Laserfiche WebLink
5.7 Information on Selected Source Reduction Measures <br /> The Plan must identify each source reduction measure selected for implemen- <br /> tation as a result of the evaluation. The Plan should describe each selected <br /> measure in detail, using narratives, photographs, <br /> figures and/or data. The description of each se- <br /> lected measure should be in sufficient detail to <br /> convey an understanding that would allow other <br /> generators to transfer the measure to a site with 5PJz <br /> similar processes, operations or procedures. At Tip <br /> a minimum, the seven evaluation factors should <br /> be addressed in a narrative where appropriate. <br /> The Plan should also address the predicted ef- <br /> fect that selected measures would have on the <br /> = capacity and efficiency of related processes and <br /> _M operations. <br /> W If a generator considers information in the Plan a <br /> s trade secret or proprietary, the pages containing <br /> F_ <br /> Ln that information should be labeled accordingly. <br /> See Chapter 8 for more information on labeling <br /> and reporting trade secret information. <br /> s 5.8 Evaluate Multimedia Effects <br /> V <br /> SB 14 specifies that implemented source reduction measures can not merely <br /> transfer the waste load from one environmental medium (air, land, or water) to <br /> another. The Plan must include an evaluation and, to the extent practicable, a <br /> quantification of the effects ofthe chosen alternative on all three environmental <br /> media. <br /> 5.9 List Rejected Measures <br /> The Plan must include a list of source reduction measures that were rejected <br /> before undertaking the detailed evaluation. The rationale for their rejection <br /> must be stated. Also, if some waste streams were considered to not have viable <br /> source reduction alternatives, the Plan must include a brief description of the <br /> good-faith effort to identify source eduction alternatives. <br /> 5.10 Schedule Steps Toward Implementation <br /> The Plan must include a timetable for implementation of all selected source <br /> reduction measures. The timetable should include, at a minimum, starting and <br /> 42 <br />