Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM tiPage 1 of 6) <br /> Type of Action ❑ Installation Test ❑Repair Test ❑Six Month Test ®36 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID 10181411 Date of Secondary Containment Test <br /> 4/2/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Shell 136186 <br /> Business Site Address City ZIP Code <br /> 3725 N.Tracy Blvd. Tracy 95376 <br /> 11. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification) Phone# <br /> Michael McCarter (707)545-5522 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> Able Maintenance, Inc.-312844 8819839 10/25/2019 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> TANK ID:(By tank number,stored product,etc.) A 87 B 89 C 91 D Diesel <br /> Tank Containment <br /> Tightness Test Result ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Product Piping Containment <br /> Tightness Test Result ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA <br /> Communication Test Result ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Communication Test Result ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Communication Test Result ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result [:]Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Communication Test Result ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail 0 NA <br /> Turbine/Product Piping Sump <br /> Tightness Test Result ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA <br /> Fill Riser Sump <br /> Tightness Test Result ❑Pass 0 Fail ❑NA 0 Pass ❑Fail ❑NA ❑Pass 0 Fail ❑NA 0 Pass ❑Fall ❑NA <br /> VENT/TRANSITION SUMP ID: -la b C d <br /> Tightness Test Result ❑Pass [-]Fail 0 NA ❑Pass ❑Fail 0 NA ❑Pass ❑Fail ID NA ❑Pass ❑Fail 0 NA <br /> UDC ID: 1 1/2 23/4 35/6 4718 <br /> Tightness Test Result ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA ❑Pass 0 Fail ❑NA <br /> UDC ID: 59110 611/12 713/14 815/16 <br /> Tightness Test Result 0 Pass ❑Fail ❑NA El Pass 0 Fail ❑NA 0 Pass ❑Fail ❑NA ❑Pass 0 Fail ❑NA j <br /> UDC ID: 9 11 10 11 12 <br /> Tightness Test Result ❑Pass ❑Fail ❑NA ❑Pass ❑Fail p NA ❑Pass ❑Fail ❑NA I ❑Pass ❑Fail ❑NA i <br /> All items marked"Fail"or"NA"must be explained in their respective"COMMENTS"section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTI Hi.S TEStiNG <br /> I hereby certify that the secondary containment was tested in accordance with California Collie d RLegulations,Title 23,Division <br /> 3,Chapter 16,Section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> CERS=California Environmental Reporting System,ID=identification,UST=Undergr[xrid Storage Tank,ICG=Internationalf UDC=Under- <br /> Dispenser Containment I �l ii J , \I; ,-4 E;='1 LT H <br /> DEPARTMENT <br />