My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:39:23 AM
Creation date
9/1/2020 4:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Map ID MAP FINDINGS <br /> Direction <br /> Distance EDR ID Number <br /> Elevation Site Database(s) EPA ID Number <br /> RICHARD PITTMAN ELEMENTARY SCHOOL (Continued) S105754280 <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Preliminary Endangerment Assessment Report <br /> Completed Date: 02/15/2004 <br /> Comments: Further action required for metals and OCPs in soil,and VOCs in soil <br /> vapor. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Preliminary Endangerment Assessment Report <br /> Completed Date: 04/21/2004 <br /> Comments: Not reported <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Removal Action Workplan <br /> Completed Date: 06/28/2005 <br /> Comments: Not reported <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Technical Report <br /> Completed Date: 01/19/2005 <br /> Comments: Information only report.Warehouse excavation observation&sampling <br /> report. Info only. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Preliminary Endangerment Assessment Workplan <br /> Completed Date: 07/23/2003 <br /> Comments: Not reported <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Supplemental Site Investigation Report <br /> Completed Date: 01/28/2004 <br /> Comments: Informational only.SSI for soil vapor testing.No comments provided. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Supplemental Site Investigation Report <br /> Completed Date: 06/10/2004 <br /> Comments: Information only.Soil vapor and additional metals sampling.No <br /> comments prepared. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Supplemental Site Investigation Report <br /> Completed Date: 08/03/2004 <br /> Comments: Information only.SSI workplan addendum for additional soil sampling <br /> around Grant House and Rehabilitation Center. No comments prepared. <br /> Completed Area Name: PROJECT WIDE <br /> Completed Sub Area Name: Not reported <br /> Completed Document Type: Supplemental Site Investigation Report <br /> Completed Date: 12/21/2004 <br /> Comments: Information only.SSI sampling addendum for additional soil vapor and <br /> TC4914603.2s Page 186 <br />
The URL can be used to link to this page
Your browser does not support the video tag.