Laserfiche WebLink
Map ID MAP FINDINGS <br /> Direction <br /> Distance EDR ID Number <br /> Elevation Site Database(s) EPA ID Number <br /> PROPOSED HANSEN ELEMENTARY SCHOOL(NEIGHBORHOOD C) (Continued) S117333356 <br /> Lead Agency: SMBRP <br /> Program Manager: Jose Luevano <br /> Supervisor: Jose Salcedo <br /> Division Branch: Northern California Schools&Santa Susana <br /> Assembly: 13 <br /> Senate: 05 <br /> Special Program: Not reported <br /> Restricted Use: NO <br /> Site Mgmt Req: NONE SPECIFIED <br /> Funding: Responsible Party <br /> Latitude: 37.76163 <br /> Longitude: -121.5524 <br /> APN: 292-020-02 <br /> Past Use: AGRICULTURAL-ROW CROPS <br /> Potential COC: Arsenic Chlordane DDD DDE DDT Lead Toxaphene <br /> Confirmed COC: 30001-NO 30004-NO 30006-NO 30007-NO 30008-NO 30013-NO 30023-NO No <br /> Contaminants found <br /> Potential Description: SOIL <br /> Alias Name: 292-020-02 <br /> Alias Type: APN <br /> Alias Name: 104731 <br /> Alias Type: Project Code(Site Code) <br /> Alias Name: 60002109 <br /> Alias Type: Envirostor ID Number <br /> Completed Info: <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Environmental Oversight Agreement Application <br /> Completed Date: 09/18/2014 <br /> Comments: Received EOP Application via email on 09/18/14. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Preliminary Endangerment Assessment Workplan <br /> Completed Date: 07/14/2016 <br /> Comments: Based on information provided during the PEA scoping meeting with the <br /> District and their consultant(Alex Dewitt of Condor),a PEA will not <br /> be required for this project. Instead an updated Phase I ESA will be <br /> prepared.As such there are no deliverables associated with this <br /> activity.The activity could not be deleted since a work request was <br /> issued. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Phase 1 <br /> Completed Date: 09/15/2016 <br /> Comments: On Sep 15,2016, DTSC concurred with the recommendation of the Phase <br /> I ESA and issued a'No Action'determination. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Environmental Oversight Agreement <br /> Completed Date: 07/06/2016 <br /> Comments: On Jul 6,2016, EOA was fully executed. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> TC06081256.2r Page 22 <br />