Laserfiche WebLink
f <br /> Recommended Practces for Installation of Underground Liquid Storage Systems <br /> Piping is tight. but any loss in gauge pressure tyhirh could cau ;c a release or pernut a rcicase to <br /> should he carelully imestigated . In general , test go undetected or uncontained , <br /> at the nianulaclureCs recommended ptessuies . In Some lield-installed cathodic protection xtill he <br /> lieu of specified pressures , adhere to the l'ollowing <br /> limited to piping and associated components that <br /> procedures and Table I -t -? : ore not protected by a f;icturyeinstallet] cathodic- <br /> I or lihcrglass %econdar% -containment piping that protection .% stent provided with the tank . Pip 'Intl <br /> operates at atmospheric pic %%ure and uses runt - and other components ma) lie electrica [ 13 isolated <br /> shell tenninafion fillings . test at 10 prig . If Ilex - from the tanks b% insulated flanges and hushinLTs , <br /> ihle teinimauon littimgs are used . test it j psits . In some installations . the tanks and piping ntay he <br /> • <br /> For Ilexrhlc secondary piping . test at prig , protected by a common cathodic• protection s % sicut . <br /> F- xpcct that a slight expan ; ion ul ' piping may 12 . 2 Applicability. These recontmendaiions are not <br /> occur tthitc the piping is under pressure • intended to tike the place of a detailed corrosion surxcy <br /> 11.2.2 Monitoring During Construction . Alier and a specihcull % engineered cathodic• proiection pleat , <br /> the initial lest . psi, ul' air presuur rosy he main These ware genral recomnnndations Ior routine instal , <br /> taitted in the secondary piping. Monitoring the air lotions liar tthich no specific Alam are arailahlr . 11 the <br /> pressure during suhscyucni Construction can pro- citrumsl .utrcs are unusual . either for the tank systern to <br /> t ide earl warning ol' piping damage . ll' dtunagc is he installed or the environment , consult a competent cor- <br /> suspected. retest the piping, rosittn engineer <br /> 11.2.3 Final Integrity Test for Secondary Pipe <br /> 12.3 FactoryInstalled Systems for Tanks . Handle all <br /> ing. [ uunrdiately before placing piping in .ret ire . components %% ith rare to prevent danra►ge during instal- <br /> rrpe;►I flu test procedure described in Section lation and backlilling . At the installation siteo inspect <br /> i 1 . 3 . 1 . ;caping any exposed jc» mus . Monitor the anodes , dielectric hushings . and coatings fur shipping <br /> pressure I'or I hour and imcstigate ails pressure and handling lamagr . Veril} the clecU' icaf continuity <br /> (otic . Aflcr testing is completed. loosen sand hark tuft. between the anodes and the lank . Repair damage it ) anode <br /> test tittincs lite systcru, larking continuous moot - connections war coatings according to the ntanul :► cturcr's <br /> toeing at each junction stump . For s� stcnts " here <br /> instructions . Do not reinow dielectric bushings 1 'ronl tank <br /> alt sumps are continuously monitored . leaning• openings. <br /> lest <br /> Fillings in place is ,in option . according to the peel- 12 ,4 Dielectric Coatings . Dielectric coating , isolate <br /> erence of the owner, the external stirl' ►ces of the tank and piping from the <br /> enVironnicnt and reduce current demand on the Cathodic- <br /> protection system throughout Ille Iife expectancy of <br /> the liyui (kstorage s) stem . I • acturt - ilist alled dielectric <br /> coatings nruy lie roakiar epoxies . enannl ; , lihergla, s- <br /> 12 . CATHODIC-PROTECTION reinforced plastic , or urethanes in liquid tonin . tape . or <br /> SYSTEMS extrusions . ( 'eating done under controlled conditions <br /> improves cltialitN control and ntinintiles detects . Limit <br /> field coaling to exposed threads . l'ittings . and arcus dant- <br /> 1.2.1 General Requirements . Metallic mderground aged tion handling and fabrication . <br /> storage tanks and product -pipe systems in contact tx ith <br /> , oil mtist he pro\ idea with calhodic protection . Tank and Comments <br /> pipe systcnts constructed ul' Small exPusc <br /> rorrusiun •retiistant nl;teria6 d surlaccs of coated structures ct ► r- <br /> do nut require additional cathodic protection . Cathodic rude rapidly, due to a high concentration of electivo- <br /> protectiun should lie installed in accordance %% ith the chernical activity. Cathodic protection is essential <br /> manufacturer ' % instructions . pleats . and specifications . In for protecting coating llatts tholidomst . <br /> the uhscnre cif , peril'ic plaits. the ti , llnaing procedures Selection ul a proper coating mateiial . preparation <br /> are ret:antnlended . al the surlare to he coated , and carr in application <br /> Comments are essential . Coatings tolls maintain high dielec • <br /> n'ic properties over the lilt• of' the system . ha\ e lo« <br /> • The "tank M stem " incladc; the lank . piping , and moisture absorption and transfer rates. and hm <br /> e che - <br /> relaled egUiptnent. the failure ttf any component of icall } resistant to the Stored Iit.Rlids . Field-applied <br /> JUL <br /> pei . o�g <br /> �� 6 2019 <br /> l= NVIRONMENTAL HEALTH <br />