractor shall connect LED strip fixture 4-wire harness for operation of each lamp as individually
<br /> 2. "Package Unit" shall mean an item of equipment having one or more motors or other electric energy exposed in wet areas shall bealvanized steel heavy wall or IMG. Gouplings for conduit run in poured controlled and as indicated on plans. Internal modification of emergency strip fixtures may be required.
<br /> a
<br /> consuming elements inte rally factory mounted on single base, complete with all associated control 2. Heavy-wall steel conduit and I.M.G. shall be either hot dipped galvanized or sherarclizecl. concrete shall be concrete tight.
<br /> devices and interconnecting wiring. ; c
<br /> 3. Flexible conduit shall be Greenfield type except, where exposed to oil, grease, or water-conduit shall 2. Conduit run exposed or outdoors shall be galvanized steel heavy wall or IMG with watertight fittings and (D � c)
<br /> 6. Permits: be 5ealtite. boxes. SECTION 16700 - COMMUNICATIONS o C
<br /> 1. Obtain all permits and pay all fees required for the complete electrical system. _0 Q- _0 _0
<br /> 4. Plastic conduit shall be PVG Schedule 40. 3. Conduit run in dry areas within building confines shall be EMT, except where specifically noted otherwise DESCRIPTION
<br /> or prohibited bq local codes. Dry areas are inside partitions, ceiling cavities, above grade slabs, and
<br /> QUALITY A550RANGE 5. Conduit shall be as manufactured by Allied, Triangle or approved equal. areas not sub6ct to damage. A. Work Included: 1. Empty backboxes and conduit shall be furnished and installed by Contractor.
<br /> A. Qualifications: 6. Provide expansion fittings for conduits crossing expansion joints. 4. Conduit with trade sizes over I-1/2" and/or exposed in mechanical rooms shall be galvanized steel heavy
<br /> wall or IMG. TELEPHONE SYSTEM/COMPUTER SYSTEM
<br /> 1. Materials and equipment shall be new and shall conform to N.E.M.A. and Underwriters Laboratories (UL) 7. Conduit Fittings: ll I
<br /> standards in every case, where such standard has been established. All equipment of similar type shall 5. Conduits run under floor slabs and in contact with earth may be PVG Schedule 40. A. Telephone System 6roundinga Conductors: Furnish #6 AWG, solid copper rounding conductor from I I I
<br /> be of the same manufacturer. o. Rigid: Threaded. telephone service equipmentto electrical service grounding electrode system.
<br /> b. Thin-Wall: Compression T pe. G. Provide full size insulated (green) ground wire in all conduits. Where the drawings do not identifythe size of 111 1
<br /> B. Requirements of Regulatory Agencies: c. Flexible: Connectors shah be compatible with flexible conduit used. the equipment ground wire,it shall be sized per NEG. Provide bare ground wire in all PVG concluit runs. B. Telephone/computer Gonduit System: Furnish as indicated on the Drawings, including the following: All ',II 111L
<br /> I. All electrical work shall be in accordance with the National Electrical Gode (N.E.G.), current edition, and 8. Provide bushing and lock nuts for all conduit entries to boxes. D. Boxes, outlets and cabinets: 1. Telephone service conduits for underground service. ARCHITECTS, INC.
<br /> any amendments to the National Electrical Gode made by the local Gode Officials. Coordinate exact B. Type MG "Metal Glad" Copper Gable ma be used for interior applications where permitted b the local 2. Other conduits as indicated on the Drawin s. Furnish #14 AW6 soft iron pull wire or heavynylon cord in
<br /> code requirements and local amendments with AHJ prior to any installation. authority in accordance wpth the latest NG article 330 AND withphe followin provisions: y I. Install equipment and materials in a neat and workmanlike manner and align, level and adjust for each conduit for pulling the telephone cable to each termination point. y
<br /> y g P satisfactory operation. Install equipment so that all parts are easily accessible for inspection, P 9 P P 17710 Detroit Avenue
<br /> 2. Where applicable, all fixtures, equipment and materials shall be as approved or listed by the following „ . operation, maintenance and repair. Provide the design, fabrication, and erection of supplementary Lakewood, Ohio 44107
<br /> agencies: 1. MG Gable shall be equipped with green insulated grounding conductor. Per NEG table 250.12 structural framing required for attachment of hangers or other devices supporting electrical equipment. 3. Outlet boxes with a 3/4 conduit stubbed into accessible ceiling space with pullwire for cabling bq others. Phone 216 521-5134
<br /> R qidly mount all boxes and provide with suitable screw fastened covers. Plug open knockouts or holes Provide separate dedicated conduits for P.0.5. lines. (Do not share with other telephone or dao lines.) ( )
<br /> a. Factory Mutual Laboratories. 2. MG Gable shall be installed in a professional manner, concealed, dressed along structural members and in boxes with suitable blanking devices. Fax (216) 521-4824
<br /> b. Notiona� Fire Protection Association. supported as required at proper intervals. G. No electrical conduits or power wiring shall pass over the telecommunications closet and panels, except for www.adaarchitects.cc
<br /> c. Underwriters Laboratories, Inc. (UL) 2. Center all outlets with regard to paneling, furrinq, and trim. Symmetrically arrange outlets in the room. telecommunications room right fixtures.
<br /> d. National Electrical Manufacturers Association (NEMA) 3. MG Gable conductor shall be color coded (black, blue, red for 120/208V) (brown, orange, yellow for Satisfactorily correct outlets improper located"or installed. Repair or replace damaged finishes. Set
<br /> e. Americans with Disabilities Act (ADA) 2-77/28OV) system. outlets plumb and extend to the finished surface of the wall, ceiling or floor without projecting beyond
<br /> G. Allowable Tolerances: 4. MG Gable shall not be used for 16 circuits.
<br /> same. INSTALLATION
<br /> E. Fire and Smoke Partition Penetrations: A. Furnish and install conduit syystem as shown. Cabling and final connection to be by the tenant contractor.
<br /> 1. Review Architectural, Structural and Mechanical Drawings for all dimensions, locations, partitions and 5. MG Gable shall not be used for feeders. The system shall consist of telephone/data outlets in locations as indicated, branch conduits, and all
<br /> walls, structural details, and location of mechanical pipes and ducts so that the electrical installation 1. The Gontractor shall familiarize himself with all fire rated construction and install his work so as to accessories required by the telephone company for complete installation. pF
<br /> shall be in coordination with that of the other trades. 6. MG Gable shall not enter panel boards or service equipment enclosures. Provide j-boxes, wireways, etc.. maintain the integrity of the fire code rating. Maintain rating of fire rated and smoke rated construction. RO�y,
<br /> for all branch extensions from point of home run. Sleeves shall be steel or pre-manufactured sleeves similar to Pipe Shields, Inc., for bare pipe through "gyp
<br /> 2. Exact location and electrical requirements of equipment furnished by other trades and wired by this G. Wires and Gables: fire walls and floors, model WFB, DFB or QDFB. For plastic pipe, use type WFB with one Inch thick
<br /> Contractor shall be obtained from the Drawings of the other trades. calcium silicate insulation encased in metal sleeve extension two feet either side of fire rated walls or
<br /> I. Unless specifically noted otherwise, all wirin shall be installed in conduit. floor. Seal annular space around conduits. For fire and smoke rated floors, walls and partitions, use UL
<br /> p y 9 listed material that maintains fire rated wall and floor integrity, similar to RTV foam, Dow Corning "Fire
<br /> APPROVAL DRAWINGS Stop" or Pipe Shields, Inc., model WFB, DFB, or QDFB. For non-rated walls and partitions, use mineral or
<br /> 2. All wire shall be type THW or THWN copper unless otherwise noted on plans. glass fiber insulation.
<br /> A. Prepare and submit for approval such additional electrical drawings, diagrams, and specifications as are
<br /> required by: 3. Wire smaller than #8 shall be solid: #8 and larger, stranded. DN CN-Jay ORoh 60225C60009A ,,
<br /> 0-C C-U1
<br /> I. Local Fire Prevention Bureau 4. Gable and wire shall be as manufactured by Triangle, General Gable, Southwire or Carol. SECTION 16400 - 5ERVIGE AND DISTRIBUTION Date:2620.01.15 r20i24-0
<br /> nn
<br /> 2. Local Building Department - Electrical Inspection Section 5. Voltage drop chart to be used for conductor sizing on derawings. Increase wire sizby number of DESCRIPTION 15VL V
<br /> standard copper sizes to compensate for volt drop. Increase conduit andround wire sizes accordingly
<br /> 3. Local Utility Gompanles as per NEG. Gontact engineer of record for assistance if conductor length-from the source to load A. Work Included: (�
<br /> exceeds maximums shown. ll C'
<br /> I. Current transformers cabinet.
<br /> COORDINATION AND COOPERATION
<br /> VOLTAGE DROP GORREGTION FAGTOR5 2. Main switchboard. a
<br /> A. The contractor shall examine the premises and satisfy himself of existing conditions under which he will be
<br /> obli cited to operate in performing his part of the work or that will in any manner affect the work under the CIRCUIT VOLT5/PH CIRCUIT LENGTH FT. UP51ZE 3. A complete distribution system. C-0
<br /> contract. The Gontractor shall cooperate with other trades so that the installation of all equipment may be 120/I 60-100 1 LO
<br /> properly coordinated. Ito/l 100-150 2 4. System grounding per local codes.
<br /> CD
<br /> 120/1 150-250 3
<br /> B. All equipment furnished shall fit the space available, with connection, etc., in the required locations and with 5. All work and charges required by the local utility company. �
<br /> adequate space for o eratin and servicing The drawin s are gqenerallyy diagrammatic and indicate the 208/3 OR 277/1 120-200 I 0 ti
<br /> manner and method of the installation while the specifications andfixturelist denote the type and quality of 208/3 OR 277/1 200-300 2 6. Dry type step down transformer.
<br /> material and workmanship to be used. Where a conflict exists between the drawings and the specifications, 208/3 OR 277/1 300-500 3 0
<br /> the Contractor shall promptly notify the Architect whose decision shall be final. No allowance will be made 480/3 280-450 1 B. Services: OQ
<br /> subsequently in this connection on behalf of the Contractor after award of the contract. 480/3 450-725 200
<br /> I. Incoming electrical service is as indicated on drawings. M
<br /> 00
<br /> GUARANTEE D. Color Coding: Color coding shall be used throughout the entire electrical system. Provide industr standard y.
<br /> A. Provide one �{{ear qquarantee for all fixtures, equipment, materials and workmanship, upon final acceptance by color codin for the voltages involved. Gontrol wiring shall be numbered for easy identification oT 2. Provide exterior main service entrance rated switch where required � local authority.terminal 3. Provide concrete encased service feeders where installed in PVC, schedule 40 conduit. Undergqround
<br /> tenant. Any defective material or faulty workmanship shall be replaced without cost to tenant. points. Number terminal blocks accordingly. service feeders shall be a minimum of 36 below grade. Install warnin tape above conduit roul;e 12
<br /> below grade. Transition below grade to galvanized steel conduit with thread fillings where underground
<br /> E. Disconnect Switches: conduit is to be exposed above grade.
<br /> PROTECTION I. Switches shall meet NEMA enclosed switch standards K51, current edition. Switches shall be quick-make, J
<br /> A. The contractor shall be responsible for protecting all, both, new and existingq equipment and systems against quick-break so that operation of the contacts shall not be capable, during normal operation of the EQUIPMENT Q
<br /> harmful exposure, or accumulation of dust/moisture, flooding, corrosion, or otFier forms of damage. Glean switch, of being restrained by the operating handle after the opening or closing of the contacts has W o
<br /> and restore damaged finishes and equipment to place installation in a like-new condition. started. A. Main switchboard shall be service entrance rated and front accessible with removable screw - on cover LO
<br /> plates. Grounding and metering shall comply with the local utility company and all local code requirements. ri J a,
<br /> B. Contractor shall determine operational condition of existing equipment to be used and maintained for this 2. All safety switches shall be heavy{ duty of voltage matchin equipment served. NEMA I for indoor use I u�L J Q W
<br /> project prior to commencin work. Contractor shall adjust, repair or replace non functional equipment. All and NEMA 3R for outdoor use. wits es shall be as manu actured by Eaton, General Electric, Square D, w U <
<br /> q J
<br /> work shall maintain existing tJL listing and labeling requirements. Contact and report all unforeseen or Siemens. = z J �,n
<br /> conditions for appropriate directions. nnU) O Z
<br /> I �I�uI J Y Qo
<br /> JO J <
<br /> U) 7V
<br /> J Q W
<br /> a J w W
<br /> J
<br /> Q v
<br /> C _ < lY
<br /> J J
<br /> a O M J W
<br /> co
<br /> M
<br /> UQw
<br /> OU �
<br /> NOTE: °' cu
<br /> cu
<br /> PRANIN65 AND SPECIFICATIONS ARE TO BE CONSIDERED AS 5UPPLEMENTIN6 EACH
<br /> OTHER. WORK SPECIFIED BUT NOT SHOWN ON DRAWIN65, OR 5140WN ON DRANIN65 BUT
<br /> NOT 5PEGIFIED, SHALL BE PERFORMED OR FURN15HED A5 THOU6H MENTIONED IN BOTH
<br /> SPECIFICATIONS AND DRAWIN65. IF NOT OTHERN15E DIREGTED, INSTALLATION OF ALL sheet
<br /> 5Y5TEM5 AND EQUIPMENT SHALL BE IN ACCORDANCE WITH APPLICABLE CODES AND IN
<br /> ACCORDANCE WITH MANUFAGTURER'5 INSTALLATION INSTRUCTIONS. WHERE WORK
<br /> DESCRIBED IN THE 5PECIFICATION5 15 IN CONFLICT WITH THE WORK 5HOWN ON THE
<br /> DRAWIN65, THE CONTRACTOR SHALL SUPPLY THE 6REATER QUANTITY, QUALITY AND
<br /> G05T VIA THE BID AND CONTACT THE EN61NEER FOR CLARIFICATION ON DIRECTION
<br /> PRIOR TO INSTALLATION. E&