My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6440
>
1600 - Food Program
>
PR0505771
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 4:10:11 PM
Creation date
8/25/2020 3:10:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0505771
PE
1624
FACILITY_ID
FA0006991
FACILITY_NAME
MCDONALDS #14444
STREET_NUMBER
6440
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532018
CURRENT_STATUS
01
SITE_LOCATION
6440 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I M <br /> KEY NOTES <br /> EXISTING F12S LIGHT FIXTURES TO REMIAN. <br /> ❑2 ALL SOFFIT LOCATIONS, LIGHTING, & SUPPLY GRILLS SHALL <br /> BE COORDINATED WITH DECOR COMPANY DRAWING PRIOR TO <br /> INSTALLATION. <br /> 3 <br /> ❑3 EXISTING LIGHTING TO REMAIN. <br /> ❑3 <br /> PROVIDE DUAL-LITE LIGHTING INVERTER MODEL #LG1-T FOR O <br /> ❑3 USE WITH TYPE F12S/F13 "EM" TAG. E.C. SHALL FIELD <br /> VERIFY EXACT QUANTITY AND LOCATION OF DEVICE PRIOR TO <br /> INSTALLATION. WHEN OPTIONAL F15&F15A FIXTURES ARE v <br /> I USED, E.C. SHALL VERIFY QUANTITY OF FIXTURES THAT CAN w <br /> ❑ I BE CONNECTED TO INVERTER WITHOUT EXCEEDING OPERATING 0 <br /> CAPACITY OF UNIT AND PROVIDE ADDITIONAL CIRCUITS AND <br /> 3 INVERTERS AS REQUIRED <br /> ❑ I � I ❑ <br /> 1 DRAFT STOP ABOVE CEILING. E.C. TO ENSURE INTEGRITY OF <br /> FIRE RATED WALLS WHERE ELECTRICAL EQUIPMENT <br /> 1 PENETRATES WALLS. SEAL PER SPECIFICATIONS FOR FIRE <br /> 1 1 4 STOPPING. <br /> ❑3 1 <br /> 1 <br /> ❑3 1 EMERGENCY LIGHTING NOTES <br /> EL1. EC SHALL INSTALL A LOCK ON CIRCUIT BREAKER HANDLE, FOR ALL <br /> EMERGENCY LIGHTING CIRCUITS. EC SHALL VERIFY ALL REQUIREMENTS w <br /> 1 1 1 AND FINAL EMERGENCY LIGHTING LOCATIONS WITH LOCAL AUTHORITIES.Ec o <br /> 1 ❑ 1 1 INCLUDE ALL COSTS IN BASE BID. <br /> EL2. IF NOT INSTALLED BY MANUFACTURER, EC SHALL BE RESPONSIBLE FOR <br /> ELECTRICAL CONTRACTOR TO 1 THE COMPLETE INSTALLATION OF THE EMERGENCY INVERTER IN NIGHT w <br /> REUSE/RELOCATE EXISTING FIXTURES I I � <br /> 1 _ _ AS SHOWN. RECONNECT TO EXISTING LIGHTING FIXTURES SHOWN ON THIS SHEET. <br /> ❑3 1 ❑ CIRCUITRY, CONTROLS AND ENGINEER OF RECORD: <br /> Ll <br /> EMERGENCY INVERTERS SERVING FOOD EL3. LED FIXTURES DENOTED AS NIGHT LIGHTING OR SWITCHED EMERGENCY <br /> �❑ SERVICE AREA. SHALL BE APPROVED WITH DUAL LITE LIGHTING INVERTER MODEL # E � <br /> 1 LG125T. INVERTER SHALL BE CAPABLE OF ILLUMINATING FIXTURE FOR 1.5 PA fER k� <br /> 1 HOURS TO COMPLY WITH NEC SECTION 700 AND UL924. E.C. SHALL (G, <br /> NOT INSTALL MORE THEN EIGHT FIXTURES To EACH INVERTER. PROVIDE <br /> ❑3 7 <br /> I ADDITIONAL NVERTERS AS NECESSARY. <br /> ❑ ❑3 EL4. EMERGENCY BATTERY LIGHTING WALL PACKS IN PLAYPLACE SHALL BE <br /> 1 ❑ LOCATED SO AS TO PROVIDE FOR MAXIMUM LLUMINATION OF AREA. <br /> 3 EC SHALL VERIFY EXACT PLACEMENT IN THE FIELD WITH McDONALD'S �rEOF CA,.Nf <br /> 1 2 ACM. (IF APPLICABLE) <br /> \T 1 <br /> EL5. EMERGENCY LIGHTING HAS BEEN DESIGNED PER NFPA 101 To MAINTAIN 1 4/28/1 <br /> 1 FC IN PATH OF EGRESS. IF FIELD CONDITIONS REQUIRE ANY <br /> 1 CHANGES TO LIGHTING DESIGN, EMERGENCY LIGHTING, SHALL BE r U Z <br /> ❑ , <br /> 1 ❑ INSTALLED To MEET THE ABOVE REQUIREMENTS. <br /> 1 3 W , O w <br /> 1 TITLE-24 INDOOR LIGHTING NOTE: <br /> SPACE. <br /> Q <br /> ❑3 TITLE 24 CALCULATIONS ARE NOT REQUIRED FOR PROJECTS THAT <br /> 1 UPDATE LESS THAN 10% OF EXISTING LUMINAIRES IN THE CONDITIONED <br /> 1 <br /> 1 �❑ <br /> W <br /> } E <br /> m � o <br /> o a ^oLdff <br /> �� � <br /> Q a ago <br /> w o <br /> w � X5.5 <br /> I-0 3 <br /> c � � <br /> O N N 0-6 <br /> U N <br /> p 0 <br /> p c L <br /> o Lp O <br /> L N L O C <br /> p N 7 4U6 <br /> +�+ <br /> J � � <br /> O L Q�D0 0 <br /> p ° 0 0-0 <br /> L <br /> c n p X373 <br /> Q a a <br /> O co A <br /> U C N N N <br /> co N -0E'+ 0� N'o' <br /> p 7 •� <br /> U� O CO D'p- <br /> N 0 O,'3+-. p L <br /> O U 0 t <br /> p <br /> N U O p 0 O <br /> (n+ U 0 a 0 <br /> C S+ (1 <br /> 0 0 U'F 0 0 0 <br /> O <br /> 0+ X <br /> V) +0 0t'- 0 <br /> _ U <br /> J~.c.0 O p p <br /> O <br /> •U Q C,+ U L <br /> O <br /> 0 D U C N 0 f1 <br /> t0/l-.0•L 0 •U C <br /> 0 0 7 (t) 7 0 0 0 <br /> 0 0 U L O-O <br /> V) <br /> O ��� <br /> L�0 ii <br /> 0 O L oz 3 0 0 <br /> L 3 p L <br /> ® 0 L + <br /> Ljj <br /> (011 7 N O <br /> QN Q D 7 (t) .0 U <br /> C 0 0:5 L� N L N <br /> 0- C- V) <br /> d <br /> ui <br /> KEY } z c) N <br /> LIGHTING FIXTURES SHOWN WITH A SLASH SHALL 1 ELECTR I CAL LIGHTING P LAN m Df ui 0 0 Co a <br /> BE WIRED TO AN EMERGENCY INVERTER AND z = N N � CD - N a N <br /> DENOTES CIRCUITED AS SWITCHED EMERGENCY FIXTURES SO E2.0 1 /4" = 1 -0 z ``' w o <br /> FIXTURE TYPE 2F2fj�THE FIXTURE IS CONTROLLED VIA TIMECLOCK BUT o o � w � o o vi 0 <br /> TURNS ON UPON LOSS OF POWER. SEE NOTE EL3 <br /> � N > <br /> DENOTES CIRCUIT ON E2.0 FOR EMERGENCY LIGHTING INVERTER <br /> NUMBER REQUIREMENTS. COORDINATE LOCATION WITH <br /> DECOR. <br /> N <br /> 0) <br /> GENERAL NOTES FOR DRAWING E2 . 0 : GENERAL NOTES FOR DRAWING E2 . 0 : PROJECT DEMOLITION NOTES : D3. THE ELECTRICAL CONTRACTOR SHALL RELOCATE ALL EXTERIOR ROOF s <br /> MOUNTED GENERAL PURPOSE OUTLETS AND ALL PHOTOCELLS AS REQUIRED o <br /> OUTDOORS LIGHTING INSTALLATION METHODS THE FOLLOWING PROVIDES A GENERAL SCOPE OF WORK FOR THE TO ALLOW FOR THE NEW FACADE INSTALLATION. COORDINATE EXACT J <br /> ELECTRICAL CONTRACTOR FOR THE DEMOLITION REQUIREMENTS OF THIS EXTENT OF WORK WITH ARCHITECTURAL DRAWINGS AND IN THE FIELD WITH <br /> P1 . E.C. SHALL PROVIDE AN ADDITIVE ALTERNATE COST (ELEC-DT-1) 1. ALL LIGHT FIXTURES SHALL BE 120 VOLT UNLESS NOTED OTHERWISE. 7. EC SHALL INSTALL ALL SOFFIT LIGHTINGTHE PROJECT MANAGER. RECEPTACLES SHALL BE INSTALLED SO AS TO BE <br /> TO PROVIDE POWER FOR A NEW MENU BOARD, POWER AND DATA FIXTURES AWAY FROM BUILDING WALL. SITE. THIS SECTION IS NOT ALL INCLUSIVE, AND THE CONTRACTOR SHALL WITHIN 25'-0" OF ANY ROOFTOP HVAC EQUIPMENT PER NEC 210.63. <br /> FEEDS AND CONNECTIONS FOR A NEW COD, AND A LANE 2. LIGHTING FIXTURES AND LAMPS HAVE BEEN CHOSEN TO ACHIEVE MAXIMUM ENERGY CONSERVATION WHILE MAINTAINING ADEQUATE LEVEL FIXTURES SHALL BE LOCATED TO AVOID VISIT THE SITE AND COMPARE EXISTING CONDITIONS TO THE <br /> REQUIREMENTS DENOTED ON THE CONSTRUCTION DOCUMENTS TO � � <br /> DETERMINE THE EXACT EXTENT OF THE DEMOLITION WORK REQUIRED. E.C. <br /> MONITOR. COD LOCATIONS SHALL EACH BE PROVIDED WITH A NEW OF ILLUMINATION. LAMP SPECIFICATIONS SHALL BE STRICTLY FOLLOWED. ANY DEVIATION FROM LAMP SPECIFICATIONS SHALL BE INTERFERENCE WITH STRUCTURAL D4. E.C. SHALL VERIFY WHETHER EXISTING OUTDOOR RECEPTACLES ARE GFCI <br /> (n � <br /> ISOLATED GROUNDING TYPE CIRCUIT, AND A NEW 2" DATA APPROVED IN WRITING BY McDONALD'S CORPORATION. MEMBERS ABOVE SOFFIT. PROTECTED. IF NOT, E.C. SHALL PROVIDE NEW GFCI TYPE PROTECTED a <br /> SHALL PROVIDE ALL DEMOLITION WORK REQUIRED IN ORDER TO ALLOW Q z <br /> CONDUIT TO NEW LOCATION. ALL WORK AND INSTALLATION FOR THE COMPLETE INSTALLATION AS DENOTED WITHIN THESE DRAWINGS. RECEPTACLE DEVICES IN PLACE OF EXISTING. E.C. SHALL ALSO PROVIDE (, z N <br /> LOCATIONS SHALL BE COORDINATED WITH THE MCDONALD'S 3. PROVIDE A WEATHERPROOF JUNCTION BOX IN PARAPET FOR FASCIA SIGNS. FINAL CONNECTION BY OTHERS. VERIFY EXACT LOCATION OF 8. THE USE OF "MC" CABLE IN LENGTHS OF WEATHERPROOF COVERS FOR ALL OUTDOOR RECEPTACLES TO COMPLY w w <br /> PROJECT MANAGER PRIOR TO INSTALLATION. SIGN WITH McDONALD'S PROJECT MANAGER PRIOR TO INSTALLATION. 6 FEET OR LESS (WHERE PERMITTED BY WITH NEC SECTION 406.8(B). z tj o z <br /> LOCAL CODES) SHALL BE ALLOWED FOR U 0 Q V) a <br /> OUTDOOR BUILDING LIGHTING-/POWER GENERAL Q J U- W <br /> P2. E.C. SHALL PROVIDE POWER FOR NEW EXTERIOR LAWN MOUNTED 4. EC SHALL COORDINATE LOCATION OF ALL EXTERIOR LIGHTS WITH McDONALD'S PROJECT MANAGER TO AVOID INTERFERENCE WITH ANY WIRING TO THE LIGHTING FIXTURES. m - o w o N <br /> WALL WASHING LIGHT FIXTURES AS LOCATED ON SITE PLAN. <br /> CORBELS, TRUSSES, BEAMS OR OTHER SPECIAL EXTERIOR TREATMENTS. INSTALL LIGHT FIXTURES WITH CORRECT ORIENTATION PER "ROMEX" OR "BX" SHALL NOT BE USED. D1. THE ELECTRICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ALL OF _ o `'' <br /> MANUFACTURER'S INSTRUCTIONS. D5. THE ELECTRICAL CONTRACTOR SHALL COORDINATE THE SALVAGE m w ~ Q <br /> THE EXTERIOR ILLUMINATED ROOF BEAMS FROM THE BUILDING. REMOVE z w w o <br /> 9. EC SHALL VERIFY THAT NOT MORE THAN REQUIREMENTS FOR ALL EQUIPMENT REMOVED AS PART OF THE _ALL FIXTURES, WIRING, WHIPS, AND CONDUIT TO ALLOW FOR THE NEW Q o <br /> 5. EC SHALL FIELD VERIFY THAT ALL LIGHT FIXTURES SHOWN ON THIS PLAN 3% VOLTAGE DROP EXISTS FROM THE DEMOLITION WORK WITH THE CONSTRUCTION PROJECT MANAGER. ALL w v, <br /> w <br /> DO NOT OBSTRUCT OR CONFLICT WITH THE WORK OF OTHER TRADES. LIGHTING PANEL TO ANY EXTERIOR FACADE INSTALLATION AS DENOTED ON THE PLANS. COORDINATE ALL WORK z z g <br /> WITH OTHER TRADES AND WITH THE PROJECT MANAGER. EQUIPMENT TO BE SALVAGED AND/OR REUSED SHALL BE PROTECTED o � z co <br /> IF A DISCREPANCY IS FOUND, THE EC SHALL IMMEDIATELY NOTIFY THE LIGHTING FIXTURE OR SIGNAGE BALLAST. FROM DAMAGE UNTIL REINSTALLED OR THE TIME PERIOD WHEN IT IS O� a- uj w o <br /> GC BEFORE THE INSTALLATION OF SUCH FIXTURE(S). 04 <br /> D2. THE ELECTRICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ALL TURNED OVER TO THE OWNER AND/OR THE PROJECT MANAGER. - 0 � 0- - i <br /> EXTERIOR ELECTRICALLY POWERED FASCIA SIGNAGE FROM THE BUILDING. � O x w ov w o <br /> 6. ORDER LED EXIT SIGNS WITH LETTER COLORS THAT COMPLY WITH LOCAL CODES FROM SECURITY LIGHTING. D6. SEE THE GENERAL ELECTRICAL SPECIFICATIONS AND NOTES ON SHEET N LTJ cn o <br /> - FOR RED LETTERS USE #PRB (UNIVERSAL), SPECIALITY LIGHTING REMOVE ALL SIGNAGE, WIRING, WHIPS, AND CONDUIT TO ALLOW FOR THE E1.0 FOR ADDITIONAL GENERAL REQUIREMENTS. <br /> - FOR GREEN LETTERS USE #PGB (UNIVERSAL), OR NEW FACADE INSTALLATION AS DENOTED ON THE PLANS. COORDINATE ALL <br /> 10. SEE THE ARCHITECTURAL DRAWINGS FOR WORK WITH OTHER TRADES AND WITH THE PROJECT MANAGER. D7. THE ELECTRICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ALL <br /> IF THE ABOVE EXIT SIGNS DO NOT COMPLY WITH LOCAL CODES USE: LED SIGN WITH BATTERY BACKUP, LETTER SIZE, COLOR, TYPE & o <br /> EXACT LOCATIONS AND REQUIREMENTS FOR THE FACADE ARCADE LIGHTING ELEMENTS, REMODEL TO ALLOW FOR THE NEW LIGHTING FIXTURE INSTALLATION AS <br /> DIRECTIONAL ARROWS AS REQUIRED BY THE LOCAL AUTHORITIES. EXISTING LIGHT FIXTURES IN THE AREAS ASSOCIATED WITH THE <br /> w • 0 <br /> 7. ALL NON EMERGENCY LIGHTING IS TO BE ROUTED THROUGH THE BUILDING ENERGY MANAGEMENT SYSTEM FOR COMPLETE BUILDING AND CANOPY ELEMENTS. DENOTED ON THE PLANS AND DECOR DRAWINGS. COORDINATE ALL v=i <br /> LIGHTING PLAN <br /> LIGHTING AUTO SHUT-OFF WORK WITH OTHER TRADES AND WITH THE PROJECT MANAGER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.