Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 2/5/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Sate Address E.F. KLUUT 1126 E. PINE STREET LODI CA 95240 <br /> NEST TO BUILDING . . . KEY <br /> n A = AP MLAR <br /> . . . F = FILLS <br /> . . . . . . . . . . . . . . T = WRBP1E <br /> 110 OC Ker =_etre - - . P = PROBE <br /> . . . . . . . . _ . . . . 1' = VAPOR <br /> T T Y = SUMP SFNSOR <br /> L = Leak Detector <br /> P- P 1 Tl = bimwly <br /> F- o a . . . . . . B =Brine Sensor <br /> I = Smart Sensor <br /> `Lo Al o S = STP <br /> ' C = Floats fi Chains <br /> E = E Stop <br /> . . . . . . - . . . . _ . <br /> OUTER CORNER . . . . . . . . . . - - - . <br /> . . . . . . - . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Clear DIE X TL . . . . . . <br /> 046 (D <br /> Red Main DIE . 6 4 1 . <br /> T <br /> . . . . _ <br /> Red Syphon Die <br /> ti piping cut of <br /> Not in usexwn,p and UDC's. <br /> . . . . . . . . - No underEround <br /> drawing is <br /> - - WCJJUtrte, \Va <br /> _fir: itenitrrrrk)grorarlthrtm•enot iisibletoO cerYjfiirrglerlariciairiv a Cannot ]Veculate <br /> pis imzrlopiramzoraearrlaeselehf'cr it orncrturrrlpra�za. Drawing . . . V I L blue <br /> Ivi tosctie <br /> Date reap was drawn: 2.5-19 <br /> Instructions <br /> N you already have a diagram that shows allrequired information, you may include_ it, rather than this page, with your Monitoring System Certification. On your -de plan , <br /> shorn the general layout of tanks and piping. Clearly Lientily locations of the Following equipment, 9 installed: monitormg system control panels; sensors monitoring tank <br /> annular spaces, =sumps , dispenser pans, spill containers, or other secondary containment areas ; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />