Laserfiche WebLink
ELECTRICAL SPECIFICATIONS AND GENERAL NOTES: LIGHTING: I m <br /> 1. THE ELECTRICAL CONTRACTOR (E.C.) SHALL PROVIDE ALL LABOR AND MATERIALS NECESSARY FOR 28. ALL NEW CIRCUIT BREAKERS FOR EXISTING PANELBOARDS AND DISTRIBUTION PANELBOARDS SHALL 46. CONTRACTOR SHALL PROVIDE ALL NECESSARY PROPERLY SIZED WALL OR MILLWORK MOUNTED L1. COORDINATE THE LOCATION OF JUNCTION BOX (IN THE WALL) WITH THE <br /> A COMPLETE AND FULLY OPERATIONAL ELECTRICAL SYSTEM/INSTALLATION. MATCH EXISTING BUILDING PANELBOARD MANUFACTURER AND CIRCUIT BREAKER TYPE ALL CIRCUIT BOXES, RINGS, SUPPORTS, AND DEVICES AS REQUIRED VIA COORDINATION WITH ARCHITECTURAL OPENING IN TRELLIS (FOR THE LIGHT FIXTURE WIRES). THE LOCATION <br /> BREAKERS SHALL BE BOLT ON TYPE. AIC RATING OF NEW CIRCUIT BREAKER SHALL MATCH AIC WALL SECTIONS, AND MILLWORK DETAILS. OF THE JUNCTION BOX AND THE OPENING IN THE TRELLIS SHALL BE <br /> 2. MATERIALS AND INSTALLATION SHALL COMPLY WITH ALL CODES, LAWS, AND ORDINANCES OF RATING OF PANELBOARD IN WHICH IT IS INSTALLED. WHERE SERIES RATED TYPE CIRCUIT BREAKERS ALIGNED FOR THE LIGHT FIXTURE TO BE INSTALLED PROPERLY. <br /> FEDERAL, STATE, AND LOCAL GOVERNING BODIES HAVING JURISDICTION. ARE USED, NEW CIRCUIT BREAKERS SHALL BE INSTALLED SO AS TO MAINTAIN THE UL SERIES 47. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE DRAWINGS. WHERE MORE COORDINATE INSTALLATION OF JUNCTION BOX AND ANY NECESSARY <br /> RATING OF THE ENTIRE SYSTEM. THE CONTRACTOR SHALL PROVIDE A NEW TYPEWRITTEN PANEL STRINGENT REQUIREMENTS THAN THOSE DESCRIBED HEREIN OR AS SET FORTH UNDER CODES, OPENINGS IN TRELLIS WITH GC AND AREA CONSTRUCTION MANAGER. <br /> 3. ALL MATERIALS AND EQUIPMENT SHALL BE LISTED AND/OR LABELED BY U.L.,ETL, CSA, OR DIRECTORY FOR EACH PANEL CHANGED AT THE COMPLETION OF THE PROJECT. EACH CIRCUIT LAWS, AND ORDINANCES OF FEDERAL, STATE, AND LOCAL GOVERNING BODIES HAVING JURISDICTION, SEE LIGHT FIXTURE INSTALLATION INSTRUCTIONS FOR REQUIREMENTS <br /> ANOTHER RECOGNIZED TESTING LABORATORY. BREAKER SHALL BE LABELED TO IDENTIFY LOAD TYPE AND LOCATION THOSE GREATER REQUIREMENTS SHALL BE ADHERED TO. REGARDING MOUNTING BRACKETS FOR USE IN C-CHANNEL TRELLISES. <br /> COORDINATE LOCATION WITH TRELLIS MANUFACTURER. <br /> 4. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, GOVERNMENTAL FEES, TAXES AND 29• THE CONTRACTOR SHALL VERIFY THE CEILING CONSTRUCTION TYPE WITH ARCHITECTURAL DETAILS 48. ALL NEW EMERGENCY LIGHTING FIXTURES AND EXIT SIGNS SHALL BE PROVIDED WITH AN INTEGRAL L2 EC SHALL COORDINATE LOCATIONS OF ALL LIGHT FIXTURES IN DINING <br /> LICENSES NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL ELECTRICAL WORK. BEFORE ORDERING LIGHTING FIXTURES IN ORDER TO CONFIRM PROPER MOUNTING. EMERGENCY BACKUP BALLAST TO ILLUMINATE THE FIXTURES IN THE EVENT OF A POWER FAILURE. AREA WITH FINAL SEATING AND DECOR PLANS. <br /> ALL COMPONENTS SHALL BE IN COMPLIANCE WITH NFPA 101 AND NFPA 70 SECTION700. BALLAST <br /> 5. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO GOVERNMENTAL AGENCIES, UTILITY COMPANIES, 30. EACH SWITCH, LIGHT, RECEPTACLE, OR OTHER MISCELLANEOUS DEVICE SHALL BE PROVIDED WITH BATTERY SHALL MAINTAIN 87.5% OF THE NOMINAL BATTERY VOLATAGE AFTER 1.5 HOURS TO L3. IF PC-POS CASH REGISTER SYSTEM IS INSTALLED, EC SHALL RELOCATE z <br /> AND LOCAL CODE OFFICIALS, SHOP DRAWINGS AND/OR INSTALLATION DETAILS WHICH ARE A GALVANIZED OR SHERARDIZED PRESSED STEEL OUTLET BOX OF THE KNOCKOUT TYPE, OF NOT COMPLY WIT HNEC SECTION700 AND UL 924. FIXTURES ABOVE FRONT COUNTER TO AVOID GLARE ON THE CASH 0 <br /> REQUIRED BY THESE AGENCIES FOR THEIR APPROVAL. LESS THAN NUMBER 14 U.S. GAUGE STEEL. CONDUITS SHALL BE FASTENED WITH LOCKNUTS AND REGISTER SCREENS. EC SHALL INSTALL CABLE WHIP TO FIXTURES SO 0_ <br /> BUSHINGS AND ALL UNUSED KNOCKOUTS SHALL BE LEFT SEALED. THERE SHALL BE SUFFICIENT THAT FIXTURE MAY BE RELOCATED FOUR FEET WITHOUT of <br /> 6. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT, ENGINEER, AND PROJECT MANAGER IN WRITING ROOM FOR WIRES AND BUSHINGS AND DEEP BOXES SHALL BE INSTALLED WHERE REQUIRED. 49. IDENTIFICATION OF ELECTRICAL ITEMS DISCONNECTING CABLE WHIP. 0 <br /> OF ANY MATERIALS OR APPARATUS BELIEVED TO BE INADEQUATE, UNSUITABLE, IN VIOLATION OF BOXES SHALL BE SECURELY AND ADEQUATELY SUPPORTED. w <br /> A. PROVIDE PERMANENT IDENTIFICATION MARKING AND NAMEPLATES FOR ALL CONDUCTORS L4. THE USE OF "MC" CABLE IN LENGTHS OF 6 FEET OR LESS (WHERE <br /> LAWS, ORDINANCES, RULES, OR REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION. 31. NOT USED AND EACH ITEM OF ELECTRICAL APPARATUS AND ASSOCIATED CONTROLLED EQUIPMENT, WITH <br /> THE SAE INSCRIPTIONS AS SHOWN ON THE DRAWINGS. ALL IDENTIFICATION MARKINGS PERMITTED BY LOCAL CODES) SHALL BE ALLOWED FOR WIRING TO <br /> M <br /> 7. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE FIRE PREVENTION BUREAU ALL 32IN SUSPENDED CEILINGS, SUPPORT CONDUITS AND JUNCTION BOXES DIRECTLY FROM THE SHALL M CLEARLY AND NEATLY APPLIED. INTERIOR LIGHTING FIXTURES. 'ROMEX" OR "BX" SHALL NOT BE USED. <br /> . <br /> DOCUMENTS, INCLUDING DRAWINGS AND SUBMITTALS, REQUIRED TO OBTAIN APPROVAL OF THE STRUCTURAL SYSTEM, DECK OR FRAMING PROVIDED FOR THAT PURPOSE. LIGHTING BRANCH L5. <br /> EMERGENCY LIGHTING, LIFE SAFETY, AND EXIT SIGN SYSTEM(S) FOR TYPES AND LOCATIONS. A CIRCUIT CONDUITS SHALL NOT BE CLIPPED OO THE CEILING SUPPORT WIRES OR SPLINE UNLESS B. APPLY ENGRAVED PLASTIC LAMINATE NAMEPLATES WITH NON-CORRODING TYPE SCREW EC SHALL VERIFY THAT NOT MORE THAN 3% VOLTAGE DROP EXISTS <br /> COPY OF THE APPROVED DRAWINGS SHALL BE PROVIDED TO THE ARCHITECT AND ENGINEER PRIOR FROM THE LIGHTING PANEL TO ANY EXTERIOR LIGHTING FIXTURE OR <br /> TO THE START OF CONSTRUCTION. THE CEILING SYSTEM HAS BEEN SPECIFICALLY DESIGNED FOR THAT PURPOSE AND APPROVAL HAS FASTENERS OR RIVETS TO ALL MOTOR STARTERS, DISCONNECT SWITCHES, RELAYS, REMOTE SIGNAGE BALLAST. <br /> BEEN GRANTED BY THE ARCHITECT AND THE ENGINEER. CONTROL PANELS, PUSH BUTTON STATIONS, PANELBOARDS, SWITCHBOARDS, TRANSFORMERS, <br /> 8. ALL NEW ELECTRICAL WORK OR MODIFICATIONS TO EXISTING ELECTRICAL DISTRIBUTION PANELS, AND OTHER ELECTRICAL APPARATUS. NAMEPLATES SHALL BE WHITE WITH BLACK CORE, L6. WHERE MCDONALD'S RESTAURANT HAS A PLAYPLACE, THE EC SHALL <br /> PANELBOARDS, METERS, ETC. SHALL BE INSTALLED AS INDICATED ON THE ELECTRICAL 33. E.C. SHALL PROVIDE "3M" FIRESEAL SYSTEMS FOR ALL CORES AND RACEWAY PENETRATIONS IN 1-1/4" X 3" MINIMUM WITH 3/16" HIGH LETTERING. THE NAMEPLATE SHALL IDENTIFY: COORDINATE EXACT LOCATION OF PLAYPLACE LIGHTING WITH <br /> CONSTRUCTION DOCUMENTS. E.C. SHALL SUBMIT SHOP DRAWINGS OF ALL EQUIPMENT TO BE FIRE RATED WALLS AND PARTITIONS. FIRE RATE WALL AND CEILING PENETRATIONS, ETC. USING -NAME OF DEVICE OR PLAYPLACE TOY VENDOR FOR MAXIMUM ILLUMINATION AND SAFETY PER <br /> INSTALLED INDICATING FLOOR PLAN LAYOUT, ELEVATIONS, AND AL DIMENSIONS FOR APPROVAL OF "CP-25" CAULK, "303" PUTTY AND/OR "FLAMESEAL" PUTTY AS PER MANUFACTURER'S -LOAD THE DEVICE IS SERVING THE FINAL LOCATION OF THE PLAYPLACE TOY. LIGHTING FIXTURES <br /> THE ENGINEER PRIOR TO INSTALLATION. CODE REQUIRED CLEARANCES IN FRONT OF ALL INSTRUCTIONS TO MAINTAIN EXISTING AND NEW FIRE RATINGS. VERIFY FIRE RATING CONDITIONS SHALL NOT BE MOUNTED TO THE TOY OR ANY PART OF THE TOY <br /> ELECTRICAL EQUIPMENT SHALL BE MAINTAINED AT ALL TIMES. AND LOCATIONS PRIOR TO FINAL BIDS. ALL OPEN SLEEVE PENETRATIONS SHALL BE FIRESEALED C. PROVIDE A TYPEWRITTEN DIRECTORY OF CIRCUITS IN LIGHTING AND POWER PANELS AND STRUCTURE. <br /> INSIDE AND OUTSIDE BY E.C. AFTER ALL CABLING IS COMPLETELY INSTALLED. SEALING METHODS PROVIDE PANEL IDENTIFICATION IN BLACK ALKYD PAINT STENCILED INSCRIPTIONS ON THE <br /> 9. THE CONTRACTOR SHALL INCLUDE IN BID AN ALLOWANCE FOR THE FOLLOWING ADDITIONAL LIFE SHALL BE PROVIDED BY E.C. AND SHALL BE SUBJECT TO THE APPROVAL OF THE CABLING INSIDE OF THE DOOR, DIRECTLY ABOVE THE CENTERLINE OF THE DIRECTORY FRAME, OR ON L7 EC SHALL VERIFY ALL TAP SETTINGS FOR H.I.D. LIGHTING FIXTURES w <br /> SAFETY DEVICES, INCLUDING INSTALLATION AND ALL CONDUIT AND WIRE, FOR ADDITIONAL DEVICES CONTRACTOR. THE VERTICAL AND HORIZONTAL CENTERLINE OF DOORS WITHOUT DIRECTORY FRAMES. AND MAKE ANY NECESSARY CORRECTIONS PRIOR TO INSTALLATION. o <br /> AS MAY BE REQUIRED BY THE REVIEW OF THE AUTHORITY HAVING JURISDICTION. <br /> (2) EXIT SIGN FIXTURES 34. NOT USED D. PROVIDE ON DEVICE PLATES FOR LOCAL TOGGLE SWITCHES, TOGGLE SWITCH MANUAL <br /> STARTERS, PILOT LIGHTS AND OTHER ELECTRICAL ITEMS, WHOSE FUNCTION IS NOT READILY w <br /> (2) EMERGENCY LIGHTING FIXTURES 35. NOT USED APPARENT, ENGRAVED SUITABLE INSCRIPTIONS OR PLASTIC LAMINATE NAMEPLATES <br /> DESCRIBING THE EQUIPMENT CONTROLLED OR INDICATED. <br /> CONTRACTOR SHALL PROVIDE A UNIT PRICE FOR EACH FOR QUANTITY ADJUSTMENT. 36. NUMBERED CIRCUITS SHOWN ON PLAN ARE FOR THE CONVEYANCE OF DESIGN INTENT ONLY. ENGINEER OF RECORD: <br /> 10. THE CONTRACTOR SHALL INCLUDE IN BID ELECTRICAL UNIT PRICES (EUP) TO PROVIDE ADDITIONAL ACTUAL FIELD CONDITIONS WILL AFFECT CIRCUITRY. INDICATE THE ACTUAL CIRCUIT NUMBERS E. EMBOSSED SELF-ADHERING PLASTIC TAPE LABELS WILL NOT BE ACCEPTED. <br /> INSTALLED ON THE "AS-BUILT" DRAWINGSpA�ES�a <br /> . <br /> LIFE SAFETY DEVICES WITHIN FINISHED CEILING SYSTEMS, INCLUDING ALL CONDUIT AND WIRE, FOR 50. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL EXISTING OR NEW NON-ACCESSIBLE SYSTEMS fER <br /> EACH TYPE OF DEVICE AS SCHEDULED IN NOTE NUMBER 9. THE UNIT PRICE SHALL INCLUDE ALL 37. BUILDING STANDARDS DEVICES, PULLBOXES, AND EQUIPMENT, ETC. FOR RELOCATION TO ACCESSIBLE CEILING AREAS. E.C. /` <br /> GENERAL CONTRACTOR ASSOCIATED COSTS TO INSTALL DEVICES WITHIN INSTALLED CEILING A. ALL NEW CONDUIT RACEWAYS AND BOXES FOR ALL SYSTEMS SHALL BE INSTALLED SHALL INCLUDE ALL COMPLETE COSTS FOR RELOCATION AND VERIFY SUCH CONDITIONS WITH <br /> SYSTEMS. TIGHT-UP TO THE BOTTOM OF THE STRUCTURAL BEAMS WHERE REQUIRED AND PROPERLY ARCHITECTURAL CEILING PLANS PRIOR TO FINAL BIDS. 11 7 <br /> 11. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE CONTRACT DOCUMENTS, MAKE A SCHEDULED <br /> SUPPORTED FROM STRUCTURAL MEMBERS. 51. EXISTING CONDITIONS OF ALL EXISTING BUILDING EQUIPMENT, DEVICES, FIXTURES, AND SYSTEMS vc <br /> ARRANGEMENT WITH THE PROJECT MANAGER TO VISIT THE SITE, AND THOROUGHLY BECOME B. ALL NEW CONDUIT RUNS SHALL BE INSTALLED ABOVE AND OVER THE TOP OF ALL NEW THAT REQUIRE REWIRING, REUSE, RELOCATION, OR REFURBISHING AS PER DRAWINGS AND �rEOF CALNf <br /> FAMILIAR WITH THE BUILDING STANDARDS AND LOCAL CONDITIONS RELATING TO THE WORK. SPECIFICATIONS SHALL BE FIELD VERIFIED BY THE E.C. PRIOR TO COMMENCEMENT OF ANY WORK <br /> FAILURE TO DO SO WILL NOT RELIEVE THE CONTRACTOR OF THE OBLIGATIONS OF THE CONTRACT. AND/OR EXISTING DUCTWORK, PIPING, CONDUITS, ETC. E.C. SHALL PROVIDE ALL TO BE COMPLETELY OPERATIONAL. E.C. SHALL SUBMIT A WRITTEN STATEMENT AND ITEMIZED <br /> NECESSARY ACCESSIBLE PULLBOXES. CONDUIT BENDDSS SHALL <br /> NOT EXCEED CODE LISTING OF ALL EXISTING CONDITIONS OF THE FOLLOWING, ALTHOUGH NOT LIMITED TO THOSE 4/25/1912. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND WIRING FOR THE PERFORMANCE OF REQUIREMENTS WITHIN A SINGLE RUN. E.C. SHALL PROVIDE ALL PULLBOXES AS REQUIRED. LISTED: <br /> ALL TRADES, FOR THE ENTIRE PERIOD OF CONSTRUCTION AND SHALL REMOVE ALL TEMPORARY C. NEW CONDUIT RUNS OR PULLBOXES SHALL NOT BE INSTALLED LESS THAN 2 INCHES Napa <br /> WIRING AT THE COMPLETION OF CONSTRUCTION. ALL COSTS FOR ESTABLISHING AND REMOVING A. HVAC EQUIPMENT <br /> TEMPORARY POWER SHALL BE INCLUDED IN BID. ABOVE RECESSED LIGHTING FIXTURES UNLESS APPROVED BY THE ENGINEER. W Q <br /> B. EXIT SIGNS AND EMERGENCY LIGHTING FIXTURES <br /> D. NEW CONDUIT RUNS OR PULLBOXES SHALL NOT BLOCK OR PREVENT FULL AND C. LIFE SAFETY/FIRE ALARM SYSTEM DEVICES o <br /> 13. THE EXISTING POWER, SIGNAL, AND COMMUNICATIONS SYSTEMS ARE REMAIN IN SERVICE TO COMPLETE ACCESS AND OPERATION OF NEW OR EXISTING HVAC EQUIPMENT, ACCESS DOORS, D. LIGHTING AND RECEPTACLE DEVICES. <br /> PROVIDE FOR THE OWNER'S EXISTING FUNCTIONS. SHOULD IT BECOMEE NECESSARY TO SHUT-DOWN PIPING VALVES, JUNCTION BOXES, DUCT HEATERS, MAIN SUPPLY AND RETURN AIR DUCTS, <br /> ANY SYSTEM OR PORTION OF A SYSTEM, APPROVAL IN WRITING MUST BE OBTAINED FROM THE PULLBOXES, CLEANOUTS, ETC. THE WRITTEN STATEMENT SHALL BE SUBMITTED TO THE PROJECT MANAGER, ARCHITECT, AND <br /> PROJECT MANAGER AND SHALL BE ONLY FOR THE PERIOD AND TIME AGREED UPON. THE BID IS ENGINEER PRIOR TO WORK. IN THE EVENT THAT THE CONTRACTOR COMMENCES WORK WITHOUT <br /> TO INCLUDE THE COST OF ANY TEMPORARY WIRING AND PREMIUM TIME REQUIRED FOR THE E. NEW CONDUIT AND PULLBOXES TO BE INSTALLED BELOW NEW OR EXISTING DEUCTWORK SUBMITTAL, THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY AND COST TO MAINTAIN THE y <br /> SHUTDOWN. SHALL BE MOUNTED TIGHT UP TO BOTTOM OF DUCT WITH 90 DEGREE BENDS UP SIDEWALL ABOVE IN GOOD WORKING ORDER AND CONDITION. <br /> 14. ALL MATERIALS AND EQUIPMENT SHALL BE ERECTED, INSTALLED, TOOLED, CONNECTED, CLEANED, OF DUCT TO MEET REQUIREMENTS OF LETTER C ABOVE. SUPPORTS SHALL NOT PRENETRATE �. <br /> DUCTWORK, AND SHALL BE INDEPENDENT OF ALL DUCTWORK SUPPORTS. DIRECT CONTACT 52. E.C. SHALL REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL ELECTRICAL AND <br /> ADJUSTED, TESTED, CONDITIONED, AND PLACED IN SERVICE IN ACCORDANCE WITH THE OF CONDUIT RACEWAY SYSTEMS WITH DUCTWORK OR PIPING SHALL BE PROVIDED WITH COMMUNICATIONS OUTLETS. ELECTRICAL ENGINEERING DRAWINGS SHALL BE USED FOR CIRCUITING } o <br /> MANUFACTURER'S DIRECTIONS AND RECOMMENDATIONS. VIBRATION SEPARATION METHOD APPROVED BY THE ENGINEER. INFORMATION ONLY. m o 0 <br /> o a ^off <br /> 15. ALL CUTTING, DRILLING, AND PATCHING OF MASONRY, DRYWALL, CONCRETE, STEEL, OR IRON WORK <br /> F. E.C. SHALL REFER TO MECHANICAL AND PLUMBING ENGINEERING DRAWINGS FOR EXACT LOCATIONS Q a <br /> F. NEW CONDUIT AND BOXES TO BE INSTALLED WITHIN ALL EXISTING FINISHED BUILDING Q a <br /> BELONGING TO THE BUILDING SHALL BE DONE BY THIS CONTRACTOR IN ORDER THAT WORK MAY DRYWALL, FURRED BUILDING WALLS, PARTITIONS, AND COLUMNS SHALL BE INSTALLED WITH OF ALL MECHANICAL AND PLUMBING EQUIPMENT. w o P 3 <br /> BE PROPERLY INSTALLED. UNDER NO CONDITIONS MAY STRUCTURAL WORK BE CUT. EXCEPT AT o- 3 <br /> EMT AND FLEXIBLE RACEWAYS NOT MORE THAN 6'-0" LONG. ELECTRICAL CONTRACTOR C 3 <br /> cj <br /> THE DIRECTION OF THE ARCHITECT/ENGINEER OR THEIR REPRESENTATIVE. SHALL INCLUDE ALL COSTS FOR DRYWALL ACCESS, CUTTING, PATCHING, PAINTING, ETC. IN <br /> BIDS FOR SUCH CONDITIONS. FIELD VERIFY ALL LOCATIONS ON SITE PRIOR TO FINAL BIDS. o ° <br /> 16. SHOP DRAWINGS SHALL INCLUDE MANUFACTURER'S NAMES, CATALOG NUMBERS, CUTS, DIAGRAMS, EXCEPTIONS DURING BIDS SHALL BE SUBMITTED IN WRITING. .0 �' "' °6 <br /> AND OTHER SUCH DESCRIPTIVE DATA AS MAY BE REQUIRED TO IDENTIFY AND REVIEW THE ° L 73_0 °w ° °•-+ <br /> "- <br /> EQUIPMENT. SUBMITTALS SHALL BE IN LOGICAL GROUPS (FOR EXAMPLE ALL LIGHTING FIXTURES). G. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL BE HELD RESPONSIBLE TO ° ° ° ° <br /> L N i ° C 0 <br /> ° 'i "' N 0 U+ <br /> PARTIAL SUBMITTALS WILL NOT BE REVIEWED. HAVE EXAMINED THE CONSTRUCTION SITE WITH RESPECT TO CONSTRUCTION DRAWINGS, °- °' °' <br /> ACTUAL FIELD CONDITIONS, DOOR FRAME HEIGHTS, PIPING OBSTRUCTIONS, DUCTWORK "'I a o °o a o <br /> o CL <br /> 17. SUBMIT FOUR (4) COPIES OF THE FOLLOWING SHOP DRAWINGS FOR REVIEW: HEIGHTS AND LEVELS, FLOOR LEVELS, CEILING HEIGHTS, ETC. PRIOR TO FINAL BIDS. <br /> A. LIGHTING FIXTURES AND LAMPSo n o 3 5 ° ° <br /> B. WIRING DEVICES H. ALL NEW BUILDING STANDARD EQUIPMENT, DEVICES, AND MATERIALS SHALL BE EQUAL TO o 0 0 .� ° <br /> C. LOW VOLTAGE RELAYS AND SWITCHES OR GREATER IN QUALITY TO EXISTING APPROVED BUILDING STANDARD MATERIALS PRESENTLY Q ° � <br /> D. DIMMERS AND CONTROLS INSTALLED IN BUILDING. EQUIPMENT, DEVICES AND MATERIALS SHALL BE SUBJECT TO THE m � '--o E o <br /> APPROVAL OF THE ARCHITECT, PROJECT MANAGER, AND THE ENGINEER. 0 ° ° ` ° <br /> N <br /> 18. CONTRACTOR SHALL PROVIDE "AS-BUILT' DOCUMENTATION AND HARD COPY REPRODUCIBLE p = ° ° 3 ° N <br /> DRAWINGS AT THE COMPLETION OF THE PROJECT AND SUBMIT TO THE ARCHITECT AND THE I. ALL EMERGENCY AND EXIT SIGN JUNCTION BOXES SHALL BE PAINTED RED. PANEL TAG o a o o °C o <br /> ENGINEER. AS-BUILT DRAWINGS SHALL INDICATE EXACT CIRCUIT NUMBERS, LOCATIONS OF ALL AND CIRCUIT NUMBER FOR ALL WIRING WITHIN JUNCTION BOX SHALL BE INDICATED ON m o 0 a, a° o <br /> DEVICES, CEILING FIXTURES, AND RACEWAY FOR LIGHTING, TELECOMMUNICATIONS AND POWER COVER. u ° °.� ° E~; <br /> DISTRIBUTION SYSTEMS AS INSTALLED. ° o ° o'' °'t- o <br /> J. ALL JUNCTION BOXES SERVING LIGHTING AND POWER SHALL HAVE CIRCUIT NUMBERS AND � 0� ° � °v N <br /> 19. ALL MATERIAL, EQUIPMENT, WIRING DEVICES, ETC. SHALL BE NEW AND OF COMMERCIAL GRADE PANEL TAGS FOR ALL WIRING WITHIN JUNCTION BOX SHALL BE INDICATED ON COVERS. ° ~ w ° <br /> UNLESS SPECIFICALLY INDICATED AS EXISTING TO BE REUSED ON DRAWINGS. -0 E a <br /> 38. A NEW PANELBOARD COPPER GROUND BUS SHALL BE INSTALLED FOR EQUIPMENT GROUNDING 0 o N ° o <br /> 20. EXCEPT AS NOTED OTHERWISE, ALL WORK REQUIRED FOR THE ELECTRICAL INSTALLATION AS REQUIREMENTS FOR ALL PANELBOARDS LACKING A GROUND BUS. C a <br /> SHOWN ON DRAWINGS SHALL INCLUDE ALL LABOR, INSTALLATION METHODS, EQUIPMENT, AND Q o `' ° E'- a) <br /> MATERIALS AND SHALL BE IN STRICT COMPLIANCE WITH ALL BUILDING STANDARDS. 39. PERFORM ALL WORK OF A DEMOLITION NATURE THAT MAY BE REQUIRED OR NECESSARY FOR THE o 0 0 12-; <br />