Laserfiche WebLink
Timing : Prior to approval of Final Map . <br /> NOISE <br /> r . Outdoor Noise Levels : Best available noise reduction measures shall be implemented by the <br /> applicant to reduce noise levels in primary outdoor use areas ( backyards ) of new residential <br /> development to an Ldn of 60 dB . <br /> Timing : Inclusion of note on the Final map approved by CDD prior to Final Map approval , and- <br /> inclusion of note on deed prior to issuance of building permits . <br /> s . Interior Noise Levels : Interior noise levels for housing proposed to be located in areas exposed -to an <br /> exterior noise level of an Ldn above 60 dB shall be maintained at or below an Ldn of 45 dB . [SPIT <br /> Implementation Measure 11 . 2 . 1 (4 )] <br /> Timing : Compliance verified prior to the issuance of building permits . <br /> t . NOISE WALL : A six-foot noise wall made of concrete or masonry block is required between the <br /> residences and connect to each residence ( along the western facades ) of the proposed lots facing <br /> Central Parkway and the wall shall be included in the improvement plans ( Figure 1 . , Noise <br /> Measurement Locations , Env . Noise Analysis July 16 , 2020 ) ( Development Title Section 9- 1150 . 10 ) <br /> Timing : Improvement plans approved by CDD and MHCSD prior to Final map approval . <br /> u . Construction Noise : The following measure shall be implemented during construction : <br /> Construction shall be restricted to the hours of 6 : 00 AM to 8 : 00 PM on weekdays . Extended hours <br /> which may include Saturdays and Sundays may be allowed through prior notice to adjacent residents <br /> and landowners , and prior approval of the MHCSD for infrastructure construction and CDD for <br /> building permits . <br /> All internal combustion engines shall - be equipped with exhaust mufflers that are in good condition <br /> and appropriate for the equipment. <br /> Timing : Inclusion of the above measures as notes on Improvement Plans approved by CDD <br /> and MHCSD prior to Final Map approval . <br /> GEOLOGY AND SOILS <br /> v . Seismic Safety : The applicant shall comply with the applicable pro-visions of the MHCSD Emergency <br /> Preparedness Plan . <br /> Timing : Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps . [SPII- Implementation Measure 6 . 8 . 3 ( 1 ) ] <br /> w . Geotechnical Investigation Recommendations : The applicant shall follow the recommendations of the <br /> Geotechnical Update , Langston II , Mountain House , California , prepared in June 17 , 2020 by ENGEO <br /> Inc . <br /> Timing : Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps , and the incorporation of all recommendations of the geotechnical <br /> engineering study into site preparation and construction of each dwelling prior to approval of <br /> building permits . [SP II Implementation Measure 6 . 8 . 3 ( 2 ) ; San Joaquin County Development <br /> Title , Chapter 9=905] <br /> PA-2000126 — Conditions of Approval 4 <br />