Laserfiche WebLink
111111 1 111 a 1111111 111111i: 11 11 1111i 11111111111 111 : 11 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> ' If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels,' 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps, 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Site Address: CANEPAS CAR WASH 6230 PACIFIC AVENUE STOCKTON CA 55207 <br /> (ARROWS) <br /> Dratvl of piping <br /> eat of sunp and <br /> UDCs. No <br /> undseround <br /> drawing is <br /> 3s.Sa�A?� tt'e <br /> . . . _ cannot speculate <br /> . . . . . . blue prints. <br /> 2 3. <br /> _5 . 7. _ n3c 9 .. 19x 1 12. 1 '.. <br /> CID <br /> TUAT IEL <br /> H 1 . .4 . <br /> T T <br /> S - - x L . . . . . . . . .. <br /> sg P 8 ? <br /> to 91 <br /> F= FILLS . . . _ . . F P ) <br /> T = TL°RB NE O <br /> P=PROBE <br /> V = Vill TL �/�. �� . . <br /> = eek SENSOR - _ T O - <br /> LLeakDetector A \✓ <br /> Nf = NLtmtrap <br /> B = l Senior D <br /> Sm _ <br /> I e Sut Sere-or - - - - - - - - - - - P <br /> S = STP O <br /> C = Ftoata & chains . . . . . P <br /> E =E Stop <br /> - - - .. .PACIF?C AVE Is <br /> .Intv Item: underground rias are not vill.I Heto the certd{i-atg feciz imi are a <br /> profe=iondapfnionouLitandarecafshtforfrtformationalptopoas Drawing <br /> not to scala <br /> Date mag was drawn: 013118 <br /> Instructions <br /> If you already have a diagram that showsall required information. you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br /> shay thegeneral layout of tanks and piping. Clearly klentify Iocatans o? the following equipment, it Installed: monitor3psystem control panels; sensors monP•orng tank <br /> annular spaces, sumps. dispenser pans, spill containers, or other secondary containment areas; mechanicallor etec:ron;: line leak detectors; and indank liquid level <br /> probes (if used for leak detection}. In the space p.-cvded, note the date this SRe Plan was prepared. <br /> LEGEND <br />