Laserfiche WebLink
Since the two pumps will alternate, a check valve is to be installed on each 2" discharge line from <br /> each pump before connection into a single 2" line. A reducer will be used to connect this 2" <br /> discharge line to an"end-feed" 4" tightline manifold that is to be capped at the opposite end. <br /> Three,4" dia. perforated leachline pipes are to "Tee"connect to this manifold and will allow the <br /> distribution of effluent through these three pipes,with the perforations set at the 4 o'clock and <br /> 8 o'clock positions. The pipes are to be capped at the ends and equally spaced in a 25 ft N-S x 30 <br /> ft E-W=750 sf filter bed filter bed. Twelve inches of drain rock are to be placed below the pipes <br /> and 2" of drain rock above the pipes,then covered with filter fabric. Backfill with excavated soil <br /> to a depth of 6" over the filter fabric to match surrounding grade. <br /> Attached to this document, is a Duplex Pump Station from Septic Solutions, Inc. to give additional <br /> detail of the proposed system. It is my understanding that Mr. Jorge Cabrera is to be the contractor <br /> for this project. Mr. Cabrera is under no obligation to use this system from Septic Solutions; it is <br /> only included to provide guidelines. <br /> If there should be any questions regarding the contents of this document,please contact the <br /> undersigned. <br /> Respectfully submitted, tofess; <br /> CHESNEY CONSULTING �a4 °d <br /> 0 D. Che�ro, <br /> '0 No.71 79 n <br /> � n <br /> ti <br /> Don Chesney, PE ����o civil <br /> Registered Civil Eng7eer C75479 of Ca,,foc <br /> ATTACHMENTS <br /> Septic Solutions, Inc. Pump Chamber/Duplex Pump System Example <br /> Page 2 of 2 <br /> Chesney Consulting <br />