Laserfiche WebLink
MORRIS <br /> SHAFFER <br /> E N G I N E E R I N G Page 12 of 15 <br /> Tank Assessment Checklist: FN - T1 Neutralization Stage 1 <br /> Tank Name : FN- Tl Neutralization Stage 1 <br /> Approximate Date of Construction : 12018 <br /> Design Standards : Industry Practice at time of original construction <br /> Approximate Dimensions : 64 " diameter by 69 Height to Top of Vertical Wall <br /> Tank Configuration : Vertical Flat Bottom Tank <br /> Approximate Gross Capacity. 1000 Gallons <br /> Material of Construction : Polyethylene <br /> Approximate Tank Wall Thickness : 3/8" <br /> Tank System Piping: PVC Piping <br /> Internal / External Pumps : External pumps <br /> Leak Detection Equipment: Visual Observation <br /> Corrosion Protection Equipment: N/A <br /> Spill Prevention Equipment: Anchor Cables <br /> I Secondary Containment: Epoxy-coated concrete berm <br /> Hazardous Characteristics of Waste . Acidic wastewater T_ <br /> Description of Structural Damage : The cylindrical tank was visible on all sides and did not show any <br /> signs of damage. The inside of the tank was not observed. The tank <br /> is new and appeared to be in good order. <br /> Results of Leak Test: No leak test was performed but tank was in use during our visit. No M <br /> I visual signs of leaking were present <br /> Foundation : Tank installed on an epoxy-coated concrete slab-on -grade. There <br /> were no signs of settlement around the tank. <br /> Seismic Anchors : Seismic anchor brackets are anchored to the epoxy-coated concrete <br /> slab- on -grade. Stainless steel cables are attached to the top of the <br /> i brackets and wrap around the top of the tank. <br /> Estimated Remaining Service Life : 25+ years <br /> Comments : This tank is new and appears to be in good condition. <br /> 1300 INDUSTRIAL ROAD , SUITE 14, SAN CARLOS , CA 94070, ( 650 ) 595-2973 FAX ( 650 ) 595-2980 <br />