My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:39:23 AM
Creation date
9/1/2020 4:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSURE PLAN <br /> Closure Cost Estimate—Metal Finishing Solutions <br /> FTUs—Total Closure Cost <br /> 1325 el Pinal Drive, Stockton CA 95205 <br /> (Date: 7/28/2020) <br /> For Year 2020 <br /> No. Closure Procedure/Item Quantity Unit Cost Total Cost <br /> 1 Removal, treatment (on-site or off-site), or 5 hrs. 50.00 250 <br /> disposal of waste inventories <br /> 2 Removal and disposal of soil 0 hrs. 50.00 0 <br /> 3 Decontamination of equipment and structure 1 500.00 500 <br /> 4 Demolition and removal of containment 11 6750.00 6750 <br /> system components or structure <br /> 5 Transportation 1 250.00 3912 <br /> 6 Sampling and analysis of waste, soil, 1 1000.00 1000 <br /> equipment, and structure <br /> 7 Certification or other demonstration of 103 250.00 2500 <br /> closure ("clean" closure or specified level of <br /> decontamination)—Closure Report <br /> 8 Other expenses (specify) 14 900 900 <br /> • Permit fees <br /> 9 Less Assets (salvage value of waste, 02 0 0 <br /> equipment or property) <br /> FTUs Closure Total $15,812 <br /> 1-Cost of 20 yards non RCRA contaminated Haz Waste bin transported and disposed of at Buttonwillow,CA—Nov 6,2017 <br /> 2-Per IES,$0 salvage value for used treatment equipment.Equipment to be properly disposed of as non RCRA Haz Waste. <br /> 3-Adjusted to 10 hours to prepare FTU closure report—IES estimate <br /> 4—fee cost estimate per Fremont FD permit adjusted to FTU closure fees for FTU closures <br /> Closure Cost Adjustments <br /> U.S. Dept. of Commerce Inflation Factor) <br /> Year Factor Adjusted Total Cost <br /> 2018 1.0 $15,812 <br /> 2019 1.03 $16,286 <br /> 2020 1.021 $16,628 <br /> Metal Finishing Solutions, Inc. (revised 7/28/2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.