Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 2/5/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address:_ ! E.F. KLUDT 1126 E. PINE STREET LODI CA 95240 i <br /> NEXT TO BUILDING . . . . . . KEY <br /> 7 <br /> . . . A = AN.NMAR <br /> F = FILLS <br /> . . . - . I . T = TLTRBIN'E <br /> 110 10C Kersena P = PROBE <br /> T T V = VAP OR <br /> Y = SLh1P SENSOR <br /> L = LeakDetector <br /> p_o p— hl = hf&n%vky <br /> F— o F—o - - • - - B = Brine Sensor <br /> I = Smart Sensor <br /> A—o A— o . . . . . . S = STP <br /> - A I C = Floats & Chains <br /> - E = E stop <br /> . . - . <br /> - . _ . OUTER CORNER . . _ . . . . . . . F . . . . . . . . . . . _ <br /> . . . . . . . . . . . . . . _ <br /> . . . . . . . . . . . . . . . <br /> Clear DIE <br /> - . <br /> . . . . . . Red Main DIE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> T <br /> F lr5 q <br /> Red Syphon Die *PIPLNG } <br /> r C . . . . M . . (ARROWS) <br /> t / J <br /> u Dratcing of <br /> 13 - - - - - _ _ _ pipirLerita£ <br /> Not in use I I I I - sump and UDC' <br /> No underground <br /> . . . . . . . _ drauvsp n <br /> • • • • A • I Iirb itenarrrr! rgrrnurltltrarnenofAisibletomen cannot speculate <br /> p•q(esrroird opirdarr ono% Drmrir� blue <br /> ootto :cde <br /> Date map was drawn : 25-79 <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br /> shale the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill carrtainem or other secondary containment areas; mechanical or electronic line leak detectors; and in4ankliquid level <br /> probes (it used for leak deteeP,on). In the space provided, note the date this Site Plan was prepared. <br /> . . . - . , .. <br /> LEGEND <br />