Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM(Page s of s) <br /> XXI. UNDER-DISPENSER CONTAINMENT TESTING INFORMATION <br /> Manufacturers IdentifyUDC ID from Section III for each Manufacturer <br /> Fiberglass 1 ® 2 ✓ 3 4 5 6 <br /> 7 8 9 10 11 12 <br /> 1 2 3 L 1 4 Lj 1 5 6 ❑ <br /> 7 8 ❑ 1 9 LJ 1 10 ❑ 1 11 El 12 ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ®Industry Code or Engineering Standard(Specify): Hydrostatic <br /> ❑Engineered Method(Specify): <br /> # <br /> Attach the testing procedures and all documentation required to determine the results. of Attached Pages <br /> UDC Testing Training and Certifications(List applicable certifications.) Expiration Hate <br /> ICC UST Certification#8819839 10/25/2019 <br /> INCQN TS-STS L4-Certification#1019623710 9/24/2020 <br /> XXII. COMMENTS <br /> Provide any additional comments here. <br /> UDC 1/2,3/4, 5/6,7/8,11/12 needs further investigation. <br /> UDC 15/16 failed due to torn test boot. <br /> If the facility has more components than this torn accommodates,additional copies of these pages may be attached <br /> UDC=Under-Dispenser Containment;ID=Identfication <br />