Laserfiche WebLink
1 D OCR 67450.3, 67450.7 Failed to conduct and submit a phase one environmental al <br /> OBSERVATION: The facility has been treating hazardous waste for more than one <br /> complete copy of the Phasel Environmental Assessment to the San Joaquin Coun <br /> Department (EHD). <br /> REGULATION t. DA E, (a) An owner or operator of a facility who operates a fi <br /> permit by rule pursuant to section 67450.2(a) or section 67450.2(b) shall complete <br /> the facility. Corrective action shall consist of a phase 1 environmental assessment � <br /> and Safety Code section 25200.14 and subsequent corrective action conducted in <br /> requirements in section 684-D0.16 as necessary to protect human health and the eri <br /> hazardous waste or constituents from any solid or hazardous waste management L <br /> the time at which waste was placed in the unit. <br /> (1 ) For purposes of this section, a '-facility" shall include the entire site that is under <br /> operator of the faoility who is operating or proposing to operate a FTU under a perr <br /> (2) For purposes of this section, a phase I environmental assessment means a prel <br /> on reasonably ava[laWe knowledge of the facility, [nclud[ng, but not limi#ed to. histol <br /> releases: visual and other surreys, records, consultant reports. and regulatory ages <br /> 1 environmental assessment shall consist of completion of the Phase 1 Environmel <br /> developed by the California Department of Toxin Substances Control (DTSC) purst <br /> � ) The phase 1 environmental assessment shall be conducted and submitted to th <br /> initial notification submitted to the EHD pursuant to section 67450-2(b)(2), <br /> (b) The notifications required pursuant to sections 7450.2(b)(2) and 67450-3(a)(3) <br /> notifications required by sections 67450,3(a)(4), 67450.3(c)(1 ) or 67450,3(c)(2) she <br /> environmental assessment has been completed. The owner or operator of the FTU <br /> Environmental Assessment Checklist to the EHD. The certification shall be signed { <br /> Code section 2200.14(d), <br /> Rob Ashe <br /> Finance/HR-JL Precision, Inc. <br /> 2360 Zanker Road I San Jose, CA 95131 <br /> 2 408-727-6633 Ext. 111 I a 408-410-9548 I W rashe@ilprecision.com <br /> www.ilprecision.com <br /> From: Baker, Lydia [EHD] <Ibaker@sjgov.org> <br /> Sent:Thursday, September 10, 2020 7:36 AM <br /> To: Corey Dehl <corey@mfinish.com> <br /> Cc:Tony Grizelj <tonyg@JLPrecision.com>; Rob Ashe <rashe@JLPrecision.com>;juliette@morris-shaffer.com <br /> Subject: RE: Extension for response to Haz Waste Tank Re-cert for Metal Finishing Solutions, Stockton <br /> Hello Corey, <br /> Please turn in the Return to Compliance certification within the 30 days. Anything that will take longer please include <br /> the expected completion date of October 2020 for those items. <br /> 2 <br />