Laserfiche WebLink
Baker, Lydia [EHD] <br /> From: Tony Grize1J <tonyg@JLPrecision.com> <br /> Sent: Wednesday, October 7, 2020 12:03 PM <br /> To: Baker, Lydia [EHD] <br /> Cc: Corey Dehl; Scott Renfrew; Rob Ashe <br /> Subject: RE: PBR RTC <br /> Attachments: Onsite Hazardous Waste Treatment_Written Estimate of Closure Plan and <br /> Costs-2020-10-7.pdf <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Hi Lydia, for#213, 1 added your four highlighted items to our Closure Cost Estimate to create a new and updated <br /> "Closure Plan and Closure Cost" document. I also update the Closure Cost estimates for 2021. <br /> Please let me know if the attached is adequate to close out#213 and I'll then upload to CERS. Thanks. <br /> Best regards, <br /> Tony Grizelj <br /> Sr. Vice President-JL Precision,Inc. <br /> 2360 Zanker Road I San Jose,CA 95131 <br /> 2 408-727-6633 Ext.103 1 ® 408-569-5292 1 W tonvg@ilprecision.com <br /> www.alprecision.com <br /> From: Baker, Lydia [EHD] [mailto:lbaker@sjgov.org] <br /> Sent:Tuesday, October 06, 2020 4:06 PM <br /> To:Tony Grizelj <tonyg@J LP recision.com> <br /> Cc: Corey Dehl <corey@mfinish.com>; Scott Renfrew<srenfrew@iesengineering.net>; Rob Ashe <br /> <rashe@J LPrecision.com> <br /> Subject: PBR RTC <br /> Hello Tony, <br /> I will provide separate responses for the two inspections. This is for the PBR response. I reviewed what you sent over <br /> and closed out six of the open violations. Three of the open violations you provided a finish date of 10/30/2020. For <br /> #213 1 need some additional information. The closure plan should include these items which I did not see: <br /> 1. A description of how and when each FTU will be closed. The description shall identify the maximum extent of the <br /> operation during the life of the FTU(s), and how the applicable requirements of sections 66264.178, 66265.114, <br /> 66265.197(a), 66265.197(b), (c)(1) and (c)(2) and 66265.404 will be met; <br /> 2. An estimate of the maximum inventory of waste in storage and in treatment at any time during the operation of the <br /> FTU(s) at the facility; <br /> 3. A description of the steps needed to decontaminate the treatment equipment during closure; and <br /> 4. An estimate of the expected year of closure and a schedule for final closure. The schedule for final closure shall <br /> include, at a minimum,the total time required to close each FTU. <br /> If you have any questions please let me know. <br /> 1 <br />