Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: SHORTSTOP 20 A W. TURNER ROAD LODI CA 95240 <br /> . ATG . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> *PIPING * . . KEY <br /> (ARROWS) . . . . 0 -STORE A = ANNULAR <br /> Drawing of piping F = FILLS <br /> exit of sump and T = TURBINE <br /> UDC ' s. No P = PROBE <br /> underground . . V = VAPOR <br /> drawing is accurate, 0 0 a X = SUMP SENSOR <br /> we cannot L = Leak Detector <br /> speculate blue M = Manway <br /> prints. B = Brine Sensor <br /> I = Smart Sensor <br /> J S = STP <br /> C = Floats & Chains <br /> E = E Stop <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . .91 . . . . . . . . . . . . DIE. . . . <br /> . . . <br /> 3. . . . . 1 . <br /> . Y T <br /> 4 . . . . . 2 . <br /> A F O ❑T O L P <br /> P <br /> . ❑ P <br /> t . . . . . .X.87 . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . CAS VENTS. . . . . . . . <br /> An, rreu r, ar T,isibls to fire serijew rg1wimicfasr ea s a <br /> �a-gfessiamla��ieaamor�'vatrlta-Rscle�,•„frs- rr�vrnn�rioml�xffpae�- DrteFrff� <br /> 1 148, <br /> roto scare <br /> Date map was drawn : <br /> Instructions <br /> If you already have a diagram that shows all required information , you may include it, rather than this page , with your Monitoring System Certification . On your site plan , <br /> show the general layout of tanks and piping . Clearly identify locations of the following equipment, if installed : monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers , or other secondary containment areas; mechanical or electronic line leak detectors ; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided , note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21 /07 <br />