Laserfiche WebLink
CLOSURE COST ESTIMATES Page 3 <br /> SIGMA 'CIRCUITS, INC . CIONFIDN T <br /> STOCKTON DIVISION / MAIN SITE <br /> Description Quan . UOM* COST/UOM* TOTAL <br /> A. Costs for In-House Treatment -- FTU #3 : SUBTOTALS: <br /> Waste in Containers 100 G $0.05 $5 <br /> Waste in Tanks 800 G $0. 05 $40 <br /> Time Required 4 H $12 . 50 $50 <br /> Rinse Water 1000 G $0 . 013 $13 <br /> Time Required 1 H $12 . 50 $13 $121 <br /> B. Costs for In-House Decontamination -- FTU #3 : <br /> Containers 1 H $12 . 50 $13 <br /> Tanks 16 H $200 <br /> Ancillary Eqt . 16 H $200 $413 <br /> C. Costs for Offsite Removal /Disposal -- FTU #3 : N/A <br /> D. Transportation Costs -- FTU #3 : N/A <br /> INTERIM TOTAL CLOSURE COSTS -- FTU #3 : $533 <br />