Laserfiche WebLink
Spill Bucket Testing Report <br /> 1 . FACILITY INFORMATION <br /> Facility Name : BFS Tracy Inc. ( Valero # 3698) Date of Testing: 1 /23/2019 <br /> Facility Address: 153 E . l P" St . Tracy, CA 95376 <br /> Facility Contact: Raman Baines Phone : (209) 832 - 8815 <br /> 2 . TESTING CONTRACTOR INFORMATION <br /> Company Name: Diamond Petroleum Services, Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License # 1005444 ICC Certification # 5250451 <br /> 3 . SPILL BUCKET TESTING INFORMATION <br /> Test Method Used : Hydrostatic <br /> Test Equipment Used : Standard Tape Measure Equipment Resolution : 1 / 16" <br /> Identify Spill Bucket (By Tank Tl : 87 Syphon Fill T2 : 87 Master Fill T3 : 91 Fill T4 : <br /> Number, Stored Product, etc. <br /> Bucket Installation Type : Direct Buy Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump x Contained in Sump Contained in Sum <br /> Bucket Inside Diameter: 10 3/4" 10 3/4" 10 '/," <br /> Bucket Depth : 14" 14" 13 3/a" <br /> Wait time between applying 5 minutes 5 minutes 5 minutes <br /> vacuum/water and start of test: <br /> Test Start Time (Ti) : 3 : 00 pan . 3 : 05 p . m . 3 : 10 p . m . — <br /> Initial Reading (R►) : 14" 14" 13 3/4" <br /> Test End Time (TF) : 4 : 00 p. m . 4 : 05 pan . 4 : 10 p . m . <br /> Final Reading (RF) : 14" 14" 13 '/4" <br /> Test Duration (TF - Ti) : line 1 hr 1 hr <br /> Change in Reading (RF - R►) : 0 0 0 <br /> Pass/Fail Threshold or 1 /8>, 1 /8" 1 /8 " <br /> Criteria : <br /> Test Result* Pass x Fail Pass x Fall Pass x Fail Pass ❑ Fail <br /> Comments : The spill buckets passed the hydrostatic test for I hour, but do not hold the 5 gal <br /> capacity. Spill Buckets hold approximately 4 7/8 " gallons . To accomplish the 5 gallons , the <br /> 4" riser needs to be replaced or cut and threaded in order to fit either the existing Phil-Tite <br /> 3 '/2 gallons bucket or install the new Phil-Tite 5 gallons spill gallons . Spill Buckets are <br /> secondarily contained (Fill Sumps) . <br /> r <br /> Technician 's Signature : -` ' ��- --%' / �� Date : 1 /23/2019 <br /> i <br />