My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:18:11 PM
Creation date
8/20/2020 3:15:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231289
PE
2361 - UST FACILITY
FACILITY_ID
FA0003847
FACILITY_NAME
NORCAL FUELS
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
3300 N WEST LN STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 7/2/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed., 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> sae address: RrESTLANE FUEL 3300 X%TSTLANI E STOCKMN CA 95204 <br /> =P1PLNG } KEY <br /> (ARRO\TS) A = ANNnAR <br /> DraNvineof F = FMLS <br /> piping exit of T = TL'RBLYE <br /> sump and UDC's. P = PROBE . - <br /> No underground V = VAPOR <br /> draningis K = SU\IPSENSOR <br /> 7CA&Btp. 1ve L = Leak Detector <br /> canaotspeculate 111 = X1&ntvav <br /> = mart Sesor <br /> I = Swart Sensor <br /> S = STP <br /> C = Floate & Ckaim <br /> E = E Stop <br /> PVVENTI <br /> • b <br /> . . . . TLS 350 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 87 91 C CTL TL <br /> . . . . . . . <br /> : . .EC: <br /> . . . . . . . . <br /> P F tt A (EV )EF P <br /> X <br /> IWESTLANE <br /> dri: itenL rnr�r� crorl nkat m e rice risible so fir eelt(e.ing ficlarfcian ere a <br /> p efessi�7arl ograerrar;t mrlme se?e{4 fcr ir�annrroral prnRz�. Drrnring <br /> rntioscde <br /> Date map was drawn: 712319 <br /> Instructions <br /> If you already have a diagram that shows all required Information. you may include it rather than this page, with your Monitoring System Certification. On your sae plan, <br /> show the general layout of tanks and piping. Clearly idenfify locations of the following equyment. 9 installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors: and in-tank liquid level <br /> probes (it used for teak detection). In the space provided, note the date this She Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.