Laserfiche WebLink
UNDERGROJ TO)tAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT APECTION-REPORT FORM (Page 1 of 1) <br /> Type of Action ❑ Installation inspection ❑ Repair Inspection " ' ®36 Month inspection <br /> I. FACILITY INFORMATION <br /> ERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181549 �V/RO 110/12/2018 <br /> Business Name(Same as Facility Name or DBA-Doing Business As.) <br /> D�-p4zlVTqt H <br /> Lodi Muni Service Center, City of Lodi A T Eq <br /> Business Site Address a ZIP Code <br /> 1331 S. Ham Lane Lodi 95240 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> Eric Mol acrd 209 367-4800 Ext. <br /> Contractorfrank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 774802 18881020 102/25/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certifications.) <br /> OP LIST/AST& Veeder Root#AZ7995 <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method Used: D Manufacturer Guidelines(Specify) <br /> M Industry Code or Engineering Standard (Specify)PEI/RP1200-17 <br /> ❑Engineered Method(Specify) <br /> Attach the inspection procedures and all documentation required to determine the results. #of Attached Pages: 11 <br /> Tank ID: (By tank number,stored product,etc.) 204-10k-Gas 207-Sk-DSI 208-2k-Gas <br /> What is the tank inside diameter?(inches) 92 92 75. <br /> Is the fill piping secondarily contained? ❑Yes ®No ®Yes ❑No ❑Yes ® No ❑Yes ❑No <br /> Is the vent piping secondarily contained? ❑Yes ®No ❑Yes ®No ❑Yes ® No ❑Yes ❑No <br /> Veeder Root OPW Veeder Root <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment ❑Shuts Off Flow ®Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> response when activated? ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow <br /> (Check all that apply.) ®A/V Alarm ❑AN Alarm ®AN Alarm ❑AN Alarm <br /> Are flow restrictors Installed on vent piping? ❑Yes ® No ❑Yes ®No ❑Yes ®No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention 77 83 56 <br /> set to activate?(inches from bottom of tank.) <br /> What is the percent capacity of the tank at which 90 95 80 <br /> the overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating ®Yes ®Yes ®Yes ❑Yes <br /> condition to respond when the substance ❑No ❑No ❑No ❑No <br /> reaches the appropriate level? (Specify in section V.) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ®Pass ❑Fail ®Pass ❑Fail ®Pass ❑Fail ❑Pass ❑Fail <br /> V. COMMENTS <br /> All items markedJ�FCEhlrmn ust be explained in thhis section. Any additional comments may also be ere. <br /> SEP 2 0 2019 <br /> / <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> i hereby certify that the overfill prevention equipment was Inspected In accordance with California Code of Regulations,title 23,division 3, <br /> chapter 16,section 2637.2 and all the Info ation talned herein Is accurate. <br /> UST Service Technician Si <br /> if the facility has more components than this form accommodates,additional copies of this page may be attached- <br /> CERS=C&%rnb EnvimnmrnW Repotiiug Systan,ED=Idmtificatkon,UST=UndaWound stwW tank,ICC=In6anadomt Code Council,AN=Andible and%is" <br />