Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Paye s of s) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,0 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps, 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Site Address_ CANEPAS CAO WASH 6290 PACIFIC AVENUE STOCKTON CA 05207 <br /> *PIPLXG } <br /> (.ERROR'S) <br /> Drawing of piping <br /> exit of sump and <br /> LTD C'3. N o <br /> Jmd= around <br /> dram is <br /> 4qKqwAP� we <br /> . . . . . . . . . c>anot speculate <br /> blue prints_ <br /> 2 3. r.1 5. . . 7. 9 .. 111 X . 12. <br /> WASH <br /> TUNNEL <br /> h 1 . .4 . <br /> •j• ; L <br /> L S <br /> 39 P 87 <br /> KE . . . . . . . - - . . . : : . t• 91 <br /> F= FILLS F <br /> T = TGRffiPtE . . _ . . . P <br /> P =PROBE . <br /> V = A•APOft n <br /> X = SU]IP SENSOR <br /> L =Leak Detector <br /> Jt =DI>nn-ay <br /> = enror D <br /> I O O _ <br /> a Stuartuart Sensor <br /> C STP <br /> E =F Stop <br /> _ .. . - - - - - - - <br /> PACIFIC AVE <br /> irvi[ant ratda.a�to[trdtkmare 6v;gtsc12ucianarea <br /> prgfestional apinion ontt- mrd are soletufor fitrormarimutlp[oporer. Dratrilog <br /> not to scale <br /> Date map was drawn: WWII? <br /> Instructions <br /> If you already have a diagram that showsall required information. you may include it rather than this page. with your Monitoring System Certification. On your site pian , <br /> show the general layout of tanks and picing. Clearly lien* locations ofthe following equipment, if installed: mimhorsgsystem wntroi panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary conta'.nment areas: mechanicalor eLcironic line leak detectors; and in-tank flquid level <br /> probes (if used for teak detecron). In the space. provided, note the date this She Plan was prepared. <br /> LEGEND <br />